Skip to content

impl(pm-stack): primary-parent convention + historical link semantics + crate-split backfill #9066

Open

Description

@developing-today-fleet

Design: doc/2026-11-12T22-50-00Z_design_pm-board-hierarchy-genealogy/note.md sections 3 + 11. Canonical: native sub-issue parent IS the primary parent; primary-parent/<slug> label marks it when the native slot cannot; Metadata block (section 12) is the canonical record; links are records with relation + status (active/historical/removed) — splits retain history, misclassifications are removed.

Acceptance:

Activity

  1. developing-today commented on Nov 12, 2026

    @developing-today
    Contributor
  2. dezren39 commented on Nov 17, 2026

    @dezren39
    Member

    Triage — task 18817, lane any-i, 2026-11-16: first triage of record for #9066. Routed to a scoped implementation follow-on, task 20430.

    Fresh verification (gh + laptop repo, 2026-11-17T05:55Z):

    Triage verdict:

    • Work kind: task/small-fix (queue packet kind small_fix; multi-component implementation, staged in the follow-on's acceptance order).
    • Priority: priority/normal — PM-stack genealogy supporting the pkgs/id: split the monolith crate into sub-crates along module seams (prioritized by Drew 2026-11-01) #3447 crate-split chain (Drew priorities brief lines 2 and 4), not fleet-stalling and not in Drew's expedite set.
    • Effort: effort/l — labels + collector validation + project-reconcile metadata maintenance + chain backfill.
    • First concrete step (follow-on task 20430): create the primary-parent/ labels for the current epic family with descriptions, then collector validation, then reconcile maintenance, then the crate-split chain backfill with readback.
    • Acceptance check: every acceptance bullet on impl(pm-stack): primary-parent convention + historical link semantics + crate-split backfill #9066 verified by readback (labels exist, violations surface in audit output, reconcile reports divergence as a finding, chain genealogy renders from the data).

    Labels applied: task/small-fix, priority/normal, effort/l, status/triaged.

  3. added
    task/small-fixQueue packet kind: bounded fix with reproduction and targeted tests
    priority/normalOrdinary priority (the default)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    status/triagedTriaged and routed (see agent note)
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Nov 17, 2026
  4. dezren39 commented on Nov 18, 2026

    @dezren39
    Member

    Picked up by scheduled lane code-j under queue task 20430. Revalidated #9066 OPEN; no hard-stop labels and no active implementation PR found. The routed scope is effort/l across label creation, collector audit validation, project-reconcile metadata synchronization, and crate-split chain backfill/readback.

  5. dezren39 commented on Nov 18, 2026

    @dezren39
    Member

    Parked task 20430 for 30 minutes because the effort/l acceptance spans multiple components and exceeds this scheduled run budget. No code changes or worktree started. Resume from the queue checkpoint: revalidate GitHub state, fast-forward main, create the task worktree, then implement and test labels/collector validation, reconcile metadata and divergence findings, and crate-split backfill/readback.

  6. 1 remaining item

  7. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    queue/claimedQueue worker lifecycle state
    and removed
    queue/claimedQueue worker lifecycle state
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 18, 2026
  8. dezren39 commented on Nov 18, 2026

    @dezren39
    Member

    Picked up task 20430 again in scheduled lane code-j after the prior 30-minute park expired. Fresh issue/PR checks: #9066 is OPEN, no hard-stop labels, and no active implementation PR exists. Resuming the effort/l implementation from the stored verified checkpoint; no code changes or worktree existed yet.

  9. added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    queue/claimedQueue worker lifecycle state
    status/triagedTriaged and routed (see agent note)
    on Nov 18, 2026
  10. dezren39 commented on Nov 18, 2026

    @dezren39
    Member

    Blocked task 20430 as packet_defect. The acceptance requires project-reconcile.sh to maintain pm-metadata and report divergence, but no implementation of that script exists in developing-today/code; the only tracked script is in dezren39/hatch-personal (workspace/goals/keep-the-four-repos-healthy/hidden_files/project-reconcile.sh). No code changes were made. Resume after confirming this task includes the cross-repository script change, or splitting that work into an appropriately scoped task.

  11. removed their assignment
    on Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-inskind/featureNew feature or capability requestpriority/normalOrdinary priority (the default)queue/blockedQueue or user escalation statestatus/blockedQueue or user escalation statetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testswork/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions