Skip to content

Repair the long program path so it runs end to end #1758

Closed

Description

@bradygaster

The long program path (research → triage → plan program → plan implementation → accept → activate) likely does not work end to end. Three interlocking defects, all in workflows/squad.md. They should be fixed together — fixing any one alone leaves the path broken.

Defect 1 — accept requires an artifact the program path never produces

## skill: squad-plan-accept (~L633), Step 1 hard-requires a plan artifact. The program path produces a program artifact and has no plan at that point.

So accept fails on the very path it exists to serve.

Defect 2 — implement dispatches epics as if they were tasks

plan activate creates a three-level hierarchy:

Root
└── Epics
    └── Tasks

But /squad implement dispatches only immediate children. Running implement on the root therefore dispatches epics as worker issues rather than tasks — each worker receives a unit of work far too large to implement in one PR.

Defect 3 — validate runs too late

Current order:

research → triage → plan program → plan implementation
  → accept scope → plan validate → accept implementation → activate

plan validate must move before both accepts, so the complete package is challenged before anything is locked. Tracked jointly with the validate-teeth issue.

Also worth doing: SpecKit vocabulary alignment

The sequence doesn't map onto SpecKit's specify / plan / tasks / implement vocabulary, which is the mental model of the target audience. plan implementation is effectively the tasks step — a /squad tasks alias would ease adoption at near-zero cost.

Where the code lives

All in workflows/squad.md:

Skill Approx. line
squad-plan L603
squad-plan-accept L633
squad-plan-implementation L824
squad-plan-validate L861

⚠️ Never put a ## heading inside a ## skill: block. The block closes implicitly at the next H2 and everything up to the next skill marker is silently discarded — ~29 KB was lost this way once, and it still compiled clean. Skills use #####. Run npx vitest run test/gh-aw-quality.test.ts before pushing; it asserts zero discarded bytes.

Origin

Found by Flight during architectural review following the 2026-08-19 live end-to-end run.

Goal and Success Criteria

Added 2026-08-20 during wave:1 triage. One criterion per defect; each is independently falsifiable.

Goal: Fix all three structural defects in workflows/squad.md so that /squad plan (program path) → /squad accept → /squad activate → /squad implement on a 3-level epic produces correct task dispatch without manual correction.

SC-1 — Defect 1: accept works on program artifacts, not just plan artifacts.
squad.md's squad-plan-accept Step 1 uses a dynamic lookup that resolves both plan and program artifact types. Fails if squad.md:~L654 still contains a literal identifier that only matches the basic plan-path artifact.

SC-2 — Defect 2: Epic Dispatch dispatches tasks, not epics.
The Epic Dispatch section (~L529-554) dispatches only leaf tasks — children that have no open sub-issues of their own. Fails if the dispatch step iterates over direct children of the root without filtering out intermediate Epics (items that themselves have children).

SC-3 — Defect 3: Validate runs before both accept steps.
The squad-plan-validate section appears before both squad-plan-accept and squad-plan-implementation-accept in the workflow definition ordering. Fails if validate (~L867) still appears after accept-scope in the file.

Activity

  1. bradygaster commented on Aug 20, 2026

    @bradygaster
    CollaboratorAuthor

    Flight sequencing note — revised 2026-08-20.

    Wave: 3.

    Depends on:

    Blocks:

    Safe to run in parallel with: #1770 and #1760. Avoid parallelizing with #1759 or #1757.

    Why / evidence: this is the broadest workflows/squad.md edit: implement/epic dispatch is lines 533-575; legacy plan accept is lines 641-689; implementation planning is lines 832-867; validation/acceptance order is lines 869-960. #1759 overlaps the owner-assignment area in lines 832-863, and #1757 overlaps the validation/acceptance area in lines 869-960. #1772 is separate file work in workflows/squad-implement-worker.md lines 202-205 and 216-265, but without it a live "end to end" proof can silently stop after merge.

  2. added
    gh-awGitHub Agentic Workflows integration
    type:bugSomething broken
    triagedIssue has been triaged
    wave:1-nextWave 1 — immediate next sprint
    and removed
    bugSomething isn't working
    on Aug 20, 2026
  3. added
    squadSquad triage inbox — Lead will assign to a member
    on Aug 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    gh-awGitHub Agentic Workflows integrationpriority:p0Blocking releasesquadSquad triage inbox — Lead will assign to a membertriagedIssue has been triagedtype:bugSomething brokenwave:1-nextWave 1 — immediate next sprint

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests