Skip to content

eve#626: offer Adopt on terminal Claude rows on SSH hosts - #640

Merged
barelyworkingcode merged 9 commits into
mainfrom
epic/626-host-adopt
Oct 23, 2026
Merged

barelyworkingcode merged 9 commits into
mainfrom
epic/626-host-adopt

Conversation

@barelyworkingcode

Copy link
Copy Markdown
Owner

Closes #628

Epic #626 (owning parent barelyworkingcode/relay#588). Children: #627 (#639 pin, then the host-adopt PR). Stays a draft until the joint close task on barelyworkingcode/relay#588 (step c).

🤖 Generated with Claude Code

barelyworkingcode and others added 9 commits October 22, 2026 15:39
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Contract amendment 1 on eve#627.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
eve#627: pin fakerelay to relay's host-adopt epic head
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
eve#627: offer Adopt on SSH-host rows relay marks adoptable
@barelyworkingcode
barelyworkingcode marked this pull request as ready for review October 23, 2026 02:11
@barelyworkingcode

Copy link
Copy Markdown
Owner Author

Evidence, restated from #639 (pin, trivial) and #641 (eve#627), and the frozen-head verification on #628.

Review: no blocking findings (#641, Sonnet)
Journey: outside-adopt-host (screen; the nightly runs it); frozen head ae73cfe stack e628: SUMMARY pass=48 fail=0 blocked=1 notrun=11
Break-and-restore: put && !r.item.hostId back into showsAdopt: two G6.110 cases failed; restored byte for byte (#641)
Harness weakening: none (one journey added; nothing removed, skipped or loosened)
Main harness vs head: n/a: the added journey is a screen journey the nightly runs; the --stack run on the frozen head is green

@barelyworkingcode
barelyworkingcode merged commit 79af431 into main Oct 23, 2026
@barelyworkingcode

Copy link
Copy Markdown
Owner Author

merge-check: merged. approved, target, verified, contract, evidence, owner
Report: 2. The gates themselves: criterion removed npx playwright test and the --stack run pass on the epic head, on a fresh stack built with relay's epic head. (issue #628)

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Verify and close the host-adopt epic (eve)

1 participant