Skip to content

Predictable updates of yarn version #388

Description

@daveisfera

When the yarn version changes, it means that a new base image is generated. Can this be limited to a predictable schedule? I was thinking that update to the latest stable version of yarn when a new point release is made.

Activity

  1. razor-x commented on Apr 26, 2017

    @razor-x
    Contributor
  2. Starefossen commented on Apr 27, 2017

    @Starefossen
    Member

    Yarn will continued to be updated when Node.js version are updated. However, since Yarn is still experimental and has not reached a stable version (eg. 1.0) there may be breaking changes. Use on own risk.

  3. daveisfera commented on Apr 27, 2017

    @daveisfera
    Author

    If this is really the stance being taken, then I believe that there should be a separate tag for the builds that include yarn. Having the image change every time yarn decides to do a release breaks the concept of fixed/reproducible builds in Docker.

  4. nschonni commented on Jun 7, 2017

    @nschonni
    Member

    Think this is answered in the CONTRIBUTING.md now

    Yarn is updated to the latest version only when there is a new Node.js SemVer-minor release, and it's updated only in the branch with the new release, preferably in the same PR. The update.sh script does this automatically when invoked with a specific branch, e.g. ./update.sh 6.10.

  5. pesho commented on Jun 7, 2017

    @pesho
    Contributor

    Yes, @nschonni is right. This was resolved in #393

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions