diff --git a/ROADMAP.md b/ROADMAP.md index 8ec6315e0c..3c3f81285e 100644 --- a/ROADMAP.md +++ b/ROADMAP.md @@ -13,6 +13,7 @@ A row here records intent. It does not settle a product question and it is not a | The NixOS flake and infra manifests | [nixos-and-infra](planning/roadmaps/nixos-and-infra.md) | Inputs kept current by a daily job. No open work items of its own | | Repo-wide CI and automation | [repo-and-ci](planning/roadmaps/repo-and-ci.md) | The dispatch workflows, the Go build cache, stale PR triage — and the queue fleet program: lanes for every queue, OpenChamber session dispatch (#1233, #1234), pool & routing intelligence (#1343, #1340) | | The basement home cluster (Talos, Cozystack) | [basement-cluster](planning/roadmaps/basement-cluster.md) | Nothing built yet; research and planning done, hardware inventory and power come first | +| The PM stack (Kaneo, Pad, Grist, the aggregator, the queue fleet) | [pm-stack](planning/roadmaps/pm-stack.md) | Coherence epic #1184 in progress: one URL, fresh data, triage-able issues across the four repos | ## Now, across the repo diff --git a/planning/README.md b/planning/README.md index 3c49e573a5..0ad0d5ca44 100644 --- a/planning/README.md +++ b/planning/README.md @@ -21,6 +21,7 @@ The repo holds several projects that move on their own schedules, so each has it | The NixOS flake and the infra manifests | [`roadmaps/nixos-and-infra.md`](roadmaps/nixos-and-infra.md) | `nixos/`, `lib/`, `infra/` | | Repo-wide CI and automation | [`roadmaps/repo-and-ci.md`](roadmaps/repo-and-ci.md) | `.github/` | | The basement home cluster (Talos, Cozystack) | [`roadmaps/basement-cluster.md`](roadmaps/basement-cluster.md) | `infra/talos/`, `doc/` | +| The PM stack (project management) | [`roadmaps/pm-stack.md`](roadmaps/pm-stack.md) | `pm-stack/` | Each roadmap file groups its items by horizon. diff --git a/planning/roadmaps/pm-stack.md b/planning/roadmaps/pm-stack.md new file mode 100644 index 0000000000..0659162c07 --- /dev/null +++ b/planning/roadmaps/pm-stack.md @@ -0,0 +1,30 @@ +# Roadmap: PM stack + +The PM stack is how work in this repo and its related repositories is planned, picked up, and watched: Kaneo as the execution board, Pad as the planning layer, the Grist "Program roadmap" table as a mirror of these roadmap files, the aggregator in [`pm-stack/`](../../pm-stack/) as the cross-repo read view, and the queue fleet (lanes, orchestrator, stewardship) that picks work up. Design record: [`doc/2026-10-24T11-05-38Z_design_project-management-stack/`](../../doc/2026-10-24T11-05-38Z_design_project-management-stack/). How to read this file: [planning README](../README.md). + +The roadmap of record is this file and its siblings in `planning/roadmaps/`. The Grist table is a mirror of them (kept in sync by the roadmap-sync job); a Grist-only row is a seed or a mirror entry, never a second source of truth. + +## Now + +| Title | Status | Intent | Links | +| ----- | ------ | ------ | ----- | +| PM stack coherence: single URL, fresh data, triage-able, hierarchical | in-progress | The coherence epic for the whole stack: one place to look, data that is current, issues a worker can pick up without archaeology. | #1184 | +| This roadmap and the Grist mirror reconciliation | in-progress | The PM stack listed as a roadmap project, and the Grist-only PM rows marked as mirror rows so no roadmap statement contradicts a GitHub issue state. | #1216 | +| Minimum viable label adoption for opencode, openchamber, nix | in-progress | A shared minimum label set so cross-repo views built on labels are not blind outside this repo. Measured 2026-11-13: unlabeled open issues at 1/70 (opencode), 0/82 (openchamber), 3/51 (nix); the residual labeling is queued. | #1223 | +| Kaneo execution board anchors: GitHub App installed and connected | shipped | Phase 1 of the design: Kaneo on the laptop, the developing.today GitHub App installed on this repo and on dezren39/nix, two-way sync verified. Closed as completed. | #1007, PR #752 | +| Work-picking jobs consult the orchestrator's published priorities | dropped | Closed as not planned. Recorded here so the anchor named by #1216 is represented accurately: this is not current work, and the queue fleet as built does the picking instead. | #911 | + +## Next + +| Title | Status | Intent | Links | +| ----- | ------ | ------ | ----- | +| Connect opencode, openchamber, nix as Kaneo projects | planned | One Kaneo project per repo (the upstream one-repo-per-project limit), the developing.today app installed per repo. Seeded as a Grist row on 2026-10-24; tracked under the coherence epic. | #1184 | +| Projector and link registry (Turso) | planned | A webhook-fed projector joining GitHub issue, Kaneo task, Pad item, and roadmap row by ID. Never a source of truth. | #1184 | +| Aggregator UI: cross-repo WIP board and roadmap view | in-progress | Read-mostly and disposable: if it rots, every layer underneath still works standalone. The aggregator service exists and reads this repo's roadmap data today; the cross-repo board is the remaining scope. | #1184 | +| Apply external Grist doc changes live | shipped | External changes to the Grist doc apply without a full server restart. Closed as completed. | #1288 | + +## Later + +| Title | Status | Intent | Links | +| ----- | ------ | ------ | ----- | +| Live two-way sync between Grist and the roadmap files | idea | The 4-hourly roadmap-sync job is the interim measure; a live sync replaces it when the central-schema work lands. | #1184 |