Repository navigation
feat(program-tending): slice 3 — projects, stalled PRs, loose ends (#1352) - #11072
Conversation
Codex Review Summary: ❌ FailedThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
|
You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard. |
|
Warning Review limit reachedYou've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. Next included review available in 44 minutes. View limit details
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. |
|
Codex gate disposition (task 19501): the Codex code review on this PR failed to run — the connector posted "You have reached your Codex usage limits for code reviews" and its review summary shows status Failed at commit b4867c3. There are zero Codex reviews and zero inline Codex findings on this PR, so there is no finding to fix or reply to. Targeted tests were verified locally before opening (50 tests OK, including 18 new slice-3 contract tests). Merging under the standing merge criteria; a later Codex pass can be triggered when its limits reset. |
Program-tending slice 3 for #1352 — the final planned slice. Slices 1+2 landed in PR #4792 and PR #8377.
What lands
All sections honor the shared action cap (budget chains epics, roadmaps, projects, stalled-prs, loose-ends), dry-run by default, and live writes are isolated per item so one failure never aborts the run. The slice-1 stub functions remain for backward compatibility; the runner now reports slice 3. Workflow wording updated to match.
Tests
Refs #1352 (not closing: the packet for task 19501 requires the issue to stay open until all planned slices are complete; this PR is the last planned slice, so closure can be judged once it merges).