Probabilistic grid-risk decision support with tail-risk analysis, calibration gates, and explicit data/model provenance.
-
Updated
Nov 5, 2026 - Python
Probabilistic grid-risk decision support with tail-risk analysis, calibration gates, and explicit data/model provenance.
Materials of WiDS Texas 2021 Hackathon
Python based data collection tool which currently supports PJM but will eventually cover everyone else....
Tiny fully-typed python client for the ERCOT Public API
Radiative surface energy balance: coatings, outdoor batteries dispatched on real ERCOT prices, and spacecraft radiators
Free, open-source Python library for US ISO/RTO energy data (CAISO, ERCOT, MISO, NYISO, ISONE, SPP, PJM) - no API key required. Alternative to gridstatus.
ERCOT plan comparison demo: simulate electricity bill costs from 15-minute usage and weather scenarios, then rank plans (MVP, extensible lakehouse roadmap).
Keeps a home-battery fleet's grid commitment when devices fail, priced on real ERCOT data. Human-approved recovery. Base Power x AITX Hackathon 2026
Open battery-storage environment for the post-RTC+B ERCOT market: real-time and day-ahead (two-settlement), exact upper bounds, reproducible baselines.
Multi-agent RAG system using LangGraph over ERCOT protocols with retrieval optimization, memory, and web fallback.
UQ metrics for wind time series and surrogate models that map them to calibrated plant-level wind power uncertainty, including at plants without measurements (framework, synthetic examples and a public-data case study)
ERCOT BESS arbitrage: LightGBM dispatch adds +$2.6M/yr (100 MW battery) over persistence on 2-year held-out test (77% of ceiling).
Unofficial checker for ERCOT EWS submissions, and a catalogue of known discrepancies in ERCOT's EWS documentation. Not affiliated with or endorsed by ERCOT.
An open grader for data centre voltage ride-through claims. ERCOT NOGRR282 and Energinet TR 3.4.3.
End-to-end analysis of 5 years of ERCOT hourly grid load data, featuring a Winter Storm Uri case study. Built in Python, SQL, and Power BI.
ERCOT's 434 GW interconnection queue analyzed in PostgreSQL/PostGIS: trigram POI geolocation, county queue pressure, cohort attrition, and the cost factor
Developmental Phase of EnergyHack2026
Solar supply forecasting model training and MLflow deployment
Home Assistant integration for GridVigil: live pressure scores, demand, and grid stress alerts for the 10 major U.S. power grids
To associate your repository with the ercot topic, visit your repo's landing page and select "manage topics."