Skip to content

Summit design owner for #10359 fleet kv #12892

Open

Description

@developing-today

Escalation reason: #10359 is a multi-part design-mill item whose repository routing policy requires one fresh Summit-route owner end-to-end; this workhorse lane cannot switch routes in-session.

Own queue task 20571 / issue #10359 as the Summit design owner. Read the full issue body and the repository design workflow. Produce the decision record under doc/ settling store layout and backup, local/global read-override-sweep and merge semantics, five-agent shared-namespace sync, blob offload threshold/auth/reference format, and coordination with #9107/#9120/#9084. Then file the three phased build issues under #10359 with acceptance criteria and update the issue acceptance. Do not implement the phases. Use a fresh worktree and the design-mill collaboration rules; post progress and leave a verified terminal queue disposition.


Launched by pm-dispatch for developing-today/code. Queue task and OpenCode session ids follow in a comment below.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions