Skip to content

task(cluster): engage an electrician (quotes + schedule) #1104

Open

Description

@dezren39

Engage an electrician (quotes + schedule)

Parent epic: #1083 (basement cluster program). Project home: planning/roadmaps/basement-cluster.md.

Using the task 3.1 brief: collect quotes from electricians serving Osseo WI, pick one with Drew, and schedule the work. Drew owns the vendor relationship and payment; Muse prepares comparisons and tracks scheduling (tracked goal: basement electrician, goal_55d3136785c6).

Acceptance: electrician chosen and a work date set, recorded here and on the electrician goal.

Activity

  1. added
    user/ownedA user is personally driving this; automation stays out
    area/infraInfrastructure, deployment, and operations
    effort/mMedium: expected under 1 day of work
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/hybridOnline work plus a physical step (power, cabling, KVM access to a real device)
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    Contributor
  3. developing-today commented on Nov 8, 2026

    @developing-today
    Contributor

    🤖 Agent note · blocked

  4. added this to the Lab cluster milestone on Nov 12, 2026
  5. dezren39 commented on Nov 16, 2026

    @dezren39
    MemberAuthor
    event: blocked
    worker: repo-worker-code
    lane: code-h
    session: openchamber-scheduled-lane
    task: 11426
    reason_class: escalated-to-user
    ```Re-triaged on fresh state: `user/owned` still present (hard stop) — engaging an electrician is a Drew-only action. Task blocked; tracked under epic #1083 + `planning/roadmaps/basement-cluster.md` (goal_55d3136785c6). No fleet lane will touch it until Drew dispositions.
    
  6. removed their assignment
    on Nov 20, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/hybridOnline work plus a physical step (power, cabling, KVM access to a real device)status/needs-triageNot yet triaged; needs a first lookuser/ownedA user is personally driving this; automation stays out

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions