Changes proposed in this Pull Request

During clinker production, the calcination process leads to unavoidable process emissions independent of what's used to supply the heat.
For endogenous heat modelling and cement modelling it is helpful to have this emissions factor in technology data.

The data is from the IPCC Database EF ID 213926 and shows a value of 0.52 tonne CO2/tonne clinker produced
Compared to e.g. POSTED it is slightly higher:
total emissions - coal demand x coal emissivity
0.6361765 − 0.6634401×0.3361 = 0.413194282 tCO2/tclinker

Happy to hear thoughts on that

Checklist

  • Code changes are sufficiently documented; i.e. new functions contain docstrings and further explanations may be given in doc.
  • Data source for new technologies is clearly stated.
  • Newly introduced dependencies are added to environment.yaml (if applicable). not applicable
  • A note for the release notes doc/release_notes.rst of the upcoming release is included.
  • I consent to the release of this PR's code under the GPLv3 license.

Comment thread outputs/US/costs_2030.csv Outdated
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.5089,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php,Original values 0.5089 per Mt clinker,2015.0,,

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

do you mean "Original values 0.5089 [Mt] per Mt clinker"? or is Mt a typo?

@bobbyxng bobbyxng left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM, only a minor comment question on the original values' unit.

Comment thread inputs/manual_input.csv Resolved
Copilot AI review requested due to automatic review settings July 2, 2026 08:21

This comment was marked as low quality.

@toniseibold

Copy link
Copy Markdown
Contributor Author

@fneum Following problem:
If I compare the statistical data from JRC IDEES with the new calculated data I am way off (assuming that "process emissions" are solely coming from the clinker production). That would result in a gap of 16.25 Mt for the PyPSA-DE model scope alone.
To hit the values from JRC IDEES I would have to adjust the factor to 0.711.
image

@inevolin

Copy link
Copy Markdown

Thanks for adding this, and for the comparison against JRC-IDEES.

On the factor itself, the IPCC 2006 Guidelines Vol. 3 (IPPU), Ch. 2, Eq. 2.4 is the stoichiometric calculation @fneum asked for (Section 2.2.1.2). With the Tier 1 defaults — 65% CaO in clinker, all of it from CaCO₃ — the unrounded clinker emission factor is 0.65 / 0.5603 × 0.4397 = 0.5101 t CO₂ / t clinker. The default CKD correction is 2% (CFckd = 1.02), which gives the rounded Tier 1 default:

EFclc = 0.51 × 1.02 (CKD correction) = 0.52 t CO₂ / t clinker

So the 0.52 t_CO2/t_clinker in this PR is that CKD-corrected default (EFDB ID 213926 is the same value). I would keep this value and point the source field at Eq. 2.4 rather than only the EFDB search page, so the number can be reproduced from the document. For a non-monetary parameter, currency_year is probably better as -, consistent with other carbondioxide-output rows.

On the JRC-IDEES gap: I would not raise the clinker factor to 0.711 to match those totals. In JRC-IDEES-2021 the "Cement" subsector is labelled Cement (incl. lime) and is mapped to NACE C235 (manufacture of cement, lime and plaster) plus C236 (see the technical documentation, Annex, Table 15). Process emissions are taken from the UNFCCC inventories and reported in JRC-IDEES-2021_Industry_{CC}.xlsx, sheet NMM_emi, identifier PROCESS_EMI.ktCO2.{CC}.NMM.CEM. Those figures therefore include lime (and plaster) process CO₂, not clinker calcination alone; glass and ceramics are separate (…NMM.GLASS, …NMM.CER). For Germany in 2015 that Cement row is 17,501 kt CO₂ against 31,160 kt cement output (sheet NMM); EU27 in 2015 is 88,295 kt process CO₂ against 157,176 kt cement. A clinker-only 0.52 t/t factor applied to clinker implied by cement output is expected to fall short of that "Cement" process total — which is consistent with the shortfall you reported for the PyPSA-DE scope.

(As a side note: in the German NMM_emi sheet, process emissions are also 0.711 of total Cement CO₂ in 2015 and 2020, i.e. the process share of energy-plus-process emissions. That 0.711 share is not a clinker emission factor.)

I would keep 0.52 t_CO2/t_clinker, cite Eq. 2.4, and when comparing to JRC-IDEES treat the "Cement" process total as a cement-plus-lime aggregate rather than as clinker-only.

fneum and others added 2 commits November 15, 2026 18:06
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Source the 0.52 t_CO2/t_clinker factor from IPCC 2006 Vol. 3 Ch. 2
  Eq. 2.4 and state that it excludes fuel combustion and lime.
- Set currency_year to "-" for this non-monetary parameter.
- Correct the unit of cement dry clinker heat-input to MWh_th/t_clinker.
- Rebuild outputs for consistency with master.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

@fneum fneum left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Let's merge!

@fneum
fneum merged commit fd2bdf0 into master Nov 16, 2026
3 checks passed
@fneum
fneum deleted the clinker_process_emissions branch November 16, 2026 17:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants