Skip to content

C7 leaf 2: period rollup composer and generation commands #12352

Closed

Description

@dezren39

Part of #9575; implements leaf 2 from C7 design.

Depends on leaf 1 (#12349). Compose daily, weekly, monthly, quarterly, and annual reports from canonical stored records. Include templates, importance bubbling, classified activity, prior-Friday reach-back, deterministic source-time ordering, explicit period generation commands, and the worked Modal living-item example.

Acceptance: explicit period identity (never implicit date-based identity); CT calendar boundaries; idempotent reruns; daily and weekly pages generated from stored data; report counts link to members and separate implemented from cancelled/duplicate; fixtures cover late confirmation/disproof. Respect C6/C8 ownership and consume their interfaces only.

Activity

  1. added
    priority/normalOrdinary priority (the default)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    on Nov 22, 2026
  2. developing-today commented on Nov 22, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Blocked on prerequisite #12349. The design in PR #12286 orders the period rollup composer after canonical report records, and #12352 acceptance requires generating daily and weekly pages from stored data. #12349 remains open; its PR #12364 only adds CT daily period boundaries and does not supply report-record persistence/API. Resume when #12349 is complete; then implement rollup composition against that storage seam. No independent composer slice was found that would meet this task’s stored-data acceptance without inventing a parallel source.

  4. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor
    \nPicked up by repo-worker-code on lane oc-code-07. Revalidated: prerequisite #12349 is closed and its canonical report storage PR #12364 is merged. I’m checking the design/API seam and existing task work before proceeding.
  5. 10 remaining items

  6. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Resumed task 21001 and revalidated: #12352 and prerequisite #12349 are CLOSED; PR #12364 and original implementation PR #12486 are MERGED. Follow-up PR #12504 remains OPEN at 524bf3f; CodeRabbit is NEUTRAL and Proof is SKIPPED, with no review decision. Preserving the clean existing worktree/branch; no changes this pass. Resume after fresh checks/review on #12504, then address requested changes or verify merge/disposition.

  7. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    state: picked-up
    task: 21001 · lane: oc-code-02 · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Resumed the existing task and inspected its existing follow-up PR #12504; no duplicate branch or PR created. Fresh review/check disposition is still pending.

  8. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    state: parked
    task: 21001 · lane: oc-code-02 · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Parked for 20 minutes after fresh inspection: follow-up PR #12504 remains OPEN at 8006366, reviewDecision is empty, CodeRabbit is NEUTRAL, and Proof is SKIPPED. Resume by checking the PR for a new review/check/disposition, then address feedback or verify merge. Existing worktree and branch are preserved; no new PR created.

  9. added
    queue/claimedQueue worker lifecycle state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 22, 2026
  10. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    state: picked-up
    task: 21001 · lane: oc-code-01 · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Resumed task 21001 and freshly revalidated: issue #12352 is CLOSED; original implementation PR #12486 is MERGED; follow-up review-fix PR #12504 remains OPEN at 8006366 with no review decision, CodeRabbit NEUTRAL, and Proof SKIPPED. Continuing from the existing PR only; no duplicate created.

  11. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 22, 2026
  12. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    state: parked
    task: 21001 · lane: oc-code-01 · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Fresh verification found no new disposition: PR #12504 remains OPEN at 8006366, reviewDecision is empty, CodeRabbit is NEUTRAL, and Proof is SKIPPED. The original implementation PR #12486 is MERGED and issue #12352 is CLOSED. Parked for 20 minutes; resume on a new review/check/disposition, then address feedback or verify merge. Existing branch/worktree preserved; no duplicate created.

  13. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: parked
    task: 21001 · lane: any-n · worker: repo-worker-code
    origin: openchamber-scheduled-lane

    Revalidated existing work only: issue #12352 is CLOSED; original implementation PR #12486 is MERGED; follow-up PR #12504 remains OPEN at 8006366. No review decision; CodeRabbit is NEUTRAL and Proof is SKIPPED. No new source changes or duplicate PR created. Parked for 20 minutes; resume after a fresh review, check, or disposition, then address feedback or verify merge. Existing branch/worktree preserved.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-inspriority/normalOrdinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)status/parkedDeliberately paused with a recorded resume conditionwork/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions