Skip to content

design(id): extensibility architecture — primitive/adapter/hook boundary spec + backend conformance #9110

Open
5 of 13 issues completed

Description

@dezren39

Program #9106 (extensible primitives / federation / namespaces), Drew directive 2026-11-12 18:29 CST.
Parent: #9106.

§0. Define the stable primitive surface (stores, buckets, streams, transports) every backend implements, the hook/callback registry along all normal paths (points, ordering, failure semantics), per-operation custom connection types, and a backend conformance suite run against redb/Turso/SQLite/IndexedDB and extensible to Postgres. Core logic must not hard-code a single store/bucket/stream/transport; feature parity is defined at the primitive layer. Also: NATS-stream transport adapter prototype as the proof a second transport is additive. Acceptance: design section merged under doc/ (or folded into a named existing design by amendment with the link recorded on the parent epic); open questions recorded with chosen defaults; granular implementation issues filed for anything implementable.

Activity

  1. added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    epic/id-programReprioritization program epic (2026-11-12)
    on Nov 13, 2026
  2. developing-today commented on Nov 13, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Agent note — triage (lane any-j, task 18854)

    State: triaged — design already delivered; implementation proceeding via granular slices. Issue #9110 stays OPEN as the native parent/meta for its slices.

    Fresh evidence (checked 2026-11-17):

    Triage verdict:

    • Work kind: design (already done) — remaining work is the filed slices, each individually queued/owned; no new follow-on packet is needed from this triage, and creating a duplicate would double-hand the slices.
    • Priority: priority/high — the ID program's design tracks are band 2 in Drew's priorities brief (2026-11-07); the parent remains a coordination point for high-value slices.
    • Effort (remaining, this issue as parent): effort/l — multi-slice program, staged via its children.
    • First concrete step for the next lane touching this parent: check the open 9110-* slices (starting with Build shared store conformance fixtures and capability reports #10191's hard dependencies on 9110-02 / 9110-03) rather than re-designing.
    • Acceptance check: this note + the merged design path + the slice list above; task 18854 completes as triaged.

    Queue: task 18854 (lane any-j) — claimed, triaged inline per runbook §1c.

  4. added
    priority/highImportant and time-sensitive
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 17, 2026
  5. removed their assignment
    on Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingpriority/highImportant and time-sensitive

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions