diff --git a/pm-stack/lineage-manifest-2026-11-12.md b/pm-stack/lineage-manifest-2026-11-12.md index cc5e55c0ac..9699b7a075 100644 --- a/pm-stack/lineage-manifest-2026-11-12.md +++ b/pm-stack/lineage-manifest-2026-11-12.md @@ -33,26 +33,37 @@ twice during this pass and was caught both times). `effort/xs|s|m|l`, plus status/queue/source families. New labels are created only to mirror an existing fleet label (same name/color/description). -## BOARD STATUS — BLOCKED on a token scope grant (needs Drew) - -Every Project-board read and write in this pass failed with -`INSUFFICIENT_SCOPES`: the automation `gh` token carries -`admin:org, gist, repo, user, workflow` and **no `project` / `read:project` -scope**. Labels, sub-issues, and epic creation are done; board membership, -Area/Status/Kind field values, and the dedicated ID-program view could not be -set or even verified. Remedy (interactive, Drew only): - -``` -gh auth refresh -s read:project,project -``` - -Follow-up pass owed once granted: (1) add the crate-split chain (#2056, #3195, -#3447, steps) and every epic issue in this manifest to Project #4 with Area set -and, for every epic issue, Kind=Epic set on its Project item (canonical per -pm-stack/README.md — dashboard epic membership comes only from Kind=Epic); -(2) create/verify the ID-program dedicated view on Project #4; (3) fleet-wide -board-membership audit against the epic taxonomy below; (4) lab-cluster boards -in the Clustered-Computing org. +## BOARD STATUS — route: `github.project-token` (scope grant CANCELLED) + +The laptop automation `gh` token carries `admin:org, gist, repo, user, +workflow` and **no `project` / `read:project` scope**, so in this pass every +Project-board read and write attempted with that token failed with +`INSUFFICIENT_SCOPES`. Labels, sub-issues, and epic creation are done. + +That is not a blocker, and nothing here waits on Drew: the laptop-token +project-scope grant is **CANCELLED** — it requires fresh sign-in through +Vertex SSO, which the fleet must never trigger or require (Drew ruling +2026-11-12, recorded in `pm-stack/design-reprioritization-2026-11-12.md`). +Do not schedule, suggest, or retry any token scope refresh for this purpose. + +Org Project #4 work uses the documented Projects v2 GraphQL route with +the `github.project-token` secret instead. That route is proven: on +2026-11-12 the six program views (views 16-21) were created on Project #4 +via `github.project-token` and verified by read-back, including the +ID-program dedicated view ("Program — P1 ID", view 16) — so the ID-program +view follow-up from the original pass is already done, not owed. + +Follow-up pass, via the `github.project-token` route: (1) add the +crate-split chain (#2056, #3195, #3447, steps) and every epic issue in +this manifest to Project #4 with Area set and, for every epic issue, +Kind=Epic set on its Project item (canonical per pm-stack/README.md — +dashboard epic membership comes only from Kind=Epic); (2) verify the ID-program +dedicated view on Project #4 (view 16, created 2026-11-12 — verify, do +not recreate); (3) fleet-wide board-membership audit against the epic +taxonomy below; (4) lab-cluster boards in the Clustered-Computing org. +Personal-repo (dezren39/*) issues cannot be placed on org Project #4 — +a settled constraint per the same ruling; their tracking home is labels ++ milestones + this register. ## Phase 1 — the pkgs/id crate split (complete except boards) @@ -427,5 +438,6 @@ children's parent pointers: 0 direct sub-issues). - All members of every cluster live in developing-today/code (other repos checked: zero carriers). The ambiguous multi-carrier labels remain - untouched, awaiting Drew's pick. The Project-board blocker above is - unchanged by this pass. + untouched, awaiting Drew's pick. The Project-board status above was + corrected on 2026-11-13 (task 15840, issue #9345): the scope grant is + cancelled and Project #4 work uses the `github.project-token` route.