area/infraInfrastructure, deployment, and operationsInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insLarge: multi-day or open-ended; expect staged check-insepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itEpic: lab-cluster - all issues of this effort carry itkind/featureNew feature or capability requestNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudFully doable remotely: design, config, code, cloudsource/creatorFiled by the new-issue-creator jobFiled by the new-issue-creator jobstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsQueue packet kind: bounded fix with reproduction and targeted tests
Milestone
Description
Dashboard: project page + complexity-weighted progress visualization
What
A pluggable dashboard page per project Area (org Project #4), following the /dns precedent (#906), seeded with lab-cluster. It renders the project's standard home from its sources instead of a hand-maintained copy:
- Project description + latest status: from
planning/roadmaps/<project>.mdand the newestdoc/<UTC>_status_<project>/record in the owning repo. - High-level items: the Project Bump build/buck/preludes/buck2-prelude from
3a02ea3to9530656#4 rows for that Area (Kind=Epic). - Work structure: the epic → sub-issue tree from GitHub, with blocks/blocked-by edges.
Visualization (the point of this issue)
Progress must reflect complexity and depth, not issue counts alone:
- Weights from
effort/*labels: xs=1, s=4, m=12, l=40 (l flagged open-ended). Unsized issues shown as unsized weight, never silently zero. - Per section (epic): weighted progress bar (closed weight / total weight) with raw count as the secondary number; hands queue = open weight by
mode/*(physical + hybrid weight waiting on hands vs online weight); blocked weight and longest dependency chain (depth). - Link graph: epic → issue tree; node size = weight, color = status, border = mode (solid online, dashed hybrid, thick physical); edges = parent / blocks.
- Project header: weighted % first, counts second, deepest chain and physical weight remaining as headline numbers.
Seed data (filed 2026-10-26)
Epics #1080, #1081, #1083, #1084, #1085, #1086, #1087, #1088, #1090, #1091, #1092, #1093 (Area=lab-cluster, Kind=Epic in Project #4), with 13 detailed sub-issues under epics 1–3 (#1094–#1106). Spec: goal workspace files/project-structure-spec-2026-10-26.md (Muse goal goal_ba17a5777c21).
Acceptance
- /projects gains a per-Area project page; lab-cluster renders description, latest status, epic rollup, hands queue, and the link graph from live data.
- Weighted numbers on the page match a hand-checked sample (one epic computed by hand from its sub-issues' labels).
- A project with flat, trivial issues reads visibly different from a deep, heavy one.
Metadata
Metadata
Assignees
Labels
area/infraInfrastructure, deployment, and operationsInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insLarge: multi-day or open-ended; expect staged check-insepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itEpic: lab-cluster - all issues of this effort carry itkind/featureNew feature or capability requestNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudFully doable remotely: design, config, code, cloudsource/creatorFiled by the new-issue-creator jobFiled by the new-issue-creator jobstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsQueue packet kind: bounded fix with reproduction and targeted tests
Activity
developing-today commentedon Oct 27, 2026
CODE-247
dezren39 commentedon Oct 27, 2026
Seed note: the Grist 'Program roadmap' table behind the dashboard currently has 6 basement-cluster rows. Reconciling those rows 1:1 with the 12 seeded epics (#1080, #1081, #1083-#1088, #1090-#1093) is part of this page's data work - the Project #4 pool is the source of truth once reconciled; the Grist rows should either mirror it or be retired in its favour, not drift independently.
dezren39 commentedon Oct 29, 2026
🤖 Agent note · picked up
dezren39 commentedon Oct 29, 2026
🤖 Agent note · done (triage verdict: CONFIRMED, routed)
39e8410b(2026-10-28). What exists: the Project Bump build/buck/preludes/buck2-prelude from3a02ea3to9530656#4 pool on /projects (pm-stack/aggregator/src/projects.ts, items carry labels/state/area/kind) and a per-project page at /program/lab-cluster (renderProgramProject, registry insrc/project-config.ts, from impl(aggregator): /program hub + /program/<project> pages for all configured projects #1121) — but both render counts only. Verified absent from the aggregator: any effort/* weighting (no weight map xs=1/s=4/m=12/l=40), weighted progress bars, hands-queue weight bymode/*, blocked weight, chain depth, and the epic→sub-issue link graph (the pool query fetches no parent/blocks edges).39e8410b1a23b99c9cb1f93c2ce869830a916c0668 remaining items
dezren39 commentedon Nov 17, 2026
Agent note — picked up (task 19427, lane any-m, 2026-11-17)
State: in-progress.
Working the #1108 remainder only (per task 18077's triage): the per-Area project page in pm-stack/aggregator must render the project's description from
planning/roadmaps/<project>.mdand its latest status from the newestdoc/<UTC>_status_<project>/record, from live/collected data, with honest-absence states. Slice 1 (PR #2373) and the #1122 graph split (PR #2831) are already merged and are not being reworked.Branch:
queue/19427-1108-dashboard-status(worktree on the laptop, from origin/main 6f18b60). Seed: lab-cluster —planning/roadmaps/basement-cluster.mdanddoc/2026-10-27T03-14-08Z_status_basement-cluster/.Merge pull request #11139 from developing-today/queue/19427-1108-dash…
dezren39 commentedon Nov 17, 2026
Agent note — done (task 19427, lane any-m, 2026-11-17)
State: fixed_merged — PR #11139 merged at 888530d, closing this issue.
The #1108 remainder is landed: the per-project page (and its JSON twin) now derives the project description from
planning/roadmaps/<slug>.mdand the latest status from the newestdoc/<UTC>_status_<slug>/record, read from the code checkout at request time — for lab-cluster that renders the roadmap's own prose and the 2026-10-27T03-14-08Z status record ("Basement cluster status, 2026-10-26"), verified by hand-check against the real record before merge. Absences render explicitly (no prose / no status record), and the hand-pinned registry copies no longer render when a derived snapshot exists. Tests: newtest/project-doc.test.ts15/15; affected suites 116/116; typecheck clean.With Slice 1 (PR #2373) and the #1122 visualization split (PR #2831) already merged, every element of this issue's acceptance is now met.