You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Suggestion: design records should carry an acceptance/verification line (AUDIT-7 Lane 5) #13882
Suggestion: design records should carry an acceptance/verification line (AUDIT-7 Lane 5)
Source: AUDIT-7 Lane 5 DESIGN-REVIEW, tracking #13876. Full-text pass over 440 design records in developing-today/code doc/.
Finding: 97 of 398 top-level design-family records (24%) and 31 of 42 subdir design records contain no acceptance / verification / test-plan / done-when signal at all. doc/DOCUMENTATION_PROTOCOL.md does not require one, so this is a convention gap, not a protocol violation — acceptance often lives only on the tracking issue, which makes the record alone insufficient to judge "done".
The strongest records in the estate do carry it (e.g. the fleet transport design #13752 names property tests with named oracles; the sign-request nonce design names its proptest oracle). Suggestion: add one required line to the design-record convention — "Verified when: …" naming the oracle — and backfill opportunistically as records are touched, heads/programmes first. Full per-record list is in the Lane 5 report ledger (doc/, AUDIT-7 Lane 5 report).
Activity
developing-today commentedon Nov 24, 2026
CODE-5098