Skip to content

id: Phase 13 F13.6 native client shells on the shell contract #788

Closed

Description

@dezren39

What and why

A reference native client shell (Bevy or Qt) implementing the shell contract for what a terminal cannot do (3D, audio, native widgets), plus a decision record on the long-term interface (the WIT/component-model decision from F12.8).

Source

Current status

Not started. Only the web (pkgs/id/web/src/world.ts) and SSH presenters exist; no native client code in the repo.

Acceptance criteria

  • The native shell renders the same world and emits the same input events as the terminal shell, with no host change
  • It passes the F13.1 conformance check
  • A decision record documents which native framework is the reference and whether WIT changes the contract

Size

XL

Prerequisites

Activity

  1. developing-today commented on Oct 24, 2026

    @developing-today
    Contributor
  2. added
    kind/featureNew feature or capability request
    priority/lowNice to have; do when convenient
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    source/humanFiled directly by a human
    on Oct 26, 2026
  3. dezren39 commented on Oct 26, 2026

    @dezren39
    MemberAuthor

    Intake review

    Fleet monitor intake pass (protocol §5).

    Related: Phase 13 sibling set — #785 (F13.3), #786 (F13.4), #787 (F13.5), #788 (F13.6), #789 (F13.7), #790 (F13.8); this issue is F13.6 native client shells on the shell contract. It is a forward roadmap/spec item, not a reported fixed bug; nothing in the issue or its comments indicates it has been implemented.

    Notes / risks: acceptance criteria were already present in the body; none appended. Phase-13 items are large, interdependent platform work (effort/l, priority/low as roadmap items): the set should be sequenced deliberately rather than picked up piecemeal by a worker, and earlier-phase dependencies should be confirmed before implementation starts.

    Suggested approach: keep in the Phase 13 backlog until its phase dependencies land; when scheduled, split into a design pass plus implementation slices rather than a single change.

    Labels normalized by the monitor.

  4. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed on Oct 28, 2026
  5. 351 remaining items

  6. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    agent-note:v1 — task 18043 (triage, lane code-d) — state: triaged

    Triage verdict for issue #788: the unconditional F13.6 work is DONE; the only remainder is design steps 3–4, which exist only if Drew answers the design's Q1 "include". That decision is now ledger-delivered (below) instead of being re-noted shift after shift.

    Fresh evidence this shift (2026-11-17T01:10Z):

    Classification (unchanged, already on the issue): task/small-fix packet history, priority/high, effort/l, kind/feature.
    Remainder: steps 3–4 (portable rich-presentation contract + Bevy rich-surface renderers) are conditional on Q1 in doc/2026-11-01_design_id788.md §8: A) defer rich surfaces (design recommendation), B) include an additive host-validated 3D/audio/widget schema in this issue. No fleet work can start on steps 3–4 until that scope call is made, and no implementation packet is enqueued for them.
    Escalation delivered: pending-questions ledger item f136-rich-surfaces-q1-788 (pending) carries Q1 with options A (defer + close #788 as complete on steps 1–2+5, recommended), B (include steps 3–4 now), C (defer, keep #788 open as tracking home).

    Task 18043 completes as triaged. Issue #788 stays open pending Q1.

  7. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Picked up to revalidate the bulk-intake task. I found a fresh triage note from task 18043 (2026-11-17T01:12Z): implementation steps 1–2 and packaging/docs are complete; only conditional steps 3–4 remain pending Drew’s Q1 decision, so no implementation follow-on is appropriate.

  8. removed their assignment
    on Nov 20, 2026
  9. added
    nextOrg Project gate: queued next — orchestrator adds to the board
    on Nov 21, 2026
  10. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Scoping note — no next slice landable until Q1 is answered (revalidated 2026-11-22)

    Agent: xaltha (fleet seat), hourly loop 2026-11-22 ~11:00 CST · State: no code written, no PR opened — this issue's unconditional work is already satisfied on main, and the only remainder is owner-decision-gated.

    Fresh verification at main HEAD 9794191ad:

    What remains — blocked on an owner decision, not on code:

    Next step: once Drew answers Q1, the next slice follows directly — A means close #788 as complete; B means steps 3–4 become the next reviewable PRs (contract first, then renderers). Until then there is no slice to land, so this seat is standing down on #788 rather than forcing a PR.

  11. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Lane AA (archer) picking up #788's decision-record slice: which native framework (Bevy vs Qt) is the reference for F13.6, and whether WIT changes the shell contract. The shell implementation itself is a later slice; this PR lands the decision record only.

  12. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Q1 decided + #788 closed as complete (2026-11-22)

    Correction to my pickup note above: it repeated the issue body's stale "not started" premise. Fresh verification (xaltha's scoping note of 2026-11-22, re-checked here against the PR records) shows all three acceptance criteria are already met on main. The only remainder was design Q1, which was parked as an owner decision. Under FDR-0013 (accepted, Drew ruling 2026-11-21 — agents decide and record; only a hands item may wait on a person), that gate does not stand, so Q1 is decided here.

    Q1 decision — option A (the design's recorded recommendation): contract-parity is F13.6's scope; rich surfaces are a follow-on. The first Bevy shell renders view.data and the validated Screen surface and proves equivalent input/session behavior. The 3D/audio/widget payloads need an additive, host-validated presentation schema — a host/contract change that #788's own "no host change" criterion excludes from this issue. That work is filed as #12657 (design steps 3–4) and enqueued in the same pass (queue task 21074, repo-health-code-pilot). Q2 is already resolved: #840 is closed (input carries no session identity), so it never gated F13.6.

    Acceptance criteria — evidence map:

    1. Native shell renders the same world and emits the same input events as the terminal shell, no host change — pkgs/id/crates/id-native-shell on main: step 1 crate (PR feat(id): id-native-shell crate — F13.6 native reference shell, step 1 (#5542) #5573, merge 857e3413da), step-2 Screen renderer + native event mapping with terminal parity (PR feat(id-native-shell): step-2 Screen renderer, native event mapping, parity tests (#788) #10526, merge b17c6583dc), live WorldClient session loop (PR feat(id-native-shell): live WorldClient session loop feeding PresentedView (#788) #10536, merge f41728642f).
    2. Passes the F13.1 conformance check — the step-2 parity work runs the shell's transcripts through the F13.1 checker (id world contract --check); F13.1 itself is id: Phase 13 F13.1 versioned shell contract (client-server frame spec + conformance check) #783, closed.
    3. Decision record documents the reference framework and whether WIT changes the contract — doc/2026-11-01_design_id788.md, merged via design PR design(id): #788 Bevy native shell boundary #3893 (merge a7a2e927a1): Bevy is the reference framework; WIT does not change the shell contract (WIT/component model is the guest-ABI layer, F12.8/id: F12.8 guest SDKs — Rust + Zig/AssemblyScript, component-model decision #1065, now closed; a shell never sees the guest ABI). The implementation followed the record: Bevy in a separate workspace crate outside default-members, no Bevy in the default id build.

    Gates re-checked: F12.7/#1064 closed; F12.8/#1065 closed; #840 closed. Step 5 (packaging/docs) is live in pkgs/id/crates/id-native-shell/README.md.

    Closing as completed. The rich-presentation remainder continues as #12657 — nothing is dropped, it is relocated with its design intact (design §7 steps 3–4, §6 conditional criteria).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insenhancementNew feature or requestepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudnextOrg Project gate: queued next — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted tests

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions