| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.5089,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php,Original values 0.5089 per Mt clinker,2015.0,, |
There was a problem hiding this comment.
do you mean "Original values 0.5089 [Mt] per Mt clinker"? or is Mt a typo?
bobbyxng
left a comment
There was a problem hiding this comment.
LGTM, only a minor comment question on the original values' unit.
|
@fneum Following problem: |
|
Thanks for adding this, and for the comparison against JRC-IDEES. On the factor itself, the IPCC 2006 Guidelines Vol. 3 (IPPU), Ch. 2, Eq. 2.4 is the stoichiometric calculation @fneum asked for (Section 2.2.1.2). With the Tier 1 defaults — 65% CaO in clinker, all of it from CaCO₃ — the unrounded clinker emission factor is 0.65 / 0.5603 × 0.4397 = 0.5101 t CO₂ / t clinker. The default CKD correction is 2% (CFckd = 1.02), which gives the rounded Tier 1 default:
So the 0.52 t_CO2/t_clinker in this PR is that CKD-corrected default (EFDB ID 213926 is the same value). I would keep this value and point the source field at Eq. 2.4 rather than only the EFDB search page, so the number can be reproduced from the document. For a non-monetary parameter, On the JRC-IDEES gap: I would not raise the clinker factor to 0.711 to match those totals. In JRC-IDEES-2021 the "Cement" subsector is labelled Cement (incl. lime) and is mapped to NACE C235 (manufacture of cement, lime and plaster) plus C236 (see the technical documentation, Annex, Table 15). Process emissions are taken from the UNFCCC inventories and reported in (As a side note: in the German I would keep 0.52 t_CO2/t_clinker, cite Eq. 2.4, and when comparing to JRC-IDEES treat the "Cement" process total as a cement-plus-lime aggregate rather than as clinker-only. |
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Source the 0.52 t_CO2/t_clinker factor from IPCC 2006 Vol. 3 Ch. 2 Eq. 2.4 and state that it excludes fuel combustion and lime. - Set currency_year to "-" for this non-monetary parameter. - Correct the unit of cement dry clinker heat-input to MWh_th/t_clinker. - Rebuild outputs for consistency with master. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

Changes proposed in this Pull Request
During clinker production, the calcination process leads to unavoidable process emissions independent of what's used to supply the heat.
For endogenous heat modelling and cement modelling it is helpful to have this emissions factor in technology data.
The data is from the IPCC Database EF ID 213926 and shows a value of 0.52 tonne CO2/tonne clinker produced
Compared to e.g. POSTED it is slightly higher:
total emissions - coal demand x coal emissivity
0.6361765 − 0.6634401×0.3361 = 0.413194282 tCO2/tclinker
Happy to hear thoughts on that
Checklist