Skip to content

plan: refine and prioritize the #9106 program — sequencing for quick results, nothing dropped #9112

Closed
0 of 2 issues completed

Description

@dezren39

Program #9106 (extensible primitives / federation / namespaces), Drew directive 2026-11-12 18:29 CST.
Parent: #9106.

Refine-and-prioritize pass over program #9106: order the parts/components for fastest useful results first (substrate before federation before economics polish, unless evidence says otherwise), mark each component now / next / later (~3 months out is a legitimate slot — being in the plan is the requirement, being early is not), name dependencies between components and on #9078/#9091 lines, and record the sequence on #9106. Re-run the pass whenever a part's design lands. Nothing may be dropped from the inventory to make the plan shorter; deferral must be explicit with a slot.

Activity

  1. added
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    epic/id-programReprioritization program epic (2026-11-12)
    epic/atlas-programReprioritization program epic (2026-11-12)
    on Nov 13, 2026
  2. developing-today commented on Nov 13, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Nov 13, 2026

    @dezren39
    MemberAuthor

    FIRST-CUT SEQUENCE (intake, 2026-11-12; this issue owns refining it as designs land):

    NOW (substrate + cheap evidence first): #9110 primitive/adapter/hook boundary (everything hangs off it) · #9113 ID shapes · #9114 sidecar format · #9116 namespace registry · #9118 array-address core · #9133 benchmark harness (evidence is cheap now, expensive to retrofit).
    NEXT (once cores exist): #9115 location index + harvester · #9117 id:// · #9120 core (a) spec · #9119 shorthand/streaming · #9125 triple encoding · #9141 trust classes + signed acceptance · #9144 federated fan-out · #9142 trusted sync/conflicts · #9138 ID search vectorization · #9127 append-lists · #9134/#9135 cache + placement (fed by #9133 results).
    LATER (~3 months out is a legitimate slot; in the plan, not dropped): #9143 CRDT exploration · #9147 reputation log · #9148 takeover research · #9124 signed worlds · #9126 graph viz · #9111 modes/config polish · #9139/#9140 recommendation depth.

    Rule: deferral is explicit with a slot; nothing leaves the inventory to shorten the plan.

  4. dezren39 commented on Nov 13, 2026

    @dezren39
    MemberAuthor

    agent-note:v1 agent=repo-worker-code task=15354 stage=sequence_review_ready — Refined sequencing is now committed in PR #9238 (437921a): doc/2026-11-13T03-40-00Z_design_id-atlas-summit/crosscut/sequencing.json plus sequencing-draft.md. All 39 IDs #9110–#9148 have explicit research/design/implementation slots, hard output prerequisites, waves, and review-dated horizon reasons; the 12 formerly omitted components are retained. Narrow stdlib verifier passes coverage, DAG/wave, file-ownership and config oracles. Important corrections: #9145 request identity/dedup precedes enabled #9144 fan-out; #9146 research does not require running fan-out; V2 emergency revocation is in #9141, advanced #9148/#9147 machinery stays later. Research can start before implementation prerequisites; hard edges do not mean an entire sibling program must finish. This is a review-ready design refinement, not merged-design acceptance or implementation completion. Original inventory is unchanged.

  5. added
    task/small-fixQueue packet kind: bounded fix with reproduction and targeted tests
    on Nov 17, 2026
  6. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triaged

  7. 148 remaining items

  8. added
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 19, 2026
  9. dezren39 commented on Nov 19, 2026

    @dezren39
    MemberAuthor

    Task 20306 claimed and checkpointed. Fresh verification confirms #9112/#9106 remain OPEN and assigned to dezren39; #10284 remains OPEN; #9238 is MERGED and no matching open PR exists; #9078 is OPEN and #9091 is OPEN/blocked. Existing sequence is already delivered, but explicit dependency acceptance and Drew's dedicated planning-window confirmation remain absent. No duplicate planning or worktree/source edits. Next: park pending those conditions.

  10. dezren39 commented on Nov 19, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: blocked (escalated-to-user)
    task: 20306 · lane: oc-code-03 · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Fresh revalidation: #9112 and #9106 remain OPEN and assigned to @dezren39; #10284 remains OPEN; PR #9238 is MERGED and no matching open PR exists. The 39-component sequence is already delivered. The remaining request is a dedicated owner planning-window confirmation and explicit acceptance of dependencies on #9078/#9091; neither has appeared in fresh issue history.

    This decision-bearing program sequencing belongs to Drew. After repeated park/revalidate cycles across lanes today, this is escalated-to-user rather than re-parked. No duplicate planning/edit/worktree was created.

    To resume (Drew): confirm the dedicated planning window and record acceptance (or specific corrections) for the #9078/#9091 dependencies. Then task 20306 revalidates #10284, live #9106 inventory and dependency links, and addresses only any remaining acceptance gaps without duplicating the delivered sequence.

  11. added
    user/escalatedRequires a Drew decision or access
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 19, 2026
  12. removed their assignment
    on Nov 20, 2026
  13. dezren39 commented on Nov 21, 2026

    @dezren39
    MemberAuthor

    Decided: the 39-component sequence delivered here on 2026-11-19 stands as recorded, and so do its dependencies on #9078 and #9091. No planning window or further confirmation is needed. This issue's work is done, so it is closed.

    Why: the sequence was delivered and nothing in it was disputed. Six claims in two days re-verified the same state and parked again; none of them found a gap in the sequence itself.

    Undo: re-order rows here or on #9106 with a reason.

    Next: the first path through the stack is #12232 (plan Track B).

    By: Claude, in the 2026-11-21 priorities session, under FDR-0013. Nothing here waits on anyone.


    Generated by Claude Code

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    epic/atlas-programReprioritization program epic (2026-11-12)epic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingqueue/blockedQueue or user escalation statestatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testswork/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions