Skip to content

design(pm-orchestration): Versioned canonical work read model and provenance #9468

Open

Description

@dezren39

MOB-01 — Versioned canonical work read model and provenance

Issue title: design(pm-orchestration): Versioned canonical work read model and provenance
Design parent: #9201 · Scope: #9201 PM projection/mobile · Version: V3 proposal; not an authorization to implement. Requirement IDs (ALLOCATED): C-R080, H-R011, O-R017. Slice status: curated implementation/research slice. Pinned baseline: a038f084dbeb525494d7bb928ad91f597db2ac51.

This batch creates design/research/validation handoff issues only. After PR #9225 is merged and this slice's granular prerequisites are resolved, a separately scoped implementation issue may be filed; production adoption, migration, deployment, and live acceptance remain separately authorized stages. The local FDR decisions are accepted design defaults; global #9180 registration is pending and is not a blocker to this bounded design work.

Goal and deliverable

project per-fact authority/revision/freshness and queue/Project/GitHub/session state without a new DB. -

Curated requirement trace

  • C-R080 — design-only (requirement); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences C-108; citations: 02_charter_v1_1.md#C-108:76; design: components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Mobile-first interactive operations; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited
  • H-R011 — design-only (requirement); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences H-138; citations: 01_handoff_pm_stack_fleet_orchestration.md#H-138:103; design: components/9199-distributed-priority.md#independent-dimensions, components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Account for project/epic lifecycle and strategic urgency with manual intervention and owner escalation, not arithmetic sorting alone.; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited
  • O-R017 — design-only (candidate); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences O-688, O-689, O-690, O-691, O-692, O-693, O-694, O-695, O-696, O-697, O-698; citations: 04_recovered_original_combined_design.md#O-688:13, 04_recovered_original_combined_design.md#O-689:13, 04_recovered_original_combined_design.md#O-690:13, 04_recovered_original_combined_design.md#O-691:13, 04_recovered_original_combined_design.md#O-692:13, 04_recovered_original_combined_design.md#O-693:13, 04_recovered_original_combined_design.md#O-694:13, 04_recovered_original_combined_design.md#O-695:13, 04_recovered_original_combined_design.md#O-696:13, 04_recovered_original_combined_design.md#O-697:13, 04_recovered_original_combined_design.md#O-698:13; design: components/9199-distributed-priority.md#candidate-order-and-rank-semantics, components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Let project/epic phase, deadlines and dependencies influence effective order selectively; prioritize critical path/unblockers, avoid escalating unrelated children, and expose project plus item urgency.; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited

Deliver this bounded slice only. It enables downstream work only after its stated contracts and prerequisites are accepted; it does not imply that other component specs, closed parent issues, source code, tests, deployments, or runtime behavior are complete.

Owned files and boundaries

  • pm-stack/aggregator/src/model.ts
  • pm-stack/aggregator/src/work-projection.ts
  • pm-stack/aggregator/test/work-projection.test.ts

Explicit read-only consumers (not writable ownership): none declared.

Use the existing Fleet queue/PM Stack/adapter owners named in the design; do not add a queue, database, scheduler, service, resolver, executable, GitHub client, or general creation-outbox producer. Shared CLI glue remains owned by the single CLI-13 registration slice. Do not edit #6533 or duplicate its live acceptance; consume #9028/#9073–#9076/#9079/#9081/#9178/#9179/#3424/#8575/#8579 as applicable, not as replacement work.

Prerequisites and sequencing

Hard blockers named by the source slice, after granular-key normalization: #9070, #9062, #9073, #9076
File-collision sequencing edges added by stable topological serialization: none.
Existing issue references retained as non-blocking runtime/evidence gates: none.
Domain-starter parent references are never emitted as hard native blockers. Source parents normalized to granular slices or runtime gates: none.

Use only granular issue-key edges after all keys are resolved. Never make a whole domain starter a hard blocker when it creates a cycle. File collisions are hard sequencing edges. Parent integration adds native parent/blocker edges in a later pass after the command map, requirements IDs, and acyclic graph are verified.

Starting failing test, oracle, and done check

  • First failing test: Done
  • Oracle: deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1 fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command: cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.json declares test: bun test). -
  • Done command: deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command:cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.jsondeclarestest: bun test). -
  • Tests must first be listed by exact name in the owning target (-- --list); assert the test exists before execution. A zero-test filter passing is not acceptance.

Acceptance and negative cases

deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1 fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command: cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.json declares test: bun test). -

Negative coverage: stale input, duplicate/replay, ambiguous resource, unauthorized actor, partial remote effect, unknown version, and no false verified/completed result where applicable.

Compatibility, migration, and runtime gates

Source trail

  • Raw source refs: handoff sources/01_handoff_pm_stack_fleet_orchestration.md; charter sources/02_charter_v1_1.md; recovered original sources/04_recovered_original_combined_design.md; cited source section(s) in sources/03_full_orchestration_proposal.md as named by the component; exact occurrence citations are in the curated trace above when allocated.
  • Design ref: components/9201-pm-projection-mobile-control.md, slice MOB-01 (proposal only).
  • Prior-art/evidence receipts: research/track-a-state-of-art.md, research/track-b-state-of-art.md, research/track-b-sources.json; additional exact evidence anchors for this slice: see the pinned census and component evidence links above.
  • Parent-approved support mapping (validation/expansion support only, not a direct slice-key match): none.
  • Existing external requirement refs not assigned a new curated ID: none.
  • Command allocation: none; this is not a command-owning slice. Full command inventory remains census/commands.jsonl; exact allocation source is census/command-slice-map.jsonl (215 rows, no wildcard). V1 baseline keys are not refiled as duplicate implementation issues.
  • Shared architecture: architecture.md; FDR index: decisions/README.md (all FDR-PMO records remain proposed, not ratified).

Original slice text (preserved)

MOB-01 — Versioned canonical work read model and provenance

Activity

  1. added
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    app/fleetpkgs/fleet multicall binary + platform crates
    on Nov 13, 2026
  2. developing-today commented on Nov 13, 2026

    @developing-today
    Contributor
  3. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    source/queue-workerFiled or worked by the queue/worker pilot
    on Nov 13, 2026
  4. dezren39 commented on Nov 13, 2026

    @dezren39
    MemberAuthor

    Triage (task 15932, lane any-d, 2026-11-13): MOB-01 is a well-formed design-stage slice; implementation is correctly gated and not yet authorized. Routed to a gated implementation follow-on (task 15993).

    Fresh verification:

    Labels decided: priority/normal, effort/m, kind/design stands (already present).

    Routing: implementation follow-on enqueued as queue task 15993 (dedupe repo-health:v1:fix:developing-today/code:issue:9468) with the gates as its first instruction — on claim, if PR #9225 is unmerged or #9201 is still open, dep-block on the unmet set instead of starting; the soft edges are read contracts to consume, not extra gates. Acceptance: the named red test exists and bun test test/work-projection.test.ts passes in pm-stack/aggregator, with output equal to the golden pm-work-view/v1 fixtures.

  5. 25 remaining items

  6. dezren39 commented on Nov 14, 2026

    @dezren39
    MemberAuthor

    Released to the queue under Drew's 2026-11-13 unblock-all order (main chat, 23:53 CT). Task(s) 15993 moved from blocked/parked to queued in the fleet unblock-all pass (worker main-unblock-all-2026-11-13). Dependency gates still recorded on a task remain recorded — the dependency checker will re-block it if a gate is genuinely unmet.

  7. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Agent note — duplicate triage; dependency gate still holds (lane any-m, task 18983)

    State: blocked (dependency)

    Fresh verification (2026-11-17):

    This bulk-intake triage task (task 18983) is therefore dep-blocked on #9201 — the broker releases it automatically when #9201 closes. No duplicate follow-on is enqueued; the gated structure from task 15993 stands.

  8. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Agent note — blocked on unlanded dependencies (lane any-j, task 15993)

    State: blocked — the implementation packet was claimed and scoped, but its input contracts do not exist yet, and the slice's own text forbids inventing them.

    Fresh evidence (checked 2026-11-17):

    Block condition: #9073, #9074, #9075, #9076 closed (the consumed contracts landed) and the #9070/#9062 read contract available in the aggregator sources. On unblock: start from the named red test + golden fixture exactly as the slice specifies (cd pm-stack/aggregator && bun test test/work-projection.test.ts).

    Queue: task 15993 (lane any-j) — blocked on the six issues above.

  9. removed their assignment
    on Nov 20, 2026
  10. dezren39 commented on Nov 20, 2026

    @dezren39
    MemberAuthor

    Agent note — picked up task 18983 (lane oc-code-06, openchamber-scheduled-lane).

    Fresh check: issue #9468 is OPEN, no hard-stop labels. Existing triage of record is task 15993; its follow-on is already structurally gated on #9201. Rechecking the gate now; no duplicate follow-on will be created.

  11. dezren39 commented on Nov 20, 2026

    @dezren39
    MemberAuthor

    Agent note — blocked on dependency, task 18983 (lane oc-code-06).

    Fresh verification at 2026-11-20: #9468 is OPEN; prerequisite issue #9201 remains OPEN; PR #9225 is MERGED. Per the MOB-01 gate, no implementation or duplicate follow-on was started. Task 18983 is blocked on #9201; existing implementation follow-on task 15993 remains the triage of record. Resume/recheck when #9201 closes.

  12. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Agent note — triage re-verified; gate narrowed but still unmet (lane FR / archer, task 18983)

    Fresh verification (gh REST, 2026-11-23 ~05:35Z):

    Verdict: MOB-01 remains correctly gated. Two of its four hard blockers have closed since the last triage (2026-11-20), but #9073 and #9076 are still open and the slice's own runtime gate forbids implementation until its granular prerequisite edges resolve — the read model consumes the Metadata/ingestion contracts those two issues own, and inventing them here is explicitly out of scope. No duplicate follow-on created: implementation follow-on task 15993 remains the packet of record.

    Next concrete slice: when #9073 and #9076 close, task 15993's implementation packet unblocks as written — start from the named red test work_projection_preserves_source_state_under_conflicting_facets in pm-stack/aggregator/test/work-projection.test.ts, oracle cd pm-stack/aggregator && bun test test/work-projection.test.ts. Task 18983 is being blocked on #9073/#9076/#9201 so the dependency checker re-serves it when the gate clears.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/fleetpkgs/fleet multicall binary + platform cratesapp/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workkind/designA design proposal (design-architect): multi-step, phased, decision-bearingpriority/normalOrdinary priority (the default)queue/blockedQueue or user escalation statesource/queue-workerFiled or worked by the queue/worker pilotstatus/blockedQueue or user escalation state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions