Repository navigation
Description
Idea: native TUI client (ratatui)
From pkgs/id/TODO.md:
A high-performance TUI (ratatui or the best-performing Rust TUI stack) that works locally without a server, or connects to a local/remote server over iroh (not SSH). Custom efficient protocol: the server sends intents and bytes (e.g. 'draw this blob at 64x,16y at 256x256', kitty image protocol) instead of a raw terminal stream, with thought given to avoiding a second round trip for uncached blobs. Roughly three panels: room/object selector + search + pinned favourites | the interactive room/document or meta pages | a chatroom for the room/topic. Should cover what the website does, with native filesystem access and full control of the box.
Long-term idea, filed so it is tracked. Related: Phase 13 shell contract (#783, done) is the contract a TUI shell would implement.
Coordination (2026-10-26 reprioritization, per Drew): every id roadmap item now has its own GitHub issue, and priority encodes the order: (1) the path to Phase 12 — now + priority/high; (2) Phase 12 itself — next; (3) Phase 13 and long-term ideas — priority/low. The dashboard mirrors this list (org Project "Developing Today" #4, Area id-train; Grist Program roadmap, Area id). If this item turns out to be blocked, wrong, or superseded, park or close it with a note rather than letting it stall the queue — dropping an issue is always allowed; silently stalling is not.
Acceptance criteria
- A design note is recorded on this issue covering: the intent/byte protocol (incl. blob caching / no-second-round-trip), the three-panel layout, and local vs iroh-remote modes.
- The relationship to the Phase 13 shell contract (id: Phase 13 F13.1 versioned shell contract (client-server frame spec + conformance check) #783) is stated — what the TUI implements vs. what it adds.
- If adopted, a first implementation step is filed as its own issue; if dropped, the reason is recorded here.
Activity
developing-today commentedon Oct 27, 2026
CODE-215
dezren39 commentedon Oct 27, 2026
Intake review
Related: Phase 13 shell contract: #783 · sibling idea: native GUI client #1072 · source:
pkgs/id/TODO.mdNotes: Long-term, priority/low. The shell contract it would implement is done (#783), so the design note can be concrete about the contract surface rather than speculative.
Risks: Designing a custom protocol without the round-trip analysis the TODO asks for would bake in the latency the idea exists to avoid.
Suggested approach: Start from the shell contract's operations and map each to the intent protocol; call out where server-side state (blob cache) is required.
Labels were already normalized by the filer (kind, source/human, status/needs-triage, priority, effort, app/id all present); this pass appended the acceptance criteria above and adds
meta/enriched.🤖 Agent note · filed
dezren39 commentedon Oct 28, 2026
🤖 Agent note · picked up
17 remaining items
dezren39 commentedon Nov 8, 2026
🤖 Agent note · triaged (task 12557, lane code-x, direct)
Verdict: acceptance already satisfied — no remainder, no follow-up. Issue #1071 stays OPEN as the tracked long-term idea, by design.
This task is a second requeue from the same 2026-11-07 done-task-only audit (code#7016) that task 11890 (lane P) already triaged terminally today at 2026-11-08T02:36:00Z. I re-verified its conclusions with fresh reads this shift rather than re-deriving them:
pkgs/idat current main —ratatuiappears only inpkgs/id/TODO.mdand planning context. The idea is not secretly done; it is correctly parked as an idea.No fix packet is enqueued (there is no actionable remainder to scope, per task 11890's identical conclusion hours ago). Re-triage only if the low-priority bucket is picked up, the shell contract version changes, or a TUI implementation appears.
dezren39 commentedon Nov 8, 2026
🤖 Agent note · triage verdict — verdict STANDS, and this is the third identical re-queue today (loop recorded on #7016)
repo-worker-code), OpenChamber scheduled lanec29174f1-48e0-4b13-b4ff-9b73ab67e9abVerdict unchanged: this idea's acceptance criteria are already satisfied, and the issue stays open as the tracked long-term idea (priority/low), by its own coordination text. Re-verified fresh at 2026-11-08T10:19Z:
ratatuistill appears only in roadmap/planning docs, never inpkgs/id— no TUI exists, so the idea is neither implemented nor superseded.pkgs/id/src/shell_contract.rsin main) — so the design note's core claim still holds.Why it keeps coming back: the done-task-only audit (#7016) re-queues any issue whose triage task was marked done but which has no merged PR referencing it. For an idea issue that is correct behaviour by design — there will never be a PR — so each audit pass mints an identical triage task. This issue has now had three today (#11890 02:36Z, #12557 05:44Z, #12957 this run); #5880 had three and was closed this shift for the same reason.
Marking it so the next pass can distinguish it: label
status/idea-trackedadded (definition: tracked idea whose acceptance is satisfied; not a work item). The audit-side ask is recorded on #7016 — exempt issues carrying this label (or an equivalent decision-state marker) from re-queue, otherwise every roadmap idea on the dashboard will keep cycling forever.dezren39 commentedon Nov 17, 2026
agent-note:v1 — triage (queue task 18053, openchamber scheduled lane code-g)
Fresh check: #1071 is OPEN, labeled priority/low and status/idea-tracked, and describes itself as a long-term idea. Its stated predecessor, shell contract #783, is done. Nothing indicates that the TUI idea has become active work or been superseded. No implementation started and no follow-on packet is warranted; preserving the tracked low-priority idea is the correct disposition.
dezren39 commentedon Nov 17, 2026
agent-note:v1
lane: repo-worker-code (openchamber-scheduled-lane code-j)
state: triaged — deferred long-term idea
Fresh state 2026-11-17: #1071 OPEN. It is a Phase 13 long-term idea, which the 2026-10-26 reprioritization ranks priority/low. The acceptance design note (intent/byte protocol, three-panel layout, local vs iroh-remote, relation to the #783 shell contract) is not written in this run. Left open as a tracked idea; the design note is owed when Phase 13 is scheduled. No new packet filed.
id(tui-shell): record the TUI capability statement (shells v2 slice 2, …