Skip to content

epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056

Open
29 of 35 issues completed

Description

@dezren39

Drew's 2026-10-28 directive, LIST 6–15: the ID platform expansion — core build, first apps, comms, currency, hosting, notes, chat, boards. Full text: hatch-personal memory/topics/id-program-2026-10-28.md. High priority; does not preempt in-flight work.

Children:


Program: Drew's 2026-10-28 directive (full text: hatch-personal memory/topics/id-program-2026-10-28.md).
Working pattern: parallel investigations, then the named synthesis issue merges them into a full design. Route guidance: Workhorse by default; Specialist/Summit for synthesis and ramification-heavy work. A result that says "done" is not the endpoint — the orchestrator reviews it and may commission another round. Deliverables: a markdown design/investigation doc (mermaid/SVG diagrams welcome) linked from this issue, plus follow-up issues for anything buildable. Build a proof of concept where the design calls for one, but do NOT build the permanent feature on top of an unreviewed PoC.

Acceptance criteria

  • Every child investigation/design issue in the program (LIST 6-15) reaches a written conclusion or a synthesis issue
  • The synthesis issues merge their investigations into v1 designs for core, chat, boards, hosting and currency
  • Children that stall are named on this epic with their blocker rather than sitting silently

Activity

  1. added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    on Oct 29, 2026
  2. developing-today commented on Oct 29, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    Dispatch intent (orchestrator note, 2026-10-28): enqueue children as normal fleet work. Investigations run on Workhorse; synthesis/design issues (#2028, #2031, #2033, #2036, #2039, #2043, #2046, #2048, #2051, #2054, #2062, #2063, #2066) are gated on their named investigations and go to Specialist/Summit-grade routes when their inputs land. ALREADY DONE — do not redo: #2040 (TigerBeetle) and #2044 (Cloudflare fit) investigations are complete; reports are in PR #2067 and summaries are commented on both issues. Follow-on batch already filed: #2057–#2066 (Workers follow-ons + currency control plane/conversion engine/topology/refundable grants). PoCs (#2031 sticky-notes) must not become permanent features without a review round. Full program text: hatch-personal memory/topics/id-program-2026-10-28.md.

  4. added
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    meta/epicEpic / bundle of related work
    priority/highImportant and time-sensitive
    source/humanFiled directly by a human
    on Oct 29, 2026
  5. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    Intake review

    Umbrella epic for Drew's 2026-10-28 directive, LIST 6-15 (full text in hatch-personal memory/topics/id-program-2026-10-28.md); the body states the program is high priority and does not preempt in-flight work. Not resolvable by a single PR — closure is by child completion. Intake note: several children (#2059-#2073) were enriched in the previous monitor run; this pass covers the remaining #2051-#2058 batch. Risk: epic drift — the fleet's standing rule is that anything blocked surfaces rather than sitting silently.

    — repo-fleet-monitor intake enrichment (protocol §5): acceptance criteria appended to the body where missing, labels normalized, meta/enriched applied.

  6. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    Wave-1 enqueued at top priority (2026-10-29). The ID-side wave-1 investigations/designs from this epic — #2026, #2027, #2029, #2030, #2032, #2034, #2035, #2037, #2038, #2041, #2042, #2045, #2047, #2050, #2052, #2053, plus batch-2 #2057–#2066 — are enqueued as triage tasks 3343–3368 in repo-health-code-pilot at queue priority 20, after the producers did not convert them. Already done: #2040, #2044. Syntheses and PoCs (#2028, #2031, #2033, #2036, #2039, #2043, #2046, #2048, #2051, #2054) stay gated on their named inputs.

  7. 88 remaining items

  8. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Picked up by felix — working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live while felix posts progress markers; after 30 minutes of silence any other worker may pick this up.)

  9. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: reconciliation
    by: agent felix (kind muse, Muse sandbox seat)
    at: 2026-11-22

    Reconciliation of this epic against fresh state (origin/main dee25f7 + live issue states, all read firsthand this pass). Supersedes the 2026-11-14 audit (task 15268) where it differs.

    Body-list children (#2026-#2054): 26 of 29 CLOSED

    Native sub-issues added after filing

    Acceptance check

    The epic stays open as the program tracker until #2031 and #2036 close and the #3195/#9106 lines conclude. Next action after this pass: review of the #3790 PoC PR.

