Skip to content

docs(prl): one-day cooldown on the paused sPRL2 v1 vault; PGP-40's three-month buybacks - #38

Merged
JeanBrasse merged 1 commit into
mainfrom
docs/prl-small-precisions
Oct 5, 2026
Merged

JeanBrasse merged 1 commit into
mainfrom
docs/prl-small-precisions

Conversation

@JeanBrasse

Copy link
Copy Markdown
Contributor

What changes

Two precisions on the PRL pages: 7 files, +8 / −8. No link, heading, component or x402 page is touched.

The paused sPRL2 v1 vault unstakes in one day, without penalty

Each sentence that gives "one day, without penalty" for the sunset Polygon and Sonic deployments now adds "and the paused sPRL2 v1 vault":

  • governance/sprl and tokenomics/staking-mechanisms: the cooldown parenthesis;
  • tokenomics/epoch-concept: the timeLockDuration paragraph;
  • security/risks: the early-unstake penalty bullet, and the FAQ answer on unstaking;
  • resources/factsheets/prl: the Staking row;
  • resources/user-guides/stake-prl: the FAQ answer "Can I unstake without waiting the 28 days?".

Some sentences stay as they are:

  • the ones about sPRL1 on Polygon and Sonic alone;
  • step 1 of "Unstaking" in the staking guide, because it describes the Stake page, and the v1 vault has its own Stake Legacy page.

On-chain, read-only. eth_call on a public RPC at Ethereum block 26,127,190 (5 October 2026), sPRL2 v1 at 0xE8A2d848fE656E34A6caA35f375B42979e322135:

Read Result
paused() true
timeLockDuration() 86,400 s (one day)
startPenaltyPercentage() 0
requestWithdraw, simulated from a current holder succeeds
depositBPT, simulated reverts with EnforcedPause()
withdrawBPT, simulated from an address without a request reverts with 0x6b5d3621, not EnforcedPause()

So the pause stops deposits, but not withdrawal requests or withdrawals. That matches the source in parallel-tokenomics:

  • requestWithdraw in TimeLockPenaltyERC20.sol carries no pause modifier, and neither do withdrawBPT and withdrawPRLAndWeth in sPRL2.sol;
  • only the deposits are whenNotPaused.

PGP-40's monthly buybacks run for three months

The PGP-40 bullet on the PRL page now ends with this sentence: "PGP-40 commits $20,000 a month from the Treasury to these buybacks for three months, after which it calls for a review and an updated Phase III proposal."

The source is PGP-40, adopted in May 2026: "The DAO will allocate $20,000/month from its Treasury holdings to purchase PRL on the secondary market. [...] This commitment runs for 3 months, after which we will present a review and an updated Phase III proposal [...]".

Checks (Node 22)

  • pnpm build exits 0 (333 files), pnpm test passes 350/350 (32 files), and pnpm typecheck exits 0.
  • Links and anchors of the 7 changed pages, checked in the built site: none is broken. The markdown links of the 7 sources are the same as on main.
  • The new text appears in the built HTML, the markdown exports and llms-full.txt. "$20,000" renders as plain text, and the FAQ JSON-LD of stake-prl and risks parses.
  • The diff: the added lines are plain ASCII, and git diff --check is clean.
  • Merge: the branch merges with docs(x402): settle token, settle failure reasons and the new error codes (BAC-381) #32 without conflict.

🤖 Generated with Claude Code

…ree-month buybacks

The paused sPRL2 v1 vault on Ethereum unstakes like the sunset Polygon and
Sonic deployments: read on-chain at Ethereum block 26,127,190,
timeLockDuration() is 86,400 s and startPenaltyPercentage() is 0, and its
pause blocks deposits but not withdrawal requests. The seven sentences that
give one day, without penalty, for Polygon and Sonic now name it too.

PGP-40 commits $20,000 a month of Treasury buybacks for three months, then
calls for a review and an updated Phase III proposal. The PRL page now says so.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@vercel

vercel Bot commented Oct 5, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
docs-parallel Ready Ready Preview Oct 5, 2026 4:05pm UTC
parallel-docs Ready Ready Preview Oct 5, 2026 4:05pm UTC

Request Review

@JeanBrasse
JeanBrasse merged commit 1bc9670 into main Oct 5, 2026
3 checks passed

This branch was successfully deployed

2 active deployments
Preview – parallel-docs — aa94fd1b Deployed Oct 5, 2026 by vercel[bot]
Preview – docs-parallel — aa94fd1b Deployed Oct 5, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant