Repository navigation
ci: enable scoped claude-current delivery after checked migration - #56
Conversation
|
Sorry @brettheap, you've used your own review budget of 250,000 diff characters for the last 7 days. You can request another review in 1 day and 10 hours by commenting |
|
@codex review |
|
Paired governance: opensoft/openRepoTools-spec#39. Required-check migration completed with the live flag false; no queue/canary or lane action has been performed. |
Codex Review Summary: ❌ FailedThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
Reviewer's GuideConfigurationEnable the existing delivery policy while leaving omission dependent on effective protection and proof.
DocumentationDocument the approved scoped cutover, its migration and qualification boundaries, and the manual queue procedure.
Align shared task-set guidance with the scoped enabled phase while preserving full-CI expectations outside that scope.
Record the approval, completed required-check migration, and boundaries between activation evidence and later live qualification.
TestsAssert the enabled committed policy, full fallback under unmigrated protection, and explicit disabled no-network behavior.
Update the local-review contract assertion to the approved enabled phase without changing its read-only boundary.
Keep the legacy manual queue's full-CI expectation while reflecting the enabled scoped policy.
Tips and commandsInteracting with Sourcery
Customizing Your ExperienceAccess your dashboard to:
Getting Help
|
|
You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard. |
|



Scope and authority
Brett explicitly approved the scoped required-check migration, reviewed
enablement PR and two-PR claude-current test on 2026-11-13. No bypass, app access,
paid upgrade, release/tag, assembly-pin, installed-tool or lane change is included.
The approved context migration is complete: repository ruleset 25966308 now
requires openrepotools-delivery bound to GitHub Actions integration 15368. Full
target/effective readbacks preserved every unrelated field/rule and kept the
live flag false throughout. No bypass actor or exception was added.
Change
three default-on protection refusal cases and update historical phase asserts.
artifact/review schemas, dependency pins and release files byte-for-byte.
The changed source floor is explicit: delivery may mean fast source verification;
the named manual queue holds heavy integration. Both agents must use that queue,
never directly merge a fast-only source. Queue-only usage is accepted operator
policy, not GitHub-enforced exclusivity.
Only unchanged-mode regular claude-current/test modifications, both exact body
opt-ins and one/two independent main-based members can qualify. Other work keeps
full checks. This config PR itself must run full ordinary and reusable CI.
Validation and review
its actual main full run43397357900 passed.
coverage passed. The first broader run exposed a remaining historical phase
assertion; it and the queue counterpart are explicitly corrected, not masked.
the existing disposable image as UID1000, offline,2CPU/2GiB.
the reviewed source delta exactly. Two intentional phase-specific test identity
renames and three added cases will be accounted for in hosted inventories.
whitespace checks passed. No workflow definition changed.
found no actionable issues at code c2e2225/spec5cf876f. The master reviewed the
final documentation-only delta to d4d42f9; runtime/tests are unchanged.
Hosted review will be requested and its actual result kept distinct.
Paired governance branch ci/activate-claude-current is at
5cf876ff5c540116a3745ff895bd5925c05c5d07 in opensoft/openRepoTools-spec.
Sole tasks are feature009 T036-T041; reconciliation remains spec issue26.
Remaining acceptance
Normal merge requires exact-head ordinary/reuse CI and review. Actual post-merge
main must pass before queue use. Then the authorized two-member canary must prove
fast-only source/candidate PR CI, one complete heavy call, no duplicate full main
work and exact tested/landed prefix/final trees. No live acceptance is claimed
by this source PR or its local tests. Preserve lanes1-5 and the assembly checkout.
Summary by Sourcery
Enable the approved scoped claude-current delivery policy while retaining conservative full-CI fallback and documenting the remaining qualification gates.
New Features:
Enhancements:
Deployment:
Documentation:
Tests: