Skip to content

ops(lab): rewire the mesh Wi-Fi #6068

Open

Description

@dezren39

Parent: #6066 (home lab build-out).

Drew's item (2026-11-04): "Rewire the mesh Wi-Fi."

  • Rewire the mesh nodes onto the new physical plant
  • Verify coverage/roaming in the areas the mesh serves
  • Record the final node placement + any config changes on this ticket (config stored with the fleet configs if it changes)

Sequencing: after edge routing (see #6066).

Acceptance criteria

  • All mesh nodes are rewired onto the new physical plant.
  • Coverage/roaming is verified in the areas the mesh serves, with the result recorded on this ticket.
  • Final node placement and any config changes are recorded here (config stored with the fleet configs if it changes).

Activity

  1. added
    kind/choreRoutine maintenance, housekeeping, dependency hygiene
    area/infraInfrastructure, deployment, and operations
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    Contributor
  3. added
    source/humanFiled directly by a human
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    on Nov 5, 2026
  4. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    Intake review

    Related: parent #6066 (home lab build-out); siblings #6071, #6070. Sequencing per the body: after edge routing (see #6066). No merged PR applies (physical ops work).

    Notes: effort/m rather than s because verification (coverage/roaming) is part of the work, not just the rewire.

    — Fleet monitor intake (repo-fleet-monitor), 2026-11-05. Merged-PR title/body search count for this issue number at intake: 0.

  5. added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    task/triageQueue packet kind: verify, reproduce, and route this item
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed on Nov 5, 2026
  6. 4 remaining items

  7. added
    status/blockedQueue or user escalation state
    user/escalatedRequires a Drew decision or access
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 5, 2026
  8. dezren39 commented on Nov 11, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · still blocked — verified 2026-11-11 (audit follow-up, code#8097)

    • Task: queue task 10431 (blocked, reason class escalated-to-user)
    • Checked: the pending-questions ledger, the dropped-thread-catcher escalation record, this issue's comments, and fleet memory.
    • What remains open: Physical on-site work only Drew can perform: rewire the mesh Wi-Fi nodes onto the new plant and verify coverage/roaming in person (sequenced after edge routing, parent epic epic(lab): home lab build-out — racking, switches, edge routing, mesh Wi-Fi, cluster bring-up (tracking) #6066). No completion evidence and no scheduling answer is recorded in the ledger, the catcher record, this issue, or fleet memory, despite this task's DELIVERED-ANSWERED classification in the 2026-11-11 audit. Task 10431 stays blocked on Drew's on-site execution/scheduling.
    • Action: none — the task stays blocked. It was NOT force-unblocked: the recorded answer does not settle the remaining gate above.
  9. added this to the Lab cluster milestone on Nov 12, 2026
  10. dezren39 commented on Nov 12, 2026

    @dezren39
    MemberAuthor

    Gate answered by Drew (decisions page, set decisions-2026-11-12-queue-cleanup, 2026-11-12T19:15:58Z) — unblocked.

    Drew's answer to the pending-decisions gate lab-mesh-wifi-6068: "yes this is a priority for this weekend"

    The escalated-to-user block on this issue was that answer. It is now recorded on the decisions ledger (item lab-mesh-wifi-6068, status answered, via decisions-page), so the block is cleared: status/blocked, queue/blocked and user/escalated are removed and the issue returns to queue/queued for the fleet to work under Drew's answer. The queue task named in the gate's context is released by the same ruling.

  11. added and removed
    status/blockedQueue or user escalation state
    user/escalatedRequires a Drew decision or access
    queue/blockedQueue or user escalation state
    on Nov 12, 2026
  12. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triaged — physical lab work, Drew-owned; gate already answered, no lane-actionable remainder

    • Agent: repo-worker-code
    • Session / ID: queue task 18438 · lane any-j
    • Found via: repo-health-code-pilot atomic claim (bulk-intake triage packet)
    • Task: Re-verify issue ops(lab): rewire the mesh Wi-Fi #6068 fresh and route it.

    Finding: this is Drew's physical lab item under parent #6066 (rewire the mesh Wi-Fi nodes onto the new physical plant, verify coverage/roaming, record placement/config here). Its history is settled:

    • Task 10431 triaged and escalated it; the escalation was the pending-decisions gate lab-mesh-wifi-6068.
    • Drew answered that gate on 2026-11-12 (decisions set decisions-2026-11-12-queue-cleanup): "yes this is a priority for this weekend" — the block was cleared the same day and the issue returned to the queue under his answer. That decision is recorded and is not re-asked here.
    • Nothing since: no completion evidence on the ticket (the acceptance criteria require the final node placement and any config changes to be recorded here, and none are), and no merged PR applies — this is hands-on hardware work in the lab, not repo work a queue lane can execute or verify remotely.

    Routing: the issue stays OPEN as Drew's lab tracker, priority already set by his answer. No follow-on packet is enqueued (there is no scoped repo work to packet), and it is not re-escalated — the only open question was the one Drew already answered. When the rewire is done, the placement/config record lands here and the issue closes on its acceptance criteria.

    Task 18438 completes as triaged.

  13. removed their assignment
    on Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itkind/choreRoutine maintenance, housekeeping, dependency hygienemeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)queue/queuedHas a queued queue tasksource/humanFiled directly by a humantask/triageQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions