Skip to content

C7 leaf 4: project spaces and reports timeline integration #12351

Open

Description

@dezren39

Part of #9575; implements leaf 4 from C7 design.

Depends on leaves 1–3 (#12349, #12352, #12353). Build stable landing spaces for Fleet, PM stack, Atlas, and ID with exists/wanted/in-progress/designed, inspiration/end state, open research, report/design links, and related spaces. Integrate quarter→month→week→day timeline with current quarter, overview-first expandable activity, domain weekly groupings, special reports and design milestones. Consume C6 index/mobile and C8 ingestion interfaces; do not reimplement them.

Acceptance: current-quarter timeline discoverable; missing source sections visibly unavailable; integration tests verify links and avoid ownership duplication.

Activity

  1. added
    priority/normalOrdinary priority (the default)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    on Nov 22, 2026
  2. developing-today commented on Nov 22, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: picked_up
    task: 21003
    lane: oc-code-01 (OpenChamber scheduled lane, worker repo-worker-code)
    stage: claimed → verified

    Claimed task 21003 and revalidated fresh GitHub state: #12351 is OPEN with no hard-stop labels; governing design PR #12286 is OPEN; dependencies #12349, #12352, and #12353 are OPEN. No existing PR was found by searching #12351. Initial queue checkpoint recorded with origin openchamber-scheduled-lane. Next: inspect the design, existing code, and dependency status before choosing a safe implementation slice.

  4. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 22, 2026
  5. 75 remaining items

  6. added
    queue/claimedQueue worker lifecycle state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 22, 2026
  7. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: picked_up
    task: 21003
    lane: oc-code-05 (OpenChamber scheduled lane, worker repo-worker-code)
    stage: claimed -> verified_dependencies_unavailable

    Claimed task 21003 and resumed from its preserved dependency checkpoint. Fresh GitHub state: #12351 OPEN; #12349 and #12352 CLOSED; #12353 OPEN; design PR #12286 merged; PR #12486 MERGED and closes #12352 (period rollups only). No PR found referencing #12353, so its design-pages/implementation-rollups interface is still unavailable. No implementation or worktree changes.

  8. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 22, 2026
  9. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: parked
    task: 21003
    lane: oc-code-05 (OpenChamber scheduled lane, worker repo-worker-code)
    stage: verified_dependencies_unavailable -> parked

    Parked for 30 minutes. Dependency #12353 remains OPEN and has no matching implementation PR; the required design-pages/implementation-rollups interface is unavailable. #12486 is merged but closes #12352 only. No source/worktree changes. Resume when #12353 interface is merged to main; revalidate all three dependencies and PR #12286 before implementation.

  10. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Fresh revalidation: #12351 is OPEN; design PR #12286 is MERGED; dependencies #12349 and #12352 are CLOSED, but #12353 remains OPEN and has no matching implementation PR. C7 must consume #12353’s design-pages/implementation-rollups interface, so implementing now would mean guessing or duplicating its owned work. No code or worktree changes made. Dependency-blocked on #12353; resume when its interface is available on main, then revalidate all dependencies and the design contract.

  11. added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 22, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-inspriority/normalOrdinary priority (the default)queue/blockedQueue or user escalation statestatus/blockedQueue or user escalation statework/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions