Skip to content

id: spill v2 phase 1 — pool roster, reader-then-holder eligibility, automatic lease failover (#5787) #7572

Open

Description

@dezren39

Summary

Implement spill v2 phase 1 from the #5787 design (doc/2026-11-08_design_id5787.md, §1–§2): the spill pool and automatic holder failover for the #2819 lease protocol.

Scope

  • Grantor-side pool roster and per-grant eligibility (authenticated, reachable, caught up within the bound).
  • Reader-then-holder join: a node becomes grant-eligible only after serving as a read replica within the catch-up bound across the design's observation window.
  • Deterministic selection policy (caught-up first, healthy/least-loaded, stickiness, identity tie-break) and minimum-tenure flap protection.
  • Automatic failover sequence: fence (expiry or journaled revoke) → select → grant at epoch+1 → replay barrier → resume; DO self-grant when no successor is eligible.
  • holder-lost retryable result for commands in flight during failover; command-level dedupe posture unchanged from v1.
  • Owns the id: design: spill v2 — native spill pools, lease failover and multi-holder fencing (extends #2819) #5787 Q2 evidence duty: measure failover detection/grant/replay times (extending the id: lease protocol phase 3 — spill handoff both ways + failure-walkthrough tests (#2819) #3805 failure walkthroughs) before any proposal to change the 30s/10s term/renewal defaults.

Trigger / gating

Do not start until trigger T1 fires: v1 phases #3804 and #3805 have landed (journaled lease entries, epoch fencing, both handoffs proven). Design: #5787. Depends on: #3805.

Acceptance

  • Failover oracle cases from the design §7 pass deterministically (holder death with/without eligible successor, reconnect of a fenced holder, failover vs handback race, grant storm).
  • No grant is ever issued before the predecessor epoch is fenced; epochs stay a single per-world monotonic chain.
  • Failover measurements recorded on this issue (the Q2 deciding evidence).

Activity

  1. added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    on Nov 8, 2026
  2. developing-today commented on Nov 8, 2026

    @developing-today
    Contributor
  3. added
    priority/lowNice to have; do when convenient
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Nov 8, 2026
  4. dezren39 commented on Nov 8, 2026

    @dezren39
    MemberAuthor

    Intake review

    — fleet monitor intake (repo-fleet-monitor), 2026-11-08

  5. added
    task/triageQueue packet kind: verify, reproduce, and route this item
    on Nov 8, 2026
  6. developing-today commented on Nov 8, 2026

    @developing-today
    Contributor

    🤖 Agent note · triaged — real, gated on trigger T1 (unmet); parked

  7. dezren39 commented on Nov 9, 2026

    @dezren39
    MemberAuthor
  8. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed on Nov 9, 2026
  9. 51 remaining items

  10. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    on Nov 16, 2026
  11. dezren39 commented on Nov 16, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · parked

  12. dezren39 commented on Nov 16, 2026

    @dezren39
    MemberAuthor

    Agent note - blocked (dependency): trigger T1 still unfired; gated on issue #3805 (task 14278, lane any-c, 2026-11-16)

  13. removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 16, 2026
  14. dezren39 commented on Nov 18, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    task: 14278 (triage, openchamber-scheduled-lane, lane any-n, worker repo-worker-code)
    transition: blocked/parked -> triaged
    verdict: REAL, current, and the gate is now CLEARED. Trigger T1 fired.
    gate evidence:

  15. added
    status/triagedTriaged and routed (see agent note)
    and removed
    status/blockedQueue or user escalation state
    queue/claimedQueue worker lifecycle state
    queue/blockedQueue or user escalation state
    work/assignedQueue worker lifecycle state
    on Nov 18, 2026
  16. removed their assignment
    on Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/enhancementmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/lowNice to have; do when convenientstatus/triagedTriaged and routed (see agent note)task/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions