Skip to content

feat(devcon26): restore EMS programme for preview testing - #77

Open
Elvis020 wants to merge 6 commits into
mainfrom
feature/devcon26-programme-preview
Open

Elvis020 wants to merge 6 commits into
mainfrom
feature/devcon26-programme-preview

Conversation

@Elvis020

@Elvis020 Elvis020 commented Nov 8, 2026 •

Copy link
Copy Markdown
Collaborator

Summary

Restore the EMS-powered programme and speaker directory for website preview testing, and make event calendar actions consistent across the homepage, All Events, and standalone event pages.

Programme and speakers

  • Load public EMS session times, titles, descriptions, and linked speakers at runtime.
  • Build the speaker directory from programme entries, deduplicated by speaker ID; retain names when photos fail.
  • Show separate empty and unavailable states, with a no-JavaScript explanation.
  • Use a fixed, GET-only public relay on website-owned Cloudflare previews, with request isolation, redirect rejection, and response size bounds.

Event calendar actions

  • Show Add to calendar on eligible homepage cards and standalone event pages, including direct loads and live-loaded content.
  • Share the provider picker across event entry points: Google event creation, Apple event subscription, Outlook address copying, and an ICS download for one-time import.
  • Keep individual-event addresses separate from the full calendar subscription, resetting the picker when switching contexts.
  • Align registration and calendar actions across phone and desktop layouts.
  • Preserve menu focus during background homepage refreshes and hide unavailable actions when live event eligibility changes.

Verification

  • Isolated pnpm build passed, including the existing build checks.
  • Browser checks passed at 320px, 390px, and 1440px for direct event loads, reloads, homepage navigation, provider URLs, copying, menu dismissal, and live eligibility changes. Earlier button alignment checks also covered 768px.
  • Targeted delayed-refresh checks passed for focus restoration after Escape, Close, and successful Copy.
  • git diff --check passed. Astra review completed, with the focus finding fixed and re-reviewed.
  • Read-only live EMS request returned 13 programme entries and one unique linked speaker on 8 November 2026.
  • Native calendar application subscription flows were not exercised. No EMS data was changed and no emails were sent.

This PR is for testing and must remain unmerged until explicitly approved.

- Replace the conference programme and speaker placeholders with
  published EMS sessions and a deduplicated directory of linked speakers.
- Show distinct empty and unavailable states and keep names visible when
  speaker portraits fail.
- Route website-owned previews through a fixed, bounded public Worker
  relay. Include documentation, regression checks, and review screenshots.

Verification: this commit reconstructs the previously tested website
tree exactly, including its programme and relay regression coverage.
@cloudflare-workers-and-pages

cloudflare-workers-and-pages Bot commented Nov 8, 2026 •

Copy link
Copy Markdown
Contributor

Deploying with  Cloudflare Workers  Cloudflare Workers

The latest updates on your project. Learn more about integrating Git with Workers.

Status Name Latest Commit Preview URL Updated (UTC)
✅ Deployment successful!
View logs
devcongress-website fecff71 Commit Preview URL

Branch Preview URL
Nov 10 2026, 02:37 PM

- Give event detail actions matching widths and 48px minimum heights, with an explicit 12px gap so registration and calendar buttons never touch.
- Center labels and hide the empty status element to avoid an unnecessary gap.
- Keep initial and live-loaded event card controls consistent, with full-width action pairs on phones and spaced wrapping on wider layouts.
- Record the UI correction in the changelog.

Verification: pnpm build passed with the existing programme, relay, attendance, donation, and checkout checks; git diff --check passed. Browser checks at 320px, 390px, 768px, and 1440px verified live event cards and detail pages, matching control heights, spacing, no horizontal overflow, and calendar-menu open/Escape behavior. Astra reviewed the three-file change with no findings.
- Add the calendar picker to homepage cards and standalone event pages so opening an event directly exposes the same options as All Events.
- Extract shared picker markup, styling, and behavior; preserve Google event creation, Apple event subscriptions, Outlook address copying, and the one-time ICS download fallback.
- Keep event-specific URLs and overview subscription state separate, and update calendar eligibility from live event data.
- Defer homepage card replacement while the picker is open and restore keyboard focus to the replacement trigger after refresh.

Verification: isolated pnpm build passed; browser checks passed at 320, 390, and 1440 pixels for direct loads, reloads, homepage navigation, provider URLs, copying, dismissal, and live eligibility changes. Targeted delayed-refresh focus checks passed for Escape, Close, and Copy. git diff --check passed. Astra final review completed with its focus finding resolved.
@Elvis020

Copy link
Copy Markdown
Collaborator Author

Pls don't merge this, waiting on Dede to finalize in EMS

Use “person is going” or “people are going” in both visible attendance variants and accessible labels, without changing how the count is calculated or retrieved.

Verification: attendance counter checks, pnpm build, git diff --check, and synthetic phone and desktop previews with a count of 23.
Show the dynamic count as people are coming, followed by Are you?, with singular wording for one person.

- Preserve the sticker and hanging-sign designs and counting behavior.
- Center the homepage sticker on phones without changing desktop alignment.
- Add a small decorative waving hand matched to each counter palette.
- Keep the accessible label complete and exclude the decorative icon.

Verification: focused counter checks, full pnpm build including donation and ticket checks, and git diff --check passed.
- Restore the count copy, icon and mobile alignment to their state before the two message commits.
- Keep the programme and calendar changes in this branch. The message ships through a separate PR.
- Verified the affected files match their pre-message state and the full website build passes.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant