You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Split plan acceptance into scope approval, implementation approval, and execution activation #1656
Acceptance records the exact validated revision and metadata without drift; retry creates no duplicate artifacts.
Actual
Positive: scope acceptance links the exact program run; implementation acceptance links the exact implementation and scope-acceptance runs.
Positive: repeated activation detected all 18 existing issues and created zero duplicates.
Defect: the implementation acceptance says XS×1, S×3, M×9, L×9 (22 total) for an 18-task plan. Validation and actual activated labels agree on XS×0, S×2, M×8, L×8 (18 total).
The locked acceptance record contains metadata that does not describe the accepted revision, undermining auditability even though the linked revisions and retry behavior are correct.
Activity
feat(gh-aw): split plan acceptance into scope/impl/activate (#1656)
bradygaster commentedon Aug 8, 2026
E2E evidence: revision links work, but accepted sizing summary drifts
Tested SHA:
47e04dc73663cba40b47f00dd8e2ac42c37f6419Consumer/root: https://github.com/bradygaster/squad-planning-e2e/issues/2
Reproduction
Run validation, accept scope, accept implementation, activate, then repeat activation.
Expected
Acceptance records the exact validated revision and metadata without drift; retry creates no duplicate artifacts.
Actual
XS×1, S×3, M×9, L×9(22 total) for an 18-task plan. Validation and actual activated labels agree onXS×0, S×2, M×8, L×8(18 total).Acceptance comment: https://github.com/bradygaster/squad-planning-e2e/issues/2#issuecomment-5224830600
Impact
The locked acceptance record contains metadata that does not describe the accepted revision, undermining auditability even though the linked revisions and retry behavior are correct.
fix(gh-aw): acceptance copies sizing from validation verbatim (#1656)
feat(gh-aw): split plan acceptance into scope/impl/activate (#1656)
fix(gh-aw): acceptance copies sizing from validation verbatim (#1656)
feat: Evolve Squad planning into executable SDLC lifecycle (github#1648…