Skip to content

impl(dashboard): project page + complexity-weighted progress visualization (seed: lab-cluster) #1108

Closed

Description

@dezren39

Dashboard: project page + complexity-weighted progress visualization

What

A pluggable dashboard page per project Area (org Project #4), following the /dns precedent (#906), seeded with lab-cluster. It renders the project's standard home from its sources instead of a hand-maintained copy:

  • Project description + latest status: from planning/roadmaps/<project>.md and the newest doc/<UTC>_status_<project>/ record in the owning repo.
  • High-level items: the Project Bump build/buck/preludes/buck2-prelude from 3a02ea3 to 9530656 #4 rows for that Area (Kind=Epic).
  • Work structure: the epic → sub-issue tree from GitHub, with blocks/blocked-by edges.

Visualization (the point of this issue)

Progress must reflect complexity and depth, not issue counts alone:

  • Weights from effort/* labels: xs=1, s=4, m=12, l=40 (l flagged open-ended). Unsized issues shown as unsized weight, never silently zero.
  • Per section (epic): weighted progress bar (closed weight / total weight) with raw count as the secondary number; hands queue = open weight by mode/* (physical + hybrid weight waiting on hands vs online weight); blocked weight and longest dependency chain (depth).
  • Link graph: epic → issue tree; node size = weight, color = status, border = mode (solid online, dashed hybrid, thick physical); edges = parent / blocks.
  • Project header: weighted % first, counts second, deepest chain and physical weight remaining as headline numbers.

Seed data (filed 2026-10-26)

Epics #1080, #1081, #1083, #1084, #1085, #1086, #1087, #1088, #1090, #1091, #1092, #1093 (Area=lab-cluster, Kind=Epic in Project #4), with 13 detailed sub-issues under epics 1–3 (#1094–#1106). Spec: goal workspace files/project-structure-spec-2026-10-26.md (Muse goal goal_ba17a5777c21).

Acceptance

  • /projects gains a per-Area project page; lab-cluster renders description, latest status, epic rollup, hands queue, and the link graph from live data.
  • Weighted numbers on the page match a hand-checked sample (one epic computed by hand from its sub-issues' labels).
  • A project with flat, trivial issues reads visibly different from a deep, heavy one.

Activity

  1. added
    kind/featureNew feature or capability request
    area/infraInfrastructure, deployment, and operations
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/onlineFully doable remotely: design, config, code, cloud
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    Seed note: the Grist 'Program roadmap' table behind the dashboard currently has 6 basement-cluster rows. Reconciling those rows 1:1 with the 12 seeded epics (#1080, #1081, #1083-#1088, #1090-#1093) is part of this page's data work - the Project #4 pool is the source of truth once reconciled; the Grist rows should either mirror it or be retired in its favour, not drift independently.

  4. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed on Oct 29, 2026
  5. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

  6. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · done (triage verdict: CONFIRMED, routed)

  7. 68 remaining items

  8. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    status/blockedQueue or user escalation state
    queue/blockedQueue or user escalation state
    work/assignedQueue worker lifecycle state
    on Nov 17, 2026
  9. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Agent note — picked up (task 19427, lane any-m, 2026-11-17)

    State: in-progress.

    Working the #1108 remainder only (per task 18077's triage): the per-Area project page in pm-stack/aggregator must render the project's description from planning/roadmaps/<project>.md and its latest status from the newest doc/<UTC>_status_<project>/ record, from live/collected data, with honest-absence states. Slice 1 (PR #2373) and the #1122 graph split (PR #2831) are already merged and are not being reworked.

    Branch: queue/19427-1108-dashboard-status (worktree on the laptop, from origin/main 6f18b60). Seed: lab-cluster — planning/roadmaps/basement-cluster.md and doc/2026-10-27T03-14-08Z_status_basement-cluster/.

  10. added a commit that references this issue on Nov 17, 2026
  11. dezren39 commented on Nov 17, 2026

    @dezren39
    MemberAuthor

    Agent note — done (task 19427, lane any-m, 2026-11-17)

    State: fixed_merged — PR #11139 merged at 888530d, closing this issue.

    The #1108 remainder is landed: the per-project page (and its JSON twin) now derives the project description from planning/roadmaps/<slug>.md and the latest status from the newest doc/<UTC>_status_<slug>/ record, read from the code checkout at request time — for lab-cluster that renders the roadmap's own prose and the 2026-10-27T03-14-08Z status record ("Basement cluster status, 2026-10-26"), verified by hand-check against the real record before merge. Absences render explicitly (no prose / no status record), and the hand-pinned registry copies no longer render when a derived snapshot exists. Tests: new test/project-doc.test.ts 15/15; affected suites 116/116; typecheck clean.

    With Slice 1 (PR #2373) and the #1122 visualization split (PR #2831) already merged, every element of this issue's acceptance is now met.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itkind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudsource/creatorFiled by the new-issue-creator jobstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted tests

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions