Repository navigation
Conversation
|
Important Draft PR not reviewedDraft PRs are not automatically reviewed by default.
To automatically review draft PRs, update your CodeRabbit configuration: reviews:
auto_review:
drafts: true
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
Closing this original stacked proposal as selectively incorporated or superseded by merged #56 (generic scientific core) and #57 (generic scoped MCP). Original generic-project plan is implemented and evolved in retained generic plan/ledger; issues/design evidence are verbatim and original ledger is a prefix. Independent scientific-integration plan records qualified source reconstruction, replacing this stacked plan-only PR without declaring deferred v2 complete. Independent cleanup review checked this exact head The original branch is retained. Its head is not ancestral to main, so this cleanup neither deletes its history nor merges its excluded ancestry. |
Integration disposition — 2026-10-14
Current reconciliation (2026-10-14): qualified generic content from this original stack is superseded and integrated in merged PR56 on main, without unqualified PR43 ancestry. This original draft/branch remains retained as source/evidence and for any producer-v2-specific dependent guards. It is no longer a pending generic-feature merge. Do not merge the deferred legacy stack wholesale; its original actual-data acceptance remains open.
Original source and qualification record follows:
Tuldok currently embeds Rheon-specific import contracts and cannot open a scientific repository or run its external training workflow. This plan extends the accepted Data/Pipeline/Runs roadmap with generic projects, lossless scientific fields, optional producer adapters, controlled external recipes and shared agent permissions.
The first milestone opens and inspects a project without executing its code. Later acceptance wraps the existing rheon-surrogate-lab scripts and separates real CPU/scientific qualification from historical GPU performance.
Validation: adopted plan-contract validator, local links/whitespace and independent planning review passed. Documentation only; all product gates remain pending. Stacked on PR43; no merge/deploy authorization.