You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
No implementation, PR merge, package publication or production mutation until the owner approves the full sprint plan.
Evidence
Reviewed main 31b8d80686495c5d6dcac0846d6e5a2c8d4bce8b.
git ls-tree -r main build-env returns 49 tracked entries, including bin/pip, bin/pytest, activation scripts, pyvenv.cfg and lib64 symlink. These are machine-specific environment artifacts, not SDK source. The local 34 MB directory is NOT all tracked; only the 49 entries are in scope.
Preferred smallest change
Delete tracked build-env launchers/config/symlink after checking no CI/package script depends on them; retain pyproject dependency declarations and clean-wheel smoke. Ignore recreated developer environments. No history rewrite or deletion of a developer's actual environment.
Acceptance / negative-path tests
Fresh dependency install and existing tests/build work without tracked environment files; sdist/wheel inventories exclude virtualenv artifacts; repository reference search proves no required consumer.
Risk and PR gate
P2, isolated correction; preserve public API compatibility.
One focused issue PR; independent adversarial review must challenge deletion safety, public compatibility, failure recovery and whether a smaller deletion suffices. Include red/green test evidence and packed/installable artifact proof for any published SDK/MCP change. Merge only in the approved priority order after reviewer objections are resolved. Do not publish a breaking change as a patch. If already fixed at execution time, record evidence and skip without a cosmetic PR.
Reproduce on the execution-day main and confirm exact files/callers; the review baseline was the current-main SHA recorded in this issue. If already fixed or unnecessary, record proof and close without a cosmetic PR.
Record why deletion alone does or does not solve this; delete redundant code before adding a helper/guard/automation.
A focused failing regression/fixture first where practical; test the relevant malformed, absent, stale, rejected or timeout path as well as success. No production customer mutations or raw-secret evidence.
One independently revertible PR, containing the narrow correction and targeted tests; no unrelated cleanup. Explain public/API compatibility and rollback.
Independent adversarial reviewer tests the failure case, challenges the assumptions and simpler alternatives, and resolves every blocking finding.
Refresh against the actual merge base and rerun checks before merging in this plan's numbered order. Preserve all existing required checks; no bypass to hit ten.
Link merge SHA plus approved deployed/published artifact and post-release proof where relevant; otherwise mark release pending rather than claiming shipped.
Risk window: Only isolated low/medium-risk changes. If admission discovers authentication/entitlement, destructive migration, live ingestion semantics or a breaking interface change, hold and move to the next approved Friday/Saturday window.
Coverage-audit revision — current sprint admission
Plan v2: oilpriceapi-api#8015 supersedes earlier scheduling comments. Rank 62/70; Thursday, 2026-09-10, America/New_York. Low/medium-risk only; reclassify to a Friday/Saturday slot if boundary/compatibility risk is higher.
Coverage ledger: #8056. Inventory/pattern screening is complete; exhaustive semantic/runtime sign-off is not. Before implementation, review the complete affected file set and callers, revalidate against current main, supply the missing negative-path proof, and retain prior scope corrections. Prefer deletion, then simplification; correct behavior needs no PR.
No implementation is approved yet. After Karl approves: focused reversible PR → independent adversarial review → passing affected checks → merge in plan order → separately approved release/publish and artifact/customer-path verification. Maximum ten planned slots per night, not ten forced merges. If the dated window elapses before approval, re-anchor the calendar rather than backdate execution.
Activity
karlwaldman commentedon Sep 5, 2026
Adversarial sprint admission — rank 35/70
Scheduled Monday, 2026-09-07 (America/New_York) in the approval-gated seven-night plan. Planning only; no implementation or merge yet.
Narrow outcome: Delete tracked developer virtualenv launchers.
Required issue → PR → independent review → ordered merge evidence
Risk window: Only isolated low/medium-risk changes. If admission discovers authentication/entitlement, destructive migration, live ingestion semantics or a breaking interface change, hold and move to the next approved Friday/Saturday window.
karlwaldman commentedon Sep 5, 2026
Coverage-audit revision — current sprint admission
Plan v2: oilpriceapi-api#8015 supersedes earlier scheduling comments. Rank 62/70; Thursday, 2026-09-10, America/New_York. Low/medium-risk only; reclassify to a Friday/Saturday slot if boundary/compatibility risk is higher.
Intended outcome: Delete tracked developer virtualenv launchers.
Coverage ledger: #8056. Inventory/pattern screening is complete; exhaustive semantic/runtime sign-off is not. Before implementation, review the complete affected file set and callers, revalidate against current main, supply the missing negative-path proof, and retain prior scope corrections. Prefer deletion, then simplification; correct behavior needs no PR.
No implementation is approved yet. After Karl approves: focused reversible PR → independent adversarial review → passing affected checks → merge in plan order → separately approved release/publish and artifact/customer-path verification. Maximum ten planned slots per night, not ten forced merges. If the dated window elapses before approval, re-anchor the calendar rather than backdate execution.