Skip to content

ops(lab): install 3 more Celestia DX010 units #6071

Open

Description

@dezren39

Parent: #6066 (home lab build-out).

Drew's item, verbatim (2026-11-04): "3 more DXO10s".

Model ruling (Drew, 2026-11-05): The dictated model string "DXO10" means Celestia DX010. The model is confirmed; no specs are assumed.

Status: Drew deferred the physical install on 2026-11-05 ("not today"). The physical work remains outstanding.

  • Confirm the exact model: Celestia DX010.
  • Rack/mount the 3 units.
  • Power + network connect all 3 units.
  • Label each unit (label maker).

Done when: 3 Celestia DX010 units are installed, connected, labeled, and the install is recorded on this ticket.

Acceptance criteria

  • The exact model is confirmed as Celestia DX010.
  • All 3 units are racked/mounted, powered, and network-connected.
  • Each unit is labeled and the install is recorded on this ticket.

Activity

  1. added
    kind/choreRoutine maintenance, housekeeping, dependency hygiene
    area/infraInfrastructure, deployment, and operations
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    Contributor
  3. added
    source/humanFiled directly by a human
    priority/normalOrdinary priority (the default)
    effort/sSmall: expected under 2 hours of work
    on Nov 5, 2026
  4. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    Intake review

    Related: parent #6066 (home lab build-out); siblings #6070, #6068 in the same set. No merged PR applies (physical ops work).

    Notes: the body itself flags the model string as possibly garbled — confirming it is step one and is now pinned in the acceptance criteria. Effort/s once the model is confirmed.

    — Fleet monitor intake (repo-fleet-monitor), 2026-11-05. Merged-PR title/body search count for this issue number at intake: 1.

  5. added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    task/triageQueue packet kind: verify, reproduce, and route this item
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed on Nov 5, 2026
  6. 4 remaining items

  7. added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 5, 2026
  8. developing-today commented on Nov 5, 2026

    @developing-today
    Contributor

    Rulings (Drew, main chat 2026-11-05):

    • "DXO10" model confirmed: Celestia DX010.
    • The physical rack/power/label install is not today — it stays blocked on Drew's physical step, deferred by his word.
  9. dezren39 commented on Nov 11, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · still blocked — verified 2026-11-11 (audit follow-up, code#8097)

    • Task: queue task 10434 (blocked, reason class escalated-to-user)
    • Checked: the pending-questions ledger, the dropped-thread-catcher escalation record, this issue's comments, and fleet memory.
    • What remains open: Split gate. ANSWERED half: the model string — ledger item rack-install-6071, Drew answered 2026-11-05: DXO10 = Celestia DX010 (confirmed). STILL OPEN half: the physical install itself (rack, power, network, label 3 units) — Drew's same answer deferred it ('physical install NOT today', 2026-11-05) with no date, and no later completion is recorded. Task 10434 stays blocked on the deferred physical install only.
    • Action: none — the task stays blocked. It was NOT force-unblocked: the recorded answer does not settle the remaining gate above.
  10. added this to the Lab cluster milestone on Nov 12, 2026
  11. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · blocked (escalated-to-user — standing gate re-verified)

    • Agent: queue worker (repo-worker-code), lane code-c
    • Session / ID: task 18441
    • Found via: queue claim
    • Task: Triage of issue ops(lab): install 3 more Celestia DX010 units #6071 (ops(lab): install 3 more DXO10 units) — verdict: still blocked on Drew's deferred physical install; nothing agent-actionable. This task blocks as escalated-to-user on the same standing gate as task 10434.
    • Expectation: blocked = gate named with fresh evidence (below); the task returns when Drew does or schedules the physical install.

    Evidence (fresh, 2026-11-16):

    • Issue ops(lab): install 3 more Celestia DX010 units #6071 is OPEN with status/blocked, queue/blocked, and user/escalated already set — the label state already mirrors this block, so no label change is made by this pass.
    • The split gate's answered half stands: ledger items rack-install-6071 and lab-install-units-6071 are both status answered — Drew confirmed 2026-11-05 that "DXO10" is the Celestia DX010.
    • The open half is unchanged: Drew's same 2026-11-05 ruling deferred the physical install ("not today", no date), and no completion is recorded anywhere on the issue since — the latest activity remains the 2026-11-11 audit note re-verifying exactly this state (code#8097 follow-up).
    • Why the fleet cannot clear it: the acceptance is entirely physical — rack/mount, power, network-connect, and label-maker labeling of 3 units in Drew's lab. No fleet agent can perform or verify those steps, and Drew has deferred the step by his own word.

    Blocker: Drew's deferred physical install of 3 Celestia DX010 units (issue #6071); escalation already delivered and answered in part via ledger items rack-install-6071 / lab-install-units-6071 — the remaining gate is the physical step itself, not an unanswered question.

  12. removed their assignment
    on Nov 20, 2026
  13. changed the title [-]ops(lab): install 3 more DXO10 units (model name as dictated)[/-] [+]ops(lab): install 3 more Celestia DX010 units[/+] on Nov 22, 2026
  14. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Fresh triage revalidation (2026-11-22): #6071 remains OPEN with status/blocked and user/escalated; its physical-install blocker is still live as queue task 10434. The 2026-11-05 ruling already confirmed “DXO10” means Celestia DX010, so I corrected the issue title and checklist (model criterion now complete) and added the hands marker for the first mounting step. The three-unit rack/power/network/label work remains deferred; no duplicate blocker task was created.

  15. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Audit for #12234 (2026-11-22): HANDS ITEM — not clearable yet, no live lane claim.

    What the record already settles: the model question is answered — Drew ruled 2026-11-05 that "DXO10" means Celestia DX010, and the title/checklist were corrected accordingly. What remains is purely physical: Drew deferred the install on 2026-11-05 ("not today"), and the three units still need racking/mounting, power + network, and labelling (hands marker already in the body for the first mounting step; re-verified 2026-11-22, task 10434 still live).

    The one owner action (five minutes at the next on-site pass): rack/mount the 3 Celestia DX010 units, connect power + network, label each, and record the install here. This rides with the cluster physical session list (#1095, #1096, #1097, #1101, #1811) alongside the switch racks (#6073/#6074/#6075).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationseffort/sSmall: expected under 2 hours of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itkind/choreRoutine maintenance, housekeeping, dependency hygienemeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)queue/blockedQueue or user escalation statesource/humanFiled directly by a humanstatus/blockedQueue or user escalation statetask/triageQueue packet kind: verify, reproduce, and route this itemuser/escalatedRequires a Drew decision or access

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions