Skip to content

Keep Spec publication readiness outside imported skills - #738

Merged
JacobStephens2 merged 1 commit into
mainfrom
triage
Oct 17, 2026
Merged

JacobStephens2 merged 1 commit into
mainfrom
triage

Conversation

@JacobStephens2

Copy link
Copy Markdown
Owner

This was generated by AI during triage.

Summary

A skill update restored upstream defaults that mark a Spec ready before its Tickets exist. Keep the repository-specific publication procedure outside imported skills so it survives their replacement.

publish Spec as needs-triage
  publish Tickets and native links
  read back every Ticket and blocking edge
  mark Spec ready-for-agent last

AGENTS.md requires this procedure; the README now describes the override accurately. Factory skills retain thirdshift-owned readiness.

Fixes #440.

Evidence

  • Before: imported to-spec marks the parent ready at creation; to-tickets prohibits parent edits. The README incorrectly claimed local copies already fix this.
  • After: repository-owned instructions explicitly override both defaults, retain incomplete Specs as unready, and require verification before the final label change. git diff --check passed; documentation consistency reviewed.
  • Documentation only. No builds or test suites run during triage; agent adherence has not been execution-tested.

Merge Danger

Door: two-way

Blast Radius: documentation

Changes the Day shift publication instructions in this repository. It adds no runtime enforcement and does not update other repositories' instructions.

@JacobStephens2
JacobStephens2 marked this pull request as ready for review October 17, 2026 02:04
@JacobStephens2
JacobStephens2 merged commit 3589e6e into main Oct 17, 2026
17 checks passed
@JacobStephens2
JacobStephens2 deleted the triage branch October 17, 2026 02:22
@JacobStephens2 JacobStephens2 mentioned this pull request Oct 17, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Ensure ready for agent label is added to spec at end of to tickets skill

1 participant