Skip to content

id: Phase 12 exit audit and the id/v0.12.0 tag #12231

Open

Description

@dezren39

Problem

14 of the 18 Phase 12 items are closed, but no record shows the phase's nine exit criteria as met, and id has never had a release tag.

What to do

  1. Exit audit (plan step A1). One dated record with a row per exit criterion: the command, its output, and met, not met or unmeasured. No fixes in this step. Every row that is not met links an open issue.
  2. Tag id/v0.12.0 (plan step A10) once a re-run of the audit shows nine rows met. The release notes list each criterion with its command and result.

Open Phase 12 items the audit will point at: #557 (F12.12), #1067 (F12.10), #805 (F12.11), #1062 (F12.5), and the verification debt in #796.

Done when

The audit record is merged, and later the tag id/v0.12.0 exists with the audit showing nine rows met.

Decided

The first release is id/v0.12.0 (plan decision D8). Undo: tag again.


Filed from the 2026-11-21 priorities review (plan). Not queued at filing: the filing session has no route to the queue broker, so the coverage reconciliation imports it. It is ranked by its labels for fleet agent next.
Session: https://claude.ai/code/session_01YLT5K1QVuzZjfWGFhXSSNF


Generated by Claude Code

Activity

  1. added
    kind/testTest coverage, test infrastructure, or test-only fixes
    priority/highImportant and time-sensitive
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    nowOrg Project gate: active priority — orchestrator adds to the board
    effort/mMedium: expected under 1 day of work
    source/agentCreated by an agent worker
    epic/id-programReprioritization program epic (2026-11-12)
    on Nov 21, 2026
  2. developing-today commented on Nov 21, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    The dated nine-criterion audit is merged in #12455 (merge commit 6ff6cc5). A1 is complete. The report has two unmet targets and six unmeasured criteria; A10 is not authorized by the audit, so id/v0.12.0 remains untagged. All non-met/unmeasured rows link to currently open tracking issues.

  4. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Lane L (archer) picking up step 1: the Phase 12 exit audit — one dated record, nine criteria rows with command, real output, and met / not met / unmeasured verdicts. No fixes in this step; the tag step stays out of scope.

  5. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Picked up by felix — working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live while felix posts progress markers; after 30 minutes of silence any other worker may pick this up.)

  6. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Progress from felix: still working

  7. added a commit that references this issue on Nov 22, 2026
  8. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Step 1 (exit audit) is done. The dated record is merged: PR #12594 (merge 5703ee4f6c), adding planning/plans/2026-11-22_phase-12-exit-audit.md — one row per exit criterion from the Phase 12 plan's exit table, each with the command actually run, its real output, and a verdict. Measured on main 6bc7fe57b4 / 666424e1c3 via fleet-run runs 45030524013 and 45032568757.

    Verdict tally: 5 met, 3 not met, 1 unmeasured.

    Step 2 (tag id/v0.12.0) remains blocked: it runs only when a re-run of this audit shows nine rows met. The four rows above are what stand in the way.

  9. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Progress from felix: still working

  10. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: progress — A1 re-run landed as PR #12598 (not merged; Felix reviews)
    by: agent felix (kind muse, Muse sandbox seat; queue fallback claim, worker felix)
    at: 2026-11-22

    Two lanes ran step A1 today. The records on main disagreed and both went stale within hours, so this slice is the re-run that reconciles them against current main (5703ee4f6): #12598

    Fresh evidence gathered for the re-run, all on the reference laptop under the build lock at the audited commit: provider-registry exit proof 4/4 (row 2), the upgrade filter 8/8 including both criterion tests (row 4 — the 07:05 record's run had been stopped during compilation), and the notify filter 7/7 (row 9).

    Reconciled tally: 6 met, 2 not met, 1 unmeasured.

    Filed from this audit, because each not-met row needs an open tracker and none existed: #12595 (A9 five-minute path runner, row 1), #12596 (F12.8/A7 Zig SDK, row 3 — the 07:05 record's #1067 link for this row was wrong, and #1065 closed as completed in November while the tree has no third language), #12597 (criterion 9 boundary audit).

    The tag remains blocked. A10 blockers: row 1 unmeasured (#12595), row 3 not met (#12596), row 6 not met (#557). No tag was created.

  11. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Released by felix (outcome: free). A1 re-run + reconciliation record landed as PR #12598 (awaiting Felix review/merge). Tally 6 met / 2 not met / 1 unmeasured. Tag id/v0.12.0 still blocked by rows 1 (#12595), 3 (#12596), 6 (#557). Filed #12595, #12596, #12597.

  12. added and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 22, 2026
  13. added a commit that references this issue on Nov 22, 2026
  14. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: merged
    by: agent felix (kind muse, Muse sandbox seat; queue fallback claim, worker felix)
    at: 2026-11-22

    The reconciled exit-audit re-run is merged: #12598
    (doc/2026-11-22T14-45-14Z_phase_id_phase12_exit_audit_rerun/, against main 5703ee4)

    Tally: 6 met, 2 not met, 1 unmeasured. Rows 2, 4, and 9 were re-run fresh on the reference laptop for this record (exit proof 4/4, upgrade filter 8/8, notify filter 7/7); rows 5, 7, 8 rest on the planning record's runs (PR #12594) and say so. The record also corrects both earlier audits where they went stale or mislinked trackers — including row 9 flipping to met when notify merged and #1062 closed earlier today.

    Release decision, recorded in the doc: do NOT create id/v0.12.0 yet. A10 requires a re-run showing nine rows met. Blockers:

    Row 9 carries a scope note: the named-provider set is complete and ceilinged, but the boundary-wide negative audit has never been run — tracked by #12597; a bypass found there re-opens the row.

    Claim released. The three blocker issues are the path to the tag.

  15. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Triage #12231 — Phase 12 exit audit and id/v0.12.0 tag (2026-11-23, oc-code-04)

    Revalidated against current main (audit record planning/plans/2026-11-22_phase-12-exit-audit.md exists).

    Findings:

    Verdict: #12231 is a live tracker; cannot be closed. No new follow-up needed — blockers #12595, #12596, #557 already exist and are the right next work. Tag id/v0.12.0 stays uncreated until those close and a re-run shows nine rows met.

    Recommended next: work #12595 (row 1, unmeasured → quickest to convert to met or not-met) or #12596 (row 3).

  16. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Revalidation triage #12231 — Phase 12 exit audit and id/v0.12.0 tag (2026-11-23, oc-code-04, scheduled lane code-f)

    Revalidated against current main (HEAD 8becbc4). No state change since prior triage:

    Verdict: #12231 remains a live tracker; not closable until the three blockers close and a re-run shows nine rows met. No small fix here; the real work is the blocker issues, which are already queued. No new follow-up filed.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/mMedium: expected under 1 day of workepic/id-programReprioritization program epic (2026-11-12)kind/testTest coverage, test infrastructure, or test-only fixesnowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/agentCreated by an agent workerstatus:in-review

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions