You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Stage-3 epic #12694, slice S6. Design record: doc/2026-11-22T22-35-00Z_design_quota-plane-stage-3/ (issue #1177; hub copy files/stage-3-design-2026-11-22.md in the usage-billing-hub goal files).
Gate: work starts after Drew's review of the Stage-3 design doc (per #1177's method).
Scope: A weekly job that drafts pool re-weighting proposals as repo PRs against the route config — never silent config edits (#1177 hard rule). Each proposal PR carries: the forecast evidence (S1), the accuracy record behind it (S2), the shadow diff summary when the change was shadow-tested (S3), and the expected effect. Merge authority is unchanged (Felix/Drew); the controlled A/B gate #1342 applies before any proposal class becomes routine.
Acceptance criteria
The first proposal PR is generated by the job (not hand-written) with the full evidence pack attached, and is linked from this issue.
The generator provably cannot merge or push to main directly (PR-only path, shown in its config/permissions).
Picked up by felix — working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live while felix posts progress markers; after 30 minutes of silence any other worker may pick this up.)
S6 underway. Design read (D5), evidence base located: the generator consumes S2's accuracy ledger (backtest output today — ~/workspace/issue-12696/accuracy-ledger.json is the demonstration input; the same ledger shape is what live scoring will produce, so the input contract doesn't change when live rows flow), S1's forecast file and S3's shadow record as optional evidence-pack inputs. Proposal targets identified in the route config (.opencode/opencode.jsonc weighted provider routes) plus the caution margin (NEAR_PCT, derive.ts — the margin class D4 reserves to this mechanism).
Building: pure generator module + PR-only runner (allowlisted gh/git choke point — no merge path exists in code) + strict-argv CLI, in the aggregator's idiom. The first generated proposal PR follows once the generator runs on the real ledger.
agent-note:v1
event: implementation landed + first generated proposal opened
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
S6 is implemented. Implementation PR (unmerged, Felix reviews): #12762
First generated proposal PR — acceptance criterion 1: #12761 — opened BY the generator (not hand-written) against the S2 backtest ledger: widen the caution margin NEAR_PCT 85 → 90, +1/−1, with the full evidence pack as its body (S2 accuracy rows verbatim; S1/S3 sections name their absence — no live forecast/shadow products exist in the sandbox yet, and the pack says so rather than papering over it). Unmerged; the #1342 A/B gate applies before the margin class becomes routine.
Generator shape. Inputs: S2's accuracy ledger (required — backtest output today; the same shape scored from live rows later, so the contract doesn't change when live ticks flow), the route config (.opencode/opencode.jsonc), optional S1 forecast + S3 shadow products for the pack. Outputs: proposals (exact find/replace edit + evidence pack + a measurable expected-effect prediction S7 can score) and named evidence gaps. Two v1 classes: pool-weight shifts inside weighted routes, and the caution-margin step. The demonstration run grounded exactly one proposal and reported 13 gaps — the four Go workspaces' binding windows are too thin today (8/7/44/36 scored forecasts vs the 100 gate), zen-plans members match no forecast pool exactly, and the bare opencode-go weekly row (+1,903 min over 711 scored) was reported but excluded as S2's mixing artifact.
PR-only path — acceptance criterion 2. Every subprocess the generator runs passes one allowlist choke point (src/quota-reweight-pr.ts): gh surface is exactly pr create + pr list; git pushes validate to quota-proposal/… branches only. A merge is not a forbidden call in the generator — it is an unrepresentable one. Pinned by tests: the allowlist refuses pr merge / push-to-main before anything executes, and a fake-runner drive performs exactly branch+edit+push+create. Stated plainly: the generator runs under the owner's ordinary gh identity; the enforcement is this code path, not GitHub permissions.
Evidence (sandbox venue). Fail-before: new suites on pristine main fail (module absent). Pass-after: 19/19 new tests incl. the refusal paths (unscoreable carrying S2's reason verbatim, insufficient volume, undefined metrics, aggregate exclusion, counter-evidence); neighbours 60/60; tsc clean. No new dependencies. No schedule created — the weekly cadence is S7's (#12701), which calls this generator; the registry entry lands with it.
#12700 stays open for Felix's review of PR #12762 and the disposition of the generated proposal PR #12761.
agent-note:v1
event: direction defect fixed; corrected proposal filed
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
The caution-margin direction defect (found at review of the closed proposal PR #12761) is fixed on PR #12762's branch (fix commit 652af2f, with origin/main merged in; head 0c65353).
What was wrong: the generator stepped NEAR_PCT 85 → 90 on evidence that weekly walls arrive systematically EARLY (positive median signed wall error). A pool reads "near" at windowPercent >= NEAR_PCT (derive.ts poolState), so raising the threshold enters caution LATER and narrows the band — the opposite of the rationale. The class conflated "widen the margin of safety" with "raise the number".
The fix: the step direction is derived from the sign of the grounding pools' median signed wall error. Early walls (positive) step the threshold DOWN (85 → 80 — caution entered at a lower measured percent, earlier in the window); late walls (negative) step it UP. Both sides are gated identically (breadth ≥ 2 pools, ≥ 1 precision anchor, the existing volume gates); counter-evidence on the opposite side at any volume — materially disagreeing signs — produces the named counter-evidence-present gap, never a proposal. A symmetric floor joins the ceiling (MARGIN_MIN_PCT = 50, gap margin-at-floor). All step language now states the mechanism; "widen" is gone from the class.
Tests pin the direction: positive error → downward step (85→80), negative → upward (85→90), mixed signs (both sides fully gated) → named gap, plus both bounds. Evidence (sandbox): quota-reweight + quota-reweight-pr 23/23; neighbours (forecast, accuracy, shadow, anomaly, analytics, gather-map) 163/163; re-run on the merged tree 68/68; tsc --noEmit clean; biome lint clean (format drift in this file pre-exists at HEAD, unchanged in kind).
Re-run against the same S2 backtest ledger (~/workspace/issue-12696/accuracy-ledger.json, same inputs as the original run): the corrected generator grounded the margin proposal in the downward direction — 2 qualifying early-wall pools (meta +4741 min over 269 scored, anthropic:claude-pro 795.4 over 273), 1 precision anchor, 0 late-wall — and filed it through its own PR-only path: PR #12764 (NEAR_PCT 85 → 80, branch quota-proposal/caution-margin/NEAR_PCT/85-to-80). Run artifacts: ~/workspace/issue-12700/rerun-pr/. PR #12764 is a proposal like any other: it merges or not by the ordinary review path, and the #1342 A/B gate applies before the margin class becomes routine.
#12762 remains open and unmerged for Felix's review.
agent-note:v1
event: S6 merged; first corrected proposal held for Drewry's call on the #1342 gate
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
Merged: PR #12762 — the re-weighting proposal generator, including the caution-margin direction fix (fix commit 652af2f; direction derived from the sign of the grounding pools' median signed wall error, mixed signs yield the named counter-evidence-present gap, floor/ceiling gaps added; the pre-existing firing test that encoded the defect was updated with its oracle stated). Suites at review: reweight 23/23, neighbours 163/163, tsc clean.
The re-run on the S2 ledger filed the corrected proposal as PR #12764 (NEAR_PCT 85 → 80). Felix verified its evidence and direction and is HOLDING the merge: #1342's controlled A/B gate ("before any pool change lands") is open, and NEAR_PCT drives the pool-state derivation the babysitter consumes. The merge-vs-hold call is with Drewry; the PR stays open meanwhile. #12700's implementation scope is complete.
agent-note:v1
event: PR #12764 merged on Drewry's decision — the #1342-gate hold is discharged by his call
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
NEAR_PCT is now 80 on main (PR #12764, the corrected generator's proposal). Felix had held the merge for the #1342 controlled A/B gate; Drewry reviewed the choice and directed the merge on the backtest evidence. S6 (#12700) is complete: generator merged (PR #12762 with the direction fix), first proposal corrected (PR #12761 closed wrong-direction), second proposal merged. Remaining on the epic: S4 stays gated on S3's ≥1-week shadow record (clock starts at the laptop aggregator rebuild); S7 scores this change's expected effect once live rows flow.
Felix's completion note on this issue (2026-11-23T02:28:50Z) already declared S6 complete; this record performs the close that note announced. The stage-3 epic #12694 stays open on its remaining slices (S4/S5/S7 tracked separately).
Activity
developing-today commentedon Nov 22, 2026
CODE-4668
dezren39 commentedon Nov 23, 2026
Picked up by
felix— working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live whilefelixposts progress markers; after 30 minutes of silence any other worker may pick this up.)dezren39 commentedon Nov 23, 2026
agent-note:v1
event: progress
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
S6 underway. Design read (D5), evidence base located: the generator consumes S2's accuracy ledger (backtest output today — ~/workspace/issue-12696/accuracy-ledger.json is the demonstration input; the same ledger shape is what live scoring will produce, so the input contract doesn't change when live rows flow), S1's forecast file and S3's shadow record as optional evidence-pack inputs. Proposal targets identified in the route config (.opencode/opencode.jsonc weighted provider routes) plus the caution margin (NEAR_PCT, derive.ts — the margin class D4 reserves to this mechanism).
Building: pure generator module + PR-only runner (allowlisted gh/git choke point — no merge path exists in code) + strict-argv CLI, in the aggregator's idiom. The first generated proposal PR follows once the generator runs on the real ledger.
dezren39 commentedon Nov 23, 2026
agent-note:v1
event: implementation landed + first generated proposal opened
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
S6 is implemented. Implementation PR (unmerged, Felix reviews): #12762
First generated proposal PR — acceptance criterion 1: #12761 — opened BY the generator (not hand-written) against the S2 backtest ledger: widen the caution margin NEAR_PCT 85 → 90, +1/−1, with the full evidence pack as its body (S2 accuracy rows verbatim; S1/S3 sections name their absence — no live forecast/shadow products exist in the sandbox yet, and the pack says so rather than papering over it). Unmerged; the #1342 A/B gate applies before the margin class becomes routine.
Generator shape. Inputs: S2's accuracy ledger (required — backtest output today; the same shape scored from live rows later, so the contract doesn't change when live ticks flow), the route config (.opencode/opencode.jsonc), optional S1 forecast + S3 shadow products for the pack. Outputs: proposals (exact find/replace edit + evidence pack + a measurable expected-effect prediction S7 can score) and named evidence gaps. Two v1 classes: pool-weight shifts inside weighted routes, and the caution-margin step. The demonstration run grounded exactly one proposal and reported 13 gaps — the four Go workspaces' binding windows are too thin today (8/7/44/36 scored forecasts vs the 100 gate), zen-plans members match no forecast pool exactly, and the bare opencode-go weekly row (+1,903 min over 711 scored) was reported but excluded as S2's mixing artifact.
PR-only path — acceptance criterion 2. Every subprocess the generator runs passes one allowlist choke point (src/quota-reweight-pr.ts): gh surface is exactly
pr create+pr list; git pushes validate toquota-proposal/…branches only. A merge is not a forbidden call in the generator — it is an unrepresentable one. Pinned by tests: the allowlist refusespr merge/ push-to-main before anything executes, and a fake-runner drive performs exactly branch+edit+push+create. Stated plainly: the generator runs under the owner's ordinary gh identity; the enforcement is this code path, not GitHub permissions.Evidence (sandbox venue). Fail-before: new suites on pristine main fail (module absent). Pass-after: 19/19 new tests incl. the refusal paths (unscoreable carrying S2's reason verbatim, insufficient volume, undefined metrics, aggregate exclusion, counter-evidence); neighbours 60/60; tsc clean. No new dependencies. No schedule created — the weekly cadence is S7's (#12701), which calls this generator; the registry entry lands with it.
#12700 stays open for Felix's review of PR #12762 and the disposition of the generated proposal PR #12761.
dezren39 commentedon Nov 23, 2026
Released by
felix(outcome: done). S6 implemented: generator + PR-only runner + CLI in PR #12762 (unmerged, Felix reviews); generator opened its first proposal PR #12761 (NEAR_PCT 85->90, evidence pack attached, unmerged). Records: #12700 comment 7089288499, epic pointer #12694 comment 7089289077.fix(quota-plane): S6 caution-margin step direction follows the signed…
dezren39 commentedon Nov 23, 2026
agent-note:v1
event: direction defect fixed; corrected proposal filed
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
The caution-margin direction defect (found at review of the closed proposal PR #12761) is fixed on PR #12762's branch (fix commit 652af2f, with origin/main merged in; head 0c65353).
What was wrong: the generator stepped NEAR_PCT 85 → 90 on evidence that weekly walls arrive systematically EARLY (positive median signed wall error). A pool reads "near" at windowPercent >= NEAR_PCT (derive.ts poolState), so raising the threshold enters caution LATER and narrows the band — the opposite of the rationale. The class conflated "widen the margin of safety" with "raise the number".
The fix: the step direction is derived from the sign of the grounding pools' median signed wall error. Early walls (positive) step the threshold DOWN (85 → 80 — caution entered at a lower measured percent, earlier in the window); late walls (negative) step it UP. Both sides are gated identically (breadth ≥ 2 pools, ≥ 1 precision anchor, the existing volume gates); counter-evidence on the opposite side at any volume — materially disagreeing signs — produces the named counter-evidence-present gap, never a proposal. A symmetric floor joins the ceiling (MARGIN_MIN_PCT = 50, gap margin-at-floor). All step language now states the mechanism; "widen" is gone from the class.
Tests pin the direction: positive error → downward step (85→80), negative → upward (85→90), mixed signs (both sides fully gated) → named gap, plus both bounds. Evidence (sandbox): quota-reweight + quota-reweight-pr 23/23; neighbours (forecast, accuracy, shadow, anomaly, analytics, gather-map) 163/163; re-run on the merged tree 68/68; tsc --noEmit clean; biome lint clean (format drift in this file pre-exists at HEAD, unchanged in kind).
Re-run against the same S2 backtest ledger (~/workspace/issue-12696/accuracy-ledger.json, same inputs as the original run): the corrected generator grounded the margin proposal in the downward direction — 2 qualifying early-wall pools (meta +4741 min over 269 scored, anthropic:claude-pro 795.4 over 273), 1 precision anchor, 0 late-wall — and filed it through its own PR-only path: PR #12764 (NEAR_PCT 85 → 80, branch quota-proposal/caution-margin/NEAR_PCT/85-to-80). Run artifacts: ~/workspace/issue-12700/rerun-pr/. PR #12764 is a proposal like any other: it merges or not by the ordinary review path, and the #1342 A/B gate applies before the margin class becomes routine.
#12762 remains open and unmerged for Felix's review.
dezren39 commentedon Nov 23, 2026
agent-note:v1
event: S6 merged; first corrected proposal held for Drewry's call on the #1342 gate
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
Merged: PR #12762 — the re-weighting proposal generator, including the caution-margin direction fix (fix commit 652af2f; direction derived from the sign of the grounding pools' median signed wall error, mixed signs yield the named counter-evidence-present gap, floor/ceiling gaps added; the pre-existing firing test that encoded the defect was updated with its oracle stated). Suites at review: reweight 23/23, neighbours 163/163, tsc clean.
The re-run on the S2 ledger filed the corrected proposal as PR #12764 (NEAR_PCT 85 → 80). Felix verified its evidence and direction and is HOLDING the merge: #1342's controlled A/B gate ("before any pool change lands") is open, and NEAR_PCT drives the pool-state derivation the babysitter consumes. The merge-vs-hold call is with Drewry; the PR stays open meanwhile. #12700's implementation scope is complete.
dezren39 commentedon Nov 23, 2026
agent-note:v1
event: PR #12764 merged on Drewry's decision — the #1342-gate hold is discharged by his call
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
NEAR_PCT is now 80 on main (PR #12764, the corrected generator's proposal). Felix had held the merge for the #1342 controlled A/B gate; Drewry reviewed the choice and directed the merge on the backtest evidence. S6 (#12700) is complete: generator merged (PR #12762 with the direction fix), first proposal corrected (PR #12761 closed wrong-direction), second proposal merged. Remaining on the epic: S4 stays gated on S3's ≥1-week shadow record (clock starts at the laptop aggregator rebuild); S7 scores this change's expected effect once live rows flow.
dezren39 commentedon Nov 23, 2026
Done record — Lane VP (archer). Closing as completed: the work landed and was recorded on this issue, but the close itself never took effect.
Fresh first-hand verification (GitHub API, this pass):
3e40f4862e32) on Drew's decision discharging the Controlled pool tests: A/B real task batches before any pool change lands #1342 gate.0c9827bc1be8); both proposals reached main exclusively through PRs (proposal(quota-plane): widen the caution margin NEAR_PCT 85 → 90 (weekly walls arrive systematically early) #12761 closed, proposal(quota-plane): lower the caution threshold NEAR_PCT 85 → 80 — pools enter caution at a lower measured percent (weekly walls arrive systematically early) #12764 merged) — no direct push path was used or exists in the merged runner.Felix's completion note on this issue (2026-11-23T02:28:50Z) already declared S6 complete; this record performs the close that note announced. The stage-3 epic #12694 stays open on its remaining slices (S4/S5/S7 tracked separately).