Repository navigation
Open
Labels
app/pm-stackpm-stack (Pad/Grist) in developing-today/codepm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-insLarge: multi-day or open-ended; expect staged check-inskind/designA design proposal (design-architect): multi-step, phased, decision-bearingA design proposal (design-architect): multi-step, phased, decision-bearingpriority/normalOrdinary priority (the default)Ordinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)Queue task is parked (waiting on CI, time, or an event)queue/queuedHas a queued queue taskHas a queued queue taskstatus/parkedDeliberately paused with a recorded resume conditionDeliberately paused with a recorded resume conditionstatus:in-reviewtask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsQueue packet kind: bounded fix with reproduction and targeted tests
Description
C3 — Health hooks: failure-triggered checks that troubleshoot and report
Component of the reporting-architecture program (starter epic #9568).
Source: Drew's directive, Reports chat, 2026-11-13 09:11 CST.
Statements: S1.3.
Scope
Checks like "PM stack reachable" and "OpenCode working" stop being
interval polls and become hook scripts that fire on failure-to-connect:
- On a failed connect (from any caller: PM stack surfaces, lane launches,
aggregator ticks), the hook fires immediately, runs a bounded
troubleshoot sequence (reachability, service state, auth/credential
health, recent changes), and reports what occurred — a note to the
queues/PM-health category chat, escalating to Reports when it is an
exception and to the main chat when Drew is blocked. - The hook records the incident into the PM-stack event store so C6 can
render an incident page and C8 can ingest it (first-appearance data for
error strings starts here). - Recovery is also an event: the same hook reports the recovery (the
watchdog's new-alert/recovery pattern, event-driven).
Boundaries / collisions
- This is the successor to the disabled opencode-session-minder's
detection role — hooks, not a revived cron (the Fleet CA coordinator's
finding stands: no durable monitor covered sessions after 2026-11-08;
this component closes that gap by trigger, not by schedule). - fleet-watchdog / fleet-minder keep their current duties until the hooks
prove out; the design names the overlap and the cutover test. - Troubleshoot actions are bounded and named in design (read-only probes
first; any state-changing remediation is a separate, gated step).
Acceptance
- Merged design: trigger surface (who calls, what counts as
failure-to-connect), probe sequence per check, report format,
escalation rules. - PM-stack-reachable and OpenCode-working hooks live, with one real
failure + recovery cycle each recorded end-to-end. - Incident records land in the event store in the shape C6/C8 consume.
Metadata
Metadata
Assignees
Labels
app/pm-stackpm-stack (Pad/Grist) in developing-today/codepm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-insLarge: multi-day or open-ended; expect staged check-inskind/designA design proposal (design-architect): multi-step, phased, decision-bearingA design proposal (design-architect): multi-step, phased, decision-bearingpriority/normalOrdinary priority (the default)Ordinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)Queue task is parked (waiting on CI, time, or an event)queue/queuedHas a queued queue taskHas a queued queue taskstatus/parkedDeliberately paused with a recorded resume conditionDeliberately paused with a recorded resume conditionstatus:in-reviewtask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsQueue packet kind: bounded fix with reproduction and targeted tests
Activity
developing-today commentedon Nov 13, 2026
CODE-3169
dezren39 commentedon Nov 17, 2026
🤖 Agent note · triaged — task 19037 (lane code-c)
412 remaining items
dezren39 commentedon Nov 22, 2026
agent-note:v1
state: parked
task: 20918
lane: oc-code-03
stage: verified -> parked-prerequisite-not-ready
Parked task 20918 for 30 minutes. Fresh state: PR #12226 remains OPEN/unmerged at 1b4e841; CodeRabbit is NEUTRAL and Proof is SKIPPED. No failure injection or cutover test is safe until Slice C merges. Resume condition: #12226 merged with required checks passing; then execute both hook failure/recovery cycles, verify C6/C8 incident shape, and maintain 14 consecutive cutover days. Keep fleet-watchdog and fleet-minder active. No worktree or code changes were made.
dezren39 commentedon Nov 22, 2026
🤖 Agent note · picked up queue task 20918 to revalidate the Slice D prerequisite for #9571. Will not run failure injection or cutover activity unless PR #12226 is merged with required checks passing; fleet-watchdog and fleet-minder remain active.
dezren39 commentedon Nov 22, 2026
🤖 Agent note · resumed task 20918 for #9571
1b4e841547d1b09f44d336f45d88594afd9af3c6; its checks are CodeRabbitNEUTRALand ProofSKIPPED.fleet-watchdogandfleet-minderremain active.dezren39 commentedon Nov 22, 2026
🤖 Agent note · parked task 20918 for prerequisite merge
1b4e841547d1b09f44d336f45d88594afd9af3c6; CodeRabbit isNEUTRALand Proof isSKIPPED.fleet-watchdogandfleet-minderremain active.dezren39 commentedon Nov 22, 2026
Task 20918 claimed, freshly verified, and parked for 20 minutes. Issue #9571 remains OPEN; prerequisite PR #12226 remains OPEN/unmerged at
1b4e841547d1b09f44d336f45d88594afd9af3c6(CodeRabbit NEUTRAL, Proof SKIPPED). No worktree, failure injection, or cutover activity. Keep fleet-watchdog and fleet-minder active. Resume after #12226 merges with required checks passing; then run both hook cycles, verify C6/C8 shape, and begin/continue 14 consecutive days of cutover evidence. Sandbox bookkeeping deferred to fleet reconciliation.dezren39 commentedon Nov 22, 2026
agent-note:v1
state: picked_up
task: 20918
worker: repo-worker-code
lane: oc-code-08
origin: openchamber-scheduled-lane
Claimed and checkpointed task 20918. Fresh verification: #9571 remains OPEN with parked lifecycle labels and no hard-stop labels. Prerequisite PR #12226 remains OPEN/unmerged at
1b4e841547d1b09f44d336f45d88594afd9af3c6; it is mergeable, but CodeRabbit is NEUTRAL and Proof SKIPPED. Slice D cannot begin before the prerequisite merges with required checks passing. No failure injection or cutover activity will run; fleet-watchdog and fleet-minder stay active.dezren39 commentedon Nov 22, 2026
agent-note:v1
state: parked
task: 20918
worker: repo-worker-code
lane: oc-code-08
origin: openchamber-scheduled-lane
Task 20918 parked for 20 minutes. PR #12226 remains OPEN/unmerged at
1b4e841547d1b09f44d336f45d88594afd9af3c6; CodeRabbit is NEUTRAL and Proof is SKIPPED, so required green checks are unavailable. Slice D must not run before Slice C merges. No failure injection, cutover activity, worktree, or source changes. Fleet-watchdog and fleet-minder remain active.Resume after #12226 merges with required checks passing; then revalidate and run both hook failure/recovery cycles, verify C6/C8 incident shape, and begin/continue the 14-day evidence window.
dezren39 commentedon Nov 22, 2026
Picked up by
felix— working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live whilefelixposts progress markers; after 30 minutes of silence any other worker may pick this up.)dezren39 commentedon Nov 22, 2026
Progress from
felix: still workingdezren39 commentedon Nov 22, 2026
Progress from
felix: still workingdezren39 commentedon Nov 22, 2026
Progress from
felix: still workingdezren39 commentedon Nov 22, 2026
agent-note:v1
event: slice-d-validation-landed
by: agent felix (kind muse, Muse sandbox seat; queue task 20918, worker felix)
at: 2026-11-22
Slice D moved from "parked on Slice C" to validated-at-the-hook-level. PR #12600 carries the full record (doc/2026-11-22T14-55-23Z_c3-health-hooks_slice-d-validation/, with drill harness + raw evidence). Summary:
Real failure + recovery cycles — done for both hooks (shipped runner on main 9794191, sandbox, disposable stand-ins; no production service touched):
C6/C8 shape verification — done, one real gap found. Hook-local JSONL record conforms to the design contract. PR #12226's AuditEvent mapping conforms to the design's append section (its tests run against the real EventsStore: 3 pass). BUT the full incident record never reaches the events stream: the throat POST is a reduced body and the stream's closed StreamEvent shape cannot carry evidence — C6 cannot pair recovery with down from the stream, and C8's first-appearance error strings never arrive. Filed as #12599 (design decision needed), triage packet enqueued same pass (task 21050), three minor diffs included. Acceptance bullet 3 is therefore only partially satisfiable until #12599 is decided; bullet 2 stays open until a production cycle lands in the production stream.
Cutover — honestly not started (day 0 of 14). Read-only laptop checks: sentinel/aggregator/opencode active, all services up, hookDispatchedStates unset, no health-hook-incidents.jsonl on the laptop, zero health-hook-incident events — no hook has ever fired in production. The drill cycles validate the hooks but do not count toward the cutover (condition 3 requires cycles in the production events stream). Day 0 = first full day after PR #12226 merges AND the laptop runs the merged code with hooks firing from production callers. Nothing retired; fleet-watchdog/fleet-minder keep all duties.
Remaining, in order: merge #12226 -> production failure/recovery cycle per hook in the production stream -> #12599 decision -> start the 14-day clock. Claim released free.
dezren39 commentedon Nov 22, 2026
Released by
felix(outcome: free). Slice D hook-level validation landed in PR #12600: real failure/recovery cycles for both hooks, C6/C8 shape verified (gap filed as #12599, task 21050). Production cycles await PR #12226 merge; 14-day cutover not started (day 0 defined on the issue).dezren39 commentedon Nov 22, 2026
agent-note:v1
event: merged
by: agent felix (kind muse, Muse sandbox seat; queue task 20918, worker felix)
at: 2026-11-22
The Slice D validation record is merged: #12600
(doc/2026-11-22T14-55-23Z_c3-health-hooks_slice-d-validation/ — record, drill harness, and raw evidence.)
What it establishes: both hooks ran a real failure-plus-recovery cycle end-to-end through the shipped runner against disposable stand-ins — pm-stack-reachable through down (same incidentId reused across the open outage) to a delivered recovery with correct lineage, opencode-working from a genuine down on the production port to up; steady state produces no record in both. Runner suite on main: 22 passed. Felix spot-checked the committed evidence before merge: no credential values in any artifact (the captures record authorization presence only).
C6/C8 verdict: the hook-local record and PR #12226's AuditEvent mapping conform to the design; the one real gap — the full incident record never reaches the events stream, so C6 cannot pair a recovery with its down event from the stream — is filed as #12599 with its triage packet (task 21050) enqueued.
Cutover: day 0 of 14, honestly. No hook has ever fired in production (read-only laptop checks: no incident JSONL, zero health-hook-incident events in the stream), and drill cycles do not count toward condition 3. Day 0 is defined in the record: the first full day after #12226 merges and the laptop runs the merged code with hooks firing from production callers. Remaining Slice D chain: merge #12226 -> one production cycle per hook in the stream -> #12599 decision -> start the clock. Nothing retired.
dezren39 commentedon Nov 22, 2026
agent-note:v1
event: decision — #12599 decided; acceptance bullet 3 unblocked in its amended form
by: agent felix (kind muse, Muse sandbox seat; queue task 21050)
at: 2026-11-22
The #12599 design decision is recorded: #12599 (comment)
Decision (option b, specified): the events stream stays the thin audit index exactly as the C3 design's append section specifies (PR #12226's projection is the whole stream contract); the alerts ledger becomes the incident record of detail — the throat POST gains a validated
healthHookextension carrying the full incident record, stored in the ledger against the incident; C6 reads detail from the alerts read surface; C8 reaches the evidence through C6's incident pages/blobs. The C3 design note is amended to state the two-store contract.Effect on this issue: acceptance bullet 3 ("incident records land in the event store in the shape C6/C8 consume") is satisfiable as amended — the audit projection lands in the stream (via #12226), the incident record itself lands in the ledger (via the implementation issues below). The three Slice D minor diffs are dispositioned in the same decision.
Implementation, filed and enqueued in the same pass:
healthHookintake extension, ledger storage, read projection, design-note amendment (queue task 21051; gated on PR C3 health hooks: wire opencode-working into lane launchers and aggregator ticks (#9571) #12226 merging).stackHealthmember), recovery titlerecovered(queue task 21052; lands after C3 aggregator: throat healthHook extension — store the full incident record in the alerts ledger + read projection (#12599 decision b) #12602).Remaining on Slice D is unchanged otherwise: merge #12226 → production cycles in the stream → these two issues → the 14-day cutover clock can start per the day-0 definition in the Slice D record.