Repository navigation
Description
What this is
Investigation (Drew, 2026-11-06): design and later configure Drew's 3 new routers (each: 10GbE + 2× SFP+ + 3× 1GbE — exact models TBD from inventory) as the home/lab edge, replacing the current TP-Link Deco BE11000 edge (see #1280). Drew: "later we'll need to investigate hooking up my new routers — I need your help [with] the best way to configure" them. Design first; no hardware moves yet.
Current state (context)
- Edge today: Brightspeed fiber → ONT/bridge → Deco BE11000 in router mode (holds the public WAN directly; Home network: IPv6 uplink stalls on payload transfers (PMTUD/router/ISP) #1280 — it advertises an IPv6 default route with no WAN6 path, the current blackhole).
- History correction from Drew (2026-11-06): the pre-Deco router was his APU2, which he ripped out "because deco was even more broken before" — i.e. the current Deco-as-router setup was itself the fallback. (Records previously said pfSense → OpenWrt → TP-Link; the APU2 detail is Drew's, 2026-11-06.)
The concept (Drew's design, in his words as dictated 2026-11-06)
WAN-on-a-VLAN over a bonded SFP+ pair, per router:
- The ISP's single Ethernet handoff lands on a switch VLAN instead of a router port.
- Both of a router's SFP+ ports bond (2× 10G) into the switch; WAN and LAN ride as VLANs over that bond, so neither SFP+ is consumed by a dedicated Internet port.
- Wire both routers identically; run VRRP so the gateway fails over between them — the SPOF shifts from the router to the switch (accepted trade, to be examined).
- The primary reason is NOT VRRP — it is not wasting one of the two SFP+ ports on the Internet link. Failover is the bonus.
- Bandwidth math: the 2× SFP+ bond gives 10G per connection, 20G aggregate; reserving ~2G for ISP traffic and ~2G for WAN traffic on the inside leaves ~16G effective for other routes and networks. If the ISP ever delivers 10G, at 100% ISP utilization the bond is effectively dedicated to ISP work.
- Later WANs to fold in: a hotspot and maybe Starlink (multi-WAN failover/policy order TBD).
Pointer owed
Drew documented this concept somewhere on a website he rendered as "mono.si" (dictation, 2026-11-06). Fleet hunt on 2026-11-06 found no copy in memory, the zettel clone, hardware-doc, or hatch-personal. Exact site/URL TBD — when located, link it here and reconcile this issue's description against it.
Investigation questions
- Router models/firmware: VRRP + LACP + VLAN trunking support; routing/NAT hardware offload at 10G; can both SFP+ ports bond while carrying WAN+LAN VLANs at line rate?
- Switch side: LACP + VLAN requirements; is the current/planned switch (see ops(lab): rack Dell switch 1 — rails, firmware, initial config, config stored, labels #6073–ops(lab): rack Dell switch 3 — rails, firmware, initial config, config stored, labels #6075, ops(lab): cluster interconnect — connect the dozen cluster machines + 2–3 mini PCs #6077) up to it; does removing the new switch SPOF need MLAG/stacking or a second switch later?
- WAN sharing: can two VRRP routers share the single Brightspeed handoff (DHCP? PPPoE?) and one public IP cleanly?
- IPv6: does this edge fix the Home network: IPv6 uplink stalls on payload transfers (PMTUD/router/ISP) #1280 WAN6/prefix-delegation hole natively?
- Deco's afterlife: AP-only mesh behind the new edge, or retired?
- Third router's role: cold spare, lab segment, or third VRRP node?
- Multi-WAN policy for hotspot/Starlink when they arrive.
Related: #1280 (current LAN/IPv6), #6077 (lab interconnect), #6066 (home-lab parent).
Acceptance criteria
- The router models are identified from inventory and recorded on this issue (the design depends on exact port/NIC reality).
- A written edge design exists covering: WAN-on-a-VLAN over the bonded SFP+ pair, identical wiring for both routers, VRRP failover, and how the current Deco edge (issue Home network: IPv6 uplink stalls on payload transfers (PMTUD/router/ISP) #1280) is retired or demoted.
- The design names the open decisions for Drew explicitly, each with options and a recommendation, rather than burying them in prose.
Activity
developing-today commentedon Nov 7, 2026
CODE-2052
dezren39 commentedon Nov 7, 2026
Edge Architecture & Router Platform Investigation (#6649)
Comprehensive desk research for investigation questions 1–3 has been completed. The full research artifact with vendor citations, architectural proofs, and benchmark analyses is available in the fleet workspace burn folder:
📄
/home/user/gemini-burn-2026-11-06/ROUTER-RESEARCH.mdTop Findings & Critical Architectural Insight
1. Hardware Identification
The 3 new routers in inventory (
doc/inventory/routing-and-switching.md) are the Mono Gateway Development Kits by Tomaž Zaman /mono.si(NXP Layerscape LS1046A quad-core Cortex-A72 @ 1.6 GHz, 8 GB ECC DDR4, 2× 10G SFP+, 3× 1GbE RJ45, DPAA/FMan hardware offload). The primary ONT is the Calix GP1101X (10G XGS-PON).2. The LACP Hardware Offload Trap (Q1)
Drew's design proposed bonding both SFP+ ports (2× 10G LACP) to avoid wasting an SFP+ cage on an Internet link. However, deep analysis of NXP DPAA and the official
we-are-mono/ASKcodebase (docs/flowtable/vlan.md) reveals a fatal bottleneck:bond(andMACVLAN) devices are explicitly declined by the ASK flowtable walk.eth3.100,eth3.10) achieve 17+ Gbps line-rate hardware offload (<2% CPU), placing VLANs over an LACP bond (bond0.100) forces all traffic into the Linux CPU software path.3. Platform Capability Summary (Q1)
N/Aon the switch chip due to Marvell Prestera MAC table constraints; CCR2004 has no switch chip (CPU FastPath only).4. Switch Side & SPOF Elimination (Q2)
5. Sharing One ISP Handoff with VRRP (Q3)
00:00:5E:00:01:VRID(or cloned MAC). Router 2 keeps its DHCP client disabled until promoted. On failover, Router 2 sends a GARP with the VMAC; the ISP BNG sees the same MAC and retains the lease without dropping the public IP.conntrackdbetween nodes; otherwise, existing TCP sessions are dropped on failover even if the IP remains unchanged.6. Multi-WAN Topology (Hotspot & Starlink)
Plugging Starlink or the hotspot into Router 1 directly would cause them to die when Router 1 fails. All WANs must land on the switch:
Both routers trunk all three WAN VLANs and use OpenWrt
mwan3with VRRP tracking.Key Recommendations for Drew
eth3) into the switch. SFP+ is full duplex (10G TX + 10G RX), and native 802.1Q subinterfaces on physical ports are fully offloaded by DPAA at 10G line rate.eth4) as a Dedicated Inter-Router Sync Link: Connect Port 5 of Router 1 directly to Port 5 of Router 2 with a 10G DAC cable for real-timeconntrackdsession replication, VRRP heartbeat (preventing split-brain), and cluster state.owut) updates and a pre-flashed cold spare.OPEN QUESTIONS
dezren39 commentedon Nov 7, 2026
Intake review
Related: linked from the issue body and title where applicable; see notes. No merged PR was found that explicitly resolves this issue (checked the 300 most recent merged PRs for a fixes/closes/resolves reference) — it is still live.
Notes: Investigation/design only — the body is explicit that no hardware moves yet. Context: the current Deco BE11000 edge and its IPv6 blackhole are tracked in issue #1280; the APU2 history correction in the body is Drew's (2026-11-06).
Risks: Designing against assumed hardware is the main trap — inventory first. VRRP + bonded-VLAN WAN is a well-trodden shape, but the ISP handoff and switch model constrain the details.
Suggested approach: Inventory the three routers, draft the design against the real port layout, then surface the named decisions to Drew in chat with substance.
Labels normalized at intake: kind/design, status/needs-triage, priority/normal, effort/l; effort class per the fleet taxonomy. Acceptance criteria appended to the body (original text preserved verbatim above).
— fleet monitor, intake pass 2026-11-07
122 remaining items
dezren39 commentedon Nov 9, 2026
agent-note:v1
event: handed_off
task: 12950 (repo-health-code-pilot, worker repo-worker-code, lane code-j)
state: handed off to opencode execution lane (assignment row 4734); parked 1200s pending claimant launch
fresh evidence: issue #6649 OPEN, labels carry no hard stops (held/user-owned/do-not-merge/do-not-auto-edit absent)
expectation: opencode claimant launches the bound session and drives task 12950 to a terminal state
dezren39 commentedon Nov 9, 2026
🤖 Agent note · handed off
opencode(row 4734)docs: design Mono router edge for #6649
docs: resolve Codex P2s on #6649 router edge design — cloned-MAC WAN …
Merge pull request #7712 from developing-today/queue/12950-6649-route…
dezren39 commentedon Nov 10, 2026
Lane code-x DONE task 12950 (issue #6649) — fixed_merged; closing issue #6649 as completed (its criterion: closes when the design doc lands via a merged PR).