ci: edit accuracy shards start once the CLI is built, not after all of Build - #6777
Conversation
Edit accuracy: accurate 271 (base branch 271), smooth 167 of thoseThe gate passes. Quarantined, measured but not gated (0) |
There was a problem hiding this comment.
Verdict: APPROVE · 0 blocker · 0 important · 0 nits · head 0c89941a
Scope
Read the ci.yml diff in context. The only thing that consumed the edit-accuracy-cli artifact was the shards and their retry, and both now need the new job. Dropping edit_accuracy from Build's if only skips Build on studio-only diffs, and a skipped Build reads as passing. It was only there to produce the artifact. Fail-safe holds: if the CLI build fails, the shards are skipped and ratchet.mjs gate --shards returns "0 of N shards reported results", so the required gate fails. The 4 workflow test files pass locally (9/9). Both CI runs on this head are green.
What changes
The edit accuracy shards only need
packages/cli/dist, but they waited for the wholeBuildjob, which goes on to pack every package (verify:packed-manifests) and check the CLI's lazy dependencies after the CLI already exists. A new job,Studio: edit accuracy CLI build, runs the same install andbun run buildand uploads the CLI; the shards and their retry job need it instead ofBuild.Buildkeeps every step and stays the required check. It no longer runs just because the edit accuracy filter matched, since that clause (from #5566) only existed to produce the artifact.If the new job fails, the shards are skipped and
Studio: edit accuracy gatefails because the shards did not run (#6069), so a broken CLI build still blocks the merge.Why
The shards are the merge queue's critical path:
Detect changes->Build-> the slowest of 20 shards -> the gate.Before, over the last 20 green merge-queue CI runs:
Buildtook a median 266 s, of whichverify:packed-manifeststook a median 98 s andcheck:cli-lazy-deps4 s, all after the CLI was built. In run 40985995480 the CLI build finished 114 s intoBuild; the shards started 202 s in.After
This PR's own run (40989910509, pull request, 5 shards):
Studio: edit accuracy CLI buildended 195 s into the run and the shards started at 197-198 s;Buildended at 285 s. Before this change the shards could only start afterBuild, so they now start about 87 s sooner, and the run's critical path is shorter by the same amount. Merge-queue numbers follow from the first queue runs after it lands.Checks
node --import tsx --test scripts/check-edit-accuracy-filter.test.mjs scripts/edit-accuracy-retry.test.mjs scripts/merge-queue-workflows.test.mjs scripts/ci-cache-workflows.test.mjs: 9/9 pass. The filter test now reads the new job's steps for what the bench is built from.Size
Under 100 lines on purpose: one workflow dependency change that takes 87 s off every CI run; nothing else open touches ci.yml to carry it.