  10. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Released by felix (outcome: free). Epic reconciled (note 7087225171): 26/29 body children closed; remainders named per strand. Next slice landed as PR #12707 (#3790 first-app PoC, unmerged for Felix review). Epic stays open as program tracker; remaining items externally owned (#2039 Drew review, #3797 blocked, #557 Drew design question) or in flight (#3796 gossip-wiring remainder).

  11. added and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 22, 2026
  12. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Agent note — Lane AX (archer, Muse sandbox lane) · claim + evidence-map verdict · 2026-11-22 ~17:20 CST

    Claim scope: verification/evidence-map only, alongside existing owners. Felix claimed this epic 2026-11-22T22:54Z, posted a full reconciliation (comment 7087225171), and released it free at 23:15:01Z — this lane does no implementation and no design work on #2056, and does not duplicate Felix's pass; it independently re-verifies that map against live state and records the deltas since it landed. ID design work remains on the orchestrator/Specialist-Summit path per this epic's own routing; nothing here starts any.

    Premise verdict: the epic's premise is confirmed — it is a container whose closure is by children ("not resolvable by a single PR"), and no bounded, already-designed, unblocked, unclaimed implementation slice remains for a repo-worker lane: the one such slice (the #3790 first-app PoC) was claimed, built, and merged by Felix in this same hour. Path taken: evidence map, not a PR.

    Fresh verification (firsthand gh reads this pass, 2026-11-22 ~23:20Z)

    By LIST strand (body list):

    Delta since Felix's reconciliation (comment 7087225171, 22:59Z)

    Exact remainder for #2056

    1. id: design: ID messaging/relay protocol v1 #2036 OPEN — messaging/relay tracker. Synthesis merged (PR design(id): #2036 messaging/relay protocol v1 #3833); phases 1–2 CLOSED (id: protocol v1 phase 1 — session header + segment checkpoint event kind (#2036) #3794, id: protocol v1 phase 2 — PoC: intermittent-signature live stream for collaborative editing (#2036) #3795). Phase 3 id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796 OPEN: parts A+B merged 2026-11-16 (PR id-sync: chained-message relay envelope + signed hop record types (#3796 part A) #10785, PR feat(id-sync): validate-before-forward relay gate for chained messages (#3796 part B) #10804); remainder is the live gossip/ingest wiring of the validate-before-forward gate. Phase 4 id: protocol v1 phase 4 — retention and compaction for the event store (#2036) #3797 OPEN, status/blocked. Companion PoC id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 OPEN, gated on id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796.
    2. id: design: match attestation + audit v1 #2039 OPEN — match attestation + audit v1. Synthesis delivered (PR design(id): #2039 match attestation + audit v1 #3807 merged); all decomposition children CLOSED. Remainder is only the orchestrator/Drew design-review round — a person-gate under the LIST-10 pattern, not queue work.
    3. id(app): PoC — sticky notes + did-it tracker, the first ID app (Phase 3 of #2031) #3790 OPEN — bookkeeping closure pending the review round (see flag above); the PoC itself is merged via PR test(id): first app PoC — sticky notes + did-it tracker (#3790) #12707.
    4. pkgs/id: build-time review — runtime performance first, then build time (cold check build ~16 min, tests run 12 s) #3195 OPEN — pkgs/id build-time review. Crate split pkgs/id: split the monolith crate into sub-crates along module seams (prioritized by Drew 2026-11-01) #3447 fully landed (steps pkgs/id crate split — step 1: extract id-caps (workspace + leaf foundation already landed as id-core) #4403, pkgs/id crate split — step 2: extract id-store, then id-events #4405–pkgs/id crate split — step 6: extract id-directory, then id-web #4409, pkgs/id crate split — step 7: extract id-cli; facade slimming #4411 all CLOSED; pkgs/id: split the monolith crate into sub-crates along module seams (prioritized by Drew 2026-11-01) #3447 CLOSED). Live remainder is the performance line carried by id(world): F12.12 many worlds per node: 1,000 idle / 100 active with a per-world memory budget #557 OPEN (Fix 1 + Win A merged; an unloaded-laptop re-run and Drew's async input_ack design question remain — the design question is Drew's).
    5. epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106 OPEN — ID/Atlas primitives sub-program. Children epic(id): Part A — ID core: namespaces, ID shapes, triples, user attributes #9107, epic(id): Part B — federation & trust: peer classes, signed data, federated query, reputation #9108, epic(atlas): Part C — Atlas-facing: storage economics, benchmarks, ID search, recommendations #9109, design(id): extensibility architecture — primitive/adapter/hook boundary spec + backend conformance #9110, design(id): modes & configuration surface — modes, link kinds, storages, tiering as config #9111 OPEN; plan: refine and prioritize the #9106 program — sequencing for quick results, nothing dropped #9112 CLOSED. Phase 12 exit audit id: Phase 12 exit audit and the id/v0.12.0 tag #12231 OPEN (6 met / 2 not met / 1 unmeasured per Felix's note) with blockers id: A9 five-minute path — scripted empty-directory-to-joinable-world run with elapsed time #12595, id: F12.8/A7 third guest language — Zig SDK passing conformance with a playable example #12596, id: Phase 12 exit evidence — authority-boundary audit (criterion 9) #12597 OPEN (states re-verified this pass).
    6. Other native sub-issues, each on its own track: id: implement ID conversion engine - linked transfer pairs and rate authorisation (design #2063) #5536 OPEN (status/waiting-dependency — conversion-engine implementation), id: Phase 14 — hosted, federated, local-first (plan of record) #6312 OPEN (Phase 14 plan of record, status:to-do), epic(id): maintenance #12462 OPEN (ID maintenance epic).

    Acceptance check

    Closability call

    Not closable yet, and not closed by this lane (epic closures are the parent's call). The epic correctly stays OPEN as the program tracker until #2036 closes, the #2039 review round is recorded, #3790's bookkeeping is resolved by its owner, and the #3195/#9106 lines conclude — or Drew rules the program scope complete. No new issues filed; no untracked remainder found.

  13. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    OpenChamber lane oc-code-02 — acceptance recheck (2026-11-23)

    Current checkout evidence: the LIST 6–15 children each have a written conclusion or synthesis. The five requested v1 designs are present: doc/2026-11-01_design_id2028.md (core), doc/2026-11-01_design_id2051.md (chat), doc/2026-11-01_design_id2054.md (boards), doc/2026-11-01_design_id2046.md (hosting), and doc/2026-11-01_design_id2043.md (currency). The remaining open synthesis trackers also have their synthesis delivered: #2036 (doc/2026-11-01_design_id2036.md; remaining phases tracked by #3796/#3797 and companion #2249) and #2039 (doc/2026-11-01_design_id2039.md; its implementation children were reported closed in the #2039 review history). They remain open for their documented review/parent-tracking reasons, not because their synthesis is missing.

    No additional implementation slice is actionable on this epic without duplicating those child routes. Keep #2056 open for the program review; next work is the existing child review/blocker routes.

  14. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · criterion-by-criterion reconciliation (Lane HM, 2026-11-23)

    Fresh verification against current main for the #2056 currency line's critical path:

    #5521 (implement RateAuthorisation as a signed ID-graph object, design #2290) — acceptance already landed; closed as completed by this pass.

    Effect on #5536 (conversion engine): its two named blockers were #5521 and #5522. #5521 is now closed. #5522 (implement ID currencies v1) remains open; its work proceeds on the #2062 packet line — F1 #2317, F2 #2318, F3 #2319 closed, and the gateway composition PoC #2321 closed 2026-11-23 via PR #12960. #5536 stays status/waiting-dependency on #5522 alone.

    Epic child map, verified fresh 2026-11-23 (35 sub-issues): 30 closed (29 prior + #5521 this pass), 5 open:

    Next concrete slice: #5522's remainder on the packet line (the currencies-v1 implementation), which is now the single gate for #5536.

  15. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · progress — next slice landed on the #2036 line (Lane HL, via fleet agent next on this epic)

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/id-platformEpic: id-platform - all issues of this effort carry itepic/id-programReprioritization program epic (2026-11-12)kind/enhancementmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/highImportant and time-sensitivequeue/queuedHas a queued queue tasksource/humanFiled directly by a humanstatus/triagedTriaged and routed (see agent note)task/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions