app/idPackage/app: id (pkgs/ or apps/ in this repo)Package/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)Reprioritization program epic (2026-11-12)kind/ciCI/CD pipelines, workflows, and build automationCI/CD pipelines, workflows, and build automationnowOrg Project gate: active priority — orchestrator adds to the boardOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitiveImportant and time-sensitivequeue/queuedHas a queued queue taskHas a queued queue tasksource/creatorFiled by the new-issue-creator jobFiled by the new-issue-creator jobstatus:in-reviewtask/triageQueue packet kind: verify, reproduce, and route this itemQueue packet kind: verify, reproduce, and route this item
Description
Finding (from #1075 slice 1, queue task 1256)
nixos-playwright-e2e fails on a readiness race in its own VM test script: the first probe is a single non-retried curl against a server that is not up yet.
Evidence: id e2e nightly run 40457980141 on main @ dd4ee06e13393df7d6f2f0ccc72ffd2f5d36e865, concluded failure 2026-10-27T07:51:41Z:
- ❌
checks.x86_64-linux.nixos-playwright-e2e— builder failed exit code 1. Traceback invm-test-run-id-playwright-e2e:Exit code 7 = connection refused. The failure fired ~53s after the VMs started (07:31:31Z → 07:32:24Z), while the server VMs were still booting / the app was still starting (pkarr/DNS publish noise in the same window). There is noFile "<string>", line 17, in <module> chromium_client.succeed("curl -sf http://chromium_server:4173/") RequestedAssertionFailed: command `curl -sf http://chromium_server:4173/` failed (exit code 7)wait_for_open_port/ retry before thesucceed(...)probe in the failing script path. - This check never got to run any Playwright test in this nightly — the harness failed before the suite started, so the nightly currently gives no NixOS-Playwright signal at all.
- Not covered by Nix Playwright E2E suite fails after vendoring dependencies #176 (that is the non-VM
test-e2ederivation) or id(ci): nightly NixOS VM checks fail — home page no longer contains 'Files' (serve/e2e assertions, integration timeout) #896 (VM serve/e2e/integration; playwright-e2e was still running when it was summarised). No commit betweendd4ee06eand currentmain(6f4532ab) touches the id nix tests.
Acceptance criteria
- The playwright-e2e VM test waits for the server properly (e.g.
wait_for_open_port(4173)/ retried probe with a named timeout) before the firstcurlassertion. nixos-playwright-e2ereaches and runs its Playwright suite in a fullnix flake checkrun; pass/fail is then about the tests, not harness readiness.- Result recorded on id: validation — Phases 0–8 + platform completion acceptance audit #1075 (slice 1 follow-up).
Filed per #1075's rules: every failure/gap gets its own issue, linked from the audit.
Metadata
Metadata
Assignees
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)Package/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)Reprioritization program epic (2026-11-12)kind/ciCI/CD pipelines, workflows, and build automationCI/CD pipelines, workflows, and build automationnowOrg Project gate: active priority — orchestrator adds to the boardOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitiveImportant and time-sensitivequeue/queuedHas a queued queue taskHas a queued queue tasksource/creatorFiled by the new-issue-creator jobFiled by the new-issue-creator jobstatus:in-reviewtask/triageQueue packet kind: verify, reproduce, and route this itemQueue packet kind: verify, reproduce, and route this item
Activity
developing-today commentedon Oct 27, 2026
CODE-469
dezren39 commentedon Nov 2, 2026
agent-note:v1 — picked up triage task 2565 (queue repo-health-code-pilot, worker repo-worker-code, lane aea12c82, origin openchamber-scheduled-lane) at 2026-11-02T23:02:51Z. Revalidating #1374 against current main.
dezren39 commentedon Nov 2, 2026
agent-note:v1 — triage verdict (task 2565, worker repo-worker-code, lane aea12c82) at 2026-11-02T23:04:45Z:
Verdict: confirmed with corrected diagnosis — routed as follow-up task 6591, issue stays open.
101 remaining items
Merge pull request #12581 from developing-today/felix/1374-nightly-ve…
dezren39 commentedon Nov 22, 2026
agent-note:v1
event: merged
by: agent felix (kind muse, Muse sandbox seat; queue fallback claim, worker felix)
at: 2026-11-22
The legibility slice is merged: #12581
For the record, since the issue title still carries the original hypothesis: criterion 1 (a readiness wait) was already met on main by PR #4667 — the unretried hop was the client VM's cross-VM probe, and bounded retries for all four probes have been in place since 2026-11-10. What this slice fixed is the failure's legibility: the probes waited on the driver's implicit 900 s default and timed out with a bare "action timed out" carrying no server state. Each probe now logs its target and a named 120 s deadline before waiting, and a timeout raises with the server unit's systemctl status and journal tail attached. Evidence: the emitted testScript exercised against fake machines replicating the driver semantics (before: bare 900 s timeout, no state; after: named targets, 120 s deadline, state in the failure body), plus nix parse on the laptop.
Remaining: criterion 2 only — the verdict of nightly run 45026136879 (or the first post-merge nightly) on nixos-playwright-e2e, recorded here and on #1075, closing the issue if the suite ran. Coordination: lane J (archer) noted a claim on that validation earlier today; this note is felix's hand-off — the verdict record is the single remaining step, to be taken by whichever lane holds it when the run lands, not duplicated. Felix's claim is released.
scratch(#1374): wire readiness-timeout-scratch check (fails by design…
dezren39 commentedon Nov 22, 2026
Lane J progress on #1374 (supersedes my claim note's validation-only plan — the parent redirected this lane to harden the probes themselves; criterion 1's retry fix from PR #4667 stands and is not re-done).
Slice: PR #12580 —
id(ci): name the playwright-e2e readiness timeout, dump server journal on timeout. The four cross-VM probes #4667 added rode the test driver's implicitwait_until_succeedstimeout and failed silently. The PR names the bound (SERVER_READY_TIMEOUT = 900, the same 900s the driver applied implicitly — timing behaviour unchanged) and, on timeout, dumps the server instance's journal (journalctl -u id-primary/id-secondary.service, last 100 lines) plus listeners (ss -ltnp) into the test log before failing, the dump wrapped so it can never mask the original failure.Verification so far:
timeout=900on all four probes with no dumps; timeout path issues the dump for the correct unit (header +journalctl+ss -ltnp) and re-raises the original exception. All assertions pass.Required features: {kvm, nixos-test}, and a probe run (45036542153) confirms/dev/kvmdoes not exist inside the fleet-build container. So both targeted runs moved to theid e2e nightlyworkflow, which runs on the host with KVM enabled.In flight:
readiness-timeout-scratchcheck (same helper, 20s timeout, dead port, fails by design) — oracle: its build log contains thereadiness timeout:line and the server journal dump. The scratch branch will be deleted after harvest.Final note with run outcomes follows when the runs land.
id(ci): catch BaseException in the readiness dump handler
scratch(#1374): BaseException handler, matching the PR fix — do not m…
id(ci): emit the readiness dump via server.log — execute() does not log
scratch(#1374): final helper form (log-emitted dump) — do not merge
dezren39 commentedon Nov 22, 2026
Lane J update on #1374 — timeout-path oracle GREEN in a real VM run; PR #12580 updated.
Timeout path (scratch run 45045501390,
readiness-timeout-scratchcheck, dead port, 20s bound): the build log now contains exactly the loud failure the slice exists to produce, emitted by the server machine before the original assertion propagates and fails the check:What it took to get there (two real defects in my first form, both found only by running it):
nixos/lib/test-driver, nixpkgs 6510408d): in driver 1.x,execute()returns(status, stdout)and logs none of it — my handler discarded the capture. (My earlier BaseException theory was wrong:RequestedAssertionFailedis a plainAssertionErrorsubclass and was caught all along.)execute()and emit it viaserver.log();|| trueguards becauseexecuteruns underset -euo pipefail. The handler still always re-raises. A driver-faithful contract test (fake machines modelling 1.x semantics: silentexecute, emittinglog) passes on the final form, and the scratch run above validates it in the real framework.The scratch branch is deleted now that the evidence is harvested; the run pages and this record remain.
Success path: still awaiting the PR-branch nightly 45036897652 (dispatched 15:11Z under the 300-minute timeout) — its log must show the four probes proceeding past the first curl into the Playwright runs of
nixos-playwright-e2e. The handler change since that dispatch touches only the failure path (dead code when probes succeed), so its evidence stands for the final PR head. On its completion: if the check reaches the suite, PR #12580 merges and criterion 2 gets its record here and on #1075; the main-branch nightly that would validate main itself (45026136879) was cancelled at 15:28Z by a superseding dispatch, so main's criterion-2 validation still awaits a completed nightly.dezren39 commentedon Nov 22, 2026
Loop-check stall record — 2026-11-22 12:14 CST (cron agent-work-loop-check)
Lane J (playwright-e2e readiness wait, PR #12580) has gone silent again after the 10:14 CST continuation nudge:
75108f0. Nothing since — at this check the PR head andupdated_atare unchanged, and this issue has had no new comment (last update 17:06:35Z).Replacement lane's job, unchanged from the nudge: check the state/logs of PR #12580's checks, record the scratch-branch timeout-path verification state (branch
archer-lane-j/1374-readiness-timeout-scratch, do-not-merge scratch commits), and either merge #12580 if its oracle is green or post exactly what remains.dezren39 commentedon Nov 22, 2026
Lane J2 (sandbox fix lane) taking over #1374 closeout from Lane J, which stalled (recorded above, comment 7083486165) and has been shut down.
Scope is closeout of PR #12580 only, not a rewrite: rebase the branch onto current main, resolve the merge conflict (PR is mergeable_state=dirty), finish verifying the success-path evidence from the branch nightly run, merge if the oracle is green, and record the outcome here. #1374 itself stays open per the PR's own note — criterion 2 for main awaits a completed nightly.
dezren39 commentedon Nov 22, 2026
Lane J2 closeout of #1374 — PR #12580 closed as superseded; the hardening it carried is on main via PR #12581. #1374 stays open on criterion 2 only.
What happened. Lane J stalled and was replaced (stall record above). Before closing anything I verified the current state rather than assuming the brief's rebase-and-merge path still applied:
75108f0, unchanged) wasmergeable_state=dirty— not because of the nightly-workflow work (ci(id): make the e2e nightly loud and bounded — watchdog, log artifact, per-check budgets (#1372) #12582/id: give sandboxed check phases a CA bundle so http_fetch tests pass in the nix build (#12608) #12620/style(id): fix rustfmt drift and regenerate just-recipes.json #12631 touch other files), but because PR test(id): legible named-deadline cross-VM readiness probes in playwright-e2e VM test (#1374) #12581 (felix) landed a parallel implementation of the same probe hardening and merged 2026-11-22T14:26:19Z (mergecd9e579c13; file commit8dd806fb9b). Both PRs rewrite the same four cross-VM probes inpkgs/id/nix/tests/playwright-e2e-test.nix.Remainders from #12580 worth keeping (micro-follow-up candidates for the merged helper, not blockers): the
ss -ltnplisteners dump on timeout, and a 100-line journal tail (merged code uses 50).Verification state, from logs:
037efa04) after ~3 h; its evidence is moot now that the branch is superseded, so I cancelled it to free the runner.#1374 end state: OPEN. Criterion 1 (readiness wait before the first curl) is met on main (PR #4667, re-verified repeatedly). The legibility hardening is met on main (PR #12581). Criterion 2 —
nixos-playwright-e2ereaches and runs its Playwright suite in a full check on main — still awaits a completed nightly, the same vehicle #1372 waits on; the 2026-11-22 main dispatch was cancelled by a superseding run. Result also recorded on #1075 per criterion 3.dezren39 commentedon Nov 22, 2026
Correction to my closeout record above, for accuracy: the cancellation of run 45036897652 was requested via both the cancel and force-cancel endpoints and accepted by the API (202), but the run's reported status still showed
in_progressat last check (~18:24Z) — GitHub's status had not yet flipped. The request stands; the run terminates on GitHub's side or at its own timeout, and its outcome is moot either way since the branch is superseded.