diff --git a/site/index.html b/site/index.html index 48e93bb37..40c327a15 100644 --- a/site/index.html +++ b/site/index.html @@ -63,7 +63,7 @@
The humans are the day shift: you talk the idea through, write the spec and cut it into tickets. Coding agents work the third shift: give thirdshift a GitHub issue URL and it implements the issue, reviews its own work and delivers a pull request ready for review, or merges it when asked. Start a Run whenever you like, or let your operating system start passes on a schedule.
-How thirdshift works: an engineer's guide from issue to pull request, through Worktrees, agent review and Delivery. Architecture draws what runs where and who does each step. Documentation covers installation, commands and configuration. Videos explain it in under four minutes.
+How thirdshift works: an engineer's guide from issue to pull request, through Worktrees, agent review and Delivery. Architecture draws what runs where and who does each step. Documentation covers installation, commands and configuration. Videos explain it in a few minutes.
Built on Matt Pocock's skills: aihero.dev/skills · mattpocock/skills. Read every prompt and skill thirdshift sends.
Explainer videos · from half a minute to under four
+Explainer videos · from half a minute to about four
Five short videos, each for a different reader: a first glance, an overview for engineering leaders, two walkthroughs of a Run for engineers, and a getting-started tutorial. Pick the one for you.
+Seven short videos, each for a different reader: a first glance, a plain-terms overview for leaders who don't write code, an overview for engineering leaders, three for engineers (two walkthroughs of a Run and how it uses Matt Pocock's workflow), and a getting-started tutorial. Pick the one for you.
A video loads from YouTube only when you play it. Every video has captions; turn them on with the player's CC button.
Play
Leaders who don't code ·
+A plain-language overview in which a person on your team still decides what ships while thirdshift does the work overnight, shown with a real night on 12 October 2026, what happens when it can't finish, one limit to know, and what helps get the work right.
+
Play
+ Engineers ·
+The day shift grills, specs and tickets the work with Matt Pocock's skills, the third shift runs headless copies of them inside thirdshift's deterministic code, and a real Spec built on 19 October 2026 shows the handoff from issue to merged pull request.
+
Play
+ New users ·