Skip to content

ci: raise the integration test timeout to 8 minutes - #51

Merged
mattmattox merged 1 commit into
mainfrom
ci/integration-timeout
Nov 10, 2026
Merged

mattmattox merged 1 commit into
mainfrom
ci/integration-timeout

Conversation

@mattmattox

Copy link
Copy Markdown
Contributor

The integration job runs go test -timeout 5m -short. On main (df997d6) the tests alone take about 240s, so a slow runner goes over the limit with no failing test.

That happened on #48 (run 42885906044). The suite stopped at 330s while TestTreeReservationsDoNotLeakBlocks had been running for 4s. #48's new tests add 0.7s. The rest came from runner noise: lock-heavy tests ran slower, for example TestMultiNodeConcurrentCreatesDoNotCollide took 27.8s against 9.5s on main.

8m keeps the job under its 10-minute timeout-minutes cap and leaves room for #29's lock confirmation cost.

🤖 Generated with Claude Code

Main's -short suite spends about 240s in tests against a 5m limit, so a
slow runner times out (seen on #48 at 330s with no failing test).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@mattmattox
mattmattox merged commit 76ab55f into main Nov 10, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant