Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 1 addition & 0 deletions ROADMAP.md
Original file line number Diff line number Diff line change
Expand Up @@ -13,6 +13,7 @@ A row here records intent. It does not settle a product question and it is not a
| The NixOS flake and infra manifests | [nixos-and-infra](planning/roadmaps/nixos-and-infra.md) | Inputs kept current by a daily job. No open work items of its own |
| Repo-wide CI and automation | [repo-and-ci](planning/roadmaps/repo-and-ci.md) | The dispatch workflows, the Go build cache, stale PR triage — and the queue fleet program: lanes for every queue, OpenChamber session dispatch (#1233, #1234), pool & routing intelligence (#1343, #1340) |
| The basement home cluster (Talos, Cozystack) | [basement-cluster](planning/roadmaps/basement-cluster.md) | Nothing built yet; research and planning done, hardware inventory and power come first |
| The PM stack (Kaneo, Pad, Grist, the aggregator, the queue fleet) | [pm-stack](planning/roadmaps/pm-stack.md) | Coherence epic #1184 in progress: one URL, fresh data, triage-able issues across the four repos |

## Now, across the repo

Expand Down
1 change: 1 addition & 0 deletions planning/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -21,6 +21,7 @@ The repo holds several projects that move on their own schedules, so each has it
| The NixOS flake and the infra manifests | [`roadmaps/nixos-and-infra.md`](roadmaps/nixos-and-infra.md) | `nixos/`, `lib/`, `infra/` |
| Repo-wide CI and automation | [`roadmaps/repo-and-ci.md`](roadmaps/repo-and-ci.md) | `.github/` |
| The basement home cluster (Talos, Cozystack) | [`roadmaps/basement-cluster.md`](roadmaps/basement-cluster.md) | `infra/talos/`, `doc/` |
| The PM stack (project management) | [`roadmaps/pm-stack.md`](roadmaps/pm-stack.md) | `pm-stack/` |

Each roadmap file groups its items by horizon.

Expand Down
30 changes: 30 additions & 0 deletions planning/roadmaps/pm-stack.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,30 @@
# Roadmap: PM stack

The PM stack is how work in this repo and its related repositories is planned, picked up, and watched: Kaneo as the execution board, Pad as the planning layer, the Grist "Program roadmap" table as a mirror of these roadmap files, the aggregator in [`pm-stack/`](../../pm-stack/) as the cross-repo read view, and the queue fleet (lanes, orchestrator, stewardship) that picks work up. Design record: [`doc/2026-10-24T11-05-38Z_design_project-management-stack/`](../../doc/2026-10-24T11-05-38Z_design_project-management-stack/). How to read this file: [planning README](../README.md).

The roadmap of record is this file and its siblings in `planning/roadmaps/`. The Grist table is a mirror of them (kept in sync by the roadmap-sync job); a Grist-only row is a seed or a mirror entry, never a second source of truth.

## Now

| Title | Status | Intent | Links |
| ----- | ------ | ------ | ----- |
| PM stack coherence: single URL, fresh data, triage-able, hierarchical | in-progress | The coherence epic for the whole stack: one place to look, data that is current, issues a worker can pick up without archaeology. | #1184 |
| This roadmap and the Grist mirror reconciliation | in-progress | The PM stack listed as a roadmap project, and the Grist-only PM rows marked as mirror rows so no roadmap statement contradicts a GitHub issue state. | #1216 |
| Minimum viable label adoption for opencode, openchamber, nix | in-progress | A shared minimum label set so cross-repo views built on labels are not blind outside this repo. Measured 2026-11-13: unlabeled open issues at 1/70 (opencode), 0/82 (openchamber), 3/51 (nix); the residual labeling is queued. | #1223 |
| Kaneo execution board anchors: GitHub App installed and connected | shipped | Phase 1 of the design: Kaneo on the laptop, the developing.today GitHub App installed on this repo and on dezren39/nix, two-way sync verified. Closed as completed. | #1007, PR #752 |
| Work-picking jobs consult the orchestrator's published priorities | dropped | Closed as not planned. Recorded here so the anchor named by #1216 is represented accurately: this is not current work, and the queue fleet as built does the picking instead. | #911 |

## Next

| Title | Status | Intent | Links |
| ----- | ------ | ------ | ----- |
| Connect opencode, openchamber, nix as Kaneo projects | planned | One Kaneo project per repo (the upstream one-repo-per-project limit), the developing.today app installed per repo. Seeded as a Grist row on 2026-10-24; tracked under the coherence epic. | #1184 |
| Projector and link registry (Turso) | planned | A webhook-fed projector joining GitHub issue, Kaneo task, Pad item, and roadmap row by ID. Never a source of truth. | #1184 |
| Aggregator UI: cross-repo WIP board and roadmap view | in-progress | Read-mostly and disposable: if it rots, every layer underneath still works standalone. The aggregator service exists and reads this repo's roadmap data today; the cross-repo board is the remaining scope. | #1184 |
| Apply external Grist doc changes live | shipped | External changes to the Grist doc apply without a full server restart. Closed as completed. | #1288 |

## Later

| Title | Status | Intent | Links |
| ----- | ------ | ------ | ----- |
| Live two-way sync between Grist and the roadmap files | idea | The 4-hourly roadmap-sync job is the interim measure; a live sync replaces it when the central-schema work lands. | #1184 |