Skip to content

Declare package wave targets and build hooks - #119

Merged
VolkerChristian merged 9 commits into
masterfrom
slim/declaration
Nov 15, 2026
Merged

VolkerChristian merged 9 commits into
masterfrom
slim/declaration

Conversation

@VolkerChristian

@VolkerChristian VolkerChristian commented Nov 14, 2026 •

Copy link
Copy Markdown
Member

Declares codexui on the 16 catalog targets with Qt6 Widgets/Network >=6.6, KF6Sonnet >=6.13 and libgit2 in standard repositories, depending on aisuite. The 16-line POSIX hook builds the documented native edition in Release under /usr, runs CTest through Xvfb and packages through CPack. Runtime spelling backends/dictionaries are declared build dependencies.

The owner authorized CODEXUI_TIMING_POLICY=report only in this package hook and waived the conversation-performance benchmark class with -E '^codexui-conversation-performance-'. Repository defaults remain strict. Timing overruns are retained in the canary report for separate performance work.

Corrects the status-color test probe to search the status column within the visible row header, excluding child rows; a padded section row's center is not the dot center. No product code or expected colors/tooltips change. Debian trixie reproduced the two integer-DPR failures before this correction and passed all four DPR variants afterward; local Qt 6.11 also passes all four. Production growth for this correction: zero; test delta: +14/-11.

Decision: Qt desktop application; 13 functional test failures under riscv64 emulation, tracked as an issue. Removes debian-{trixie,forky,sid}-riscv64 from this package's declaration under the owner's explicit release decision. Issue #121 lists all 13 failures, assertions/timeouts and canary links. Other products retain RISC-V; tests and repository defaults are unchanged by this target reduction.

Depends on Packages#1, merged first. All six supported native canary targets passed their CTest runs, produced packages and installed them locally; their packages are published. The ARMhf reusable-workflow check passed again. The final declaration change removes only three target entries; all 16 remaining targets validate against the catalog. Fresh signed APT/RPM installations and the final eligible RISC-V wave passed. Timing overruns remain recorded for separate performance work.

@VolkerChristian
VolkerChristian marked this pull request as ready for review November 15, 2026 10:39
@VolkerChristian
VolkerChristian merged commit 93eff0e into master Nov 15, 2026
@VolkerChristian
VolkerChristian deleted the slim/declaration branch November 15, 2026 10:39
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant