Skip to content

rollout(fleet): OpenCode-half pilot on the code queue + extension to opencode/openchamber/nix (OpenCode-half step 5) #1658

Open

Description

@dezren39

Part of the OpenCode-half redesign (design: files/opencode-half-redesign-2026-10-28.md in the keep-the-four-repos-healthy goal workspace; tracking: #1425). Drew's order, 2026-10-28: at least half of fleet tasks execute via OpenCode sessions.

Scope

Rollout sequencing once the pieces land (lane assignment, executor mode, keeper coverage, lane-share measurement):

  1. Pilot: enable the split on the code queue only (lanes A–D), concurrency cap 4 queue-spawned sessions, for one week.
  2. Pilot review against the exit criteria: rolling 7-day executed share ≥50%; zero evaporated claims attributable to the split; no rise in packet-defect or verification-failure rates attributable to session execution; miss reasons understood (a chronic saturated or quota share is a capacity finding, reported as itself).
  3. Extension: enable for the opencode, openchamber, and nix queues (their lanes share lane-shift-instruction.md, so the instruction change is written once) with the cap revisited against observed laptop load and pool headroom — noting the Go plan lapses (Personal Nov 2, Lab Nov 6) shrink workhorse seats during this window.
  4. Record the pilot outcome and the extension decision as comments on Deployed laptop opencode config has drifted from canonical HEAD — claude-code pause (PR #1316) not in effect live #1425 and in the design doc's rollout section.

Acceptance criteria

Activity

  1. developing-today commented on Oct 28, 2026

    @developing-today
    Contributor
  2. added
    priority/highImportant and time-sensitive
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    source/humanFiled directly by a human
    area/infraInfrastructure, deployment, and operations
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 28, 2026
  3. dezren39 commented on Oct 28, 2026

    @dezren39
    MemberAuthor

    Intake review

  4. dezren39 commented on Oct 31, 2026

    @dezren39
    MemberAuthor

    Status — owner order 2026-10-28, stalled, re-surfaced 2026-10-31 (supersession check vs #2132).

    Verdict of the owed supersession check, 2026-10-31:

    NOT superseded by #2132. #2132/#2153 reorganise two OpenChamber jobs; this step is the rollout sequencing for the OpenCode-half redesign itself (code-queue pilot → review against exit criteria → extension to the opencode/openchamber/nix queues) and depends on steps 2–4 (#1655 executor mode, #1656 binding-aware supervision, #1657 lane-share measurement) landing first. The conductor work neither sequences nor gates it.

    Queue state, verified by direct read 2026-10-31: live triage task 2626 (repo-health-code-pilot, queued, priority 70, attempts 0/3). No duplicate packet enqueued. Triage should treat the #1655–#1657 landing state as this step's gate, exactly as the issue body scopes it.

  5. 36 remaining items

  6. dezren39 commented on Nov 22, 2026

    @dezren39
    MemberAuthor

    Released by felix (outcome: free). Block verified still holding 2026-11-22: pilot gated on #1656 + #1657 closed and a named tracking home; #1657's unblock is task 5031's publication spec, routed to a cron.update-capable main-agent session; evidence note posted on #1658

  7. added and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 22, 2026
  8. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Tracking home ruled — Drew, 2026-11-22 ~20:27 CST

    Drew ruled: #1658 itself is the pilot-review tracking home. That satisfies the third element of this issue's resume condition (a live tracking home for the pilot review is confirmed — this issue). The remaining gates are unchanged: #1656 and #1657 must both be CLOSED before the rollout implementation task is enqueued and the one-week pilot clock starts. (#1657's publication wiring is unblocked by the stewardship-cycle restore and is being applied as a separate step.)

  9. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Decided: Treat #1658 itself as the pilot-review tracking home and keep rollout work dependency-gated until #1656 and #1657 are closed; do not start the pilot clock yet.
    Why: Live issue state shows #1656 and #1657 OPEN; #1657 owns daily lane-share publication, and starting now cannot satisfy the measured rolling 7-day >=50% exit criterion. Drew's 2026-11-22 ruling confirms #1658 as the tracking home.
    Undo: Re-run the gate check after both prerequisites close, then start the one-week code-queue pilot and record its review here.
    By: agent-next-06

  10. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Picked up by code-f — working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live while code-f posts progress markers; after 30 minutes of silence any other worker may pick this up.)

  11. added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    and removed on Nov 23, 2026
  12. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Code-f resume check (2026-11-23): pilot remains gated; no pilot clock started.

    Fresh state: #1656 remains OPEN (status:in-review), with its latest issue notes reporting the AC2 slice merged in PR #12879. #1657 remains OPEN with status:blocked + queue:blocked; it owns daily lane-share publication, which is required to measure the pilot’s rolling 7-day exit criterion. The tracking-home question is resolved: this issue (#1658) is the home, per the decision already recorded here.

    Decided: Keep step 5 dependency-gated until #1657 is closed and its daily publication is running; then recheck #1656’s final disposition and start the measured one-week pilot only when both prerequisites are discharged.
    Why: Current issue state shows #1657 open/blocked, and the acceptance criteria require a full measured week with daily lane-share. Starting now cannot produce that evidence. #1656’s latest comment reports PR #12879 merged, but the issue remains open/in review, so its gate is not yet formally discharged either.
    Undo: Re-run the gate check after the prerequisite issues close; start the pilot and record daily metrics here.
    By: lane code-f

    No independent implementation slice can satisfy an #1658 acceptance criterion while daily measurement is blocked in #1657. No duplicate rollout packet is created.

  13. dezren39 commented on Nov 23, 2026

    @dezren39
    MemberAuthor

    Released by code-f (outcome: free). Resume check recorded: #1657 remains open/blocked and #1656 remains open/in-review; pilot cannot yet produce required daily measured week. Tracking home confirmed as #1658. Return for recheck when gates discharge.

  14. added and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationsdesign/opencode-halfDesign: opencode-half - all issues of this effort carry iteffort/lLarge: multi-day or open-ended; expect staged check-insepic/opencode-platformReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmeta/follow-upFollow-up spun out of earlier workpriority/highImportant and time-sensitivequeue/blockedQueue or user escalation statequeue/queuedHas a queued queue tasksource/humanFiled directly by a humanstatus/blockedQueue or user escalation statestatus/triagedTriaged and routed (see agent note)task/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